Williston Reservoir Management Plan (Schedule A)

The Peace Project Water Use Plan Order required a number of physical works and monitoring study projects to examine specific fisheries, wildlife habitat, recreation, air quality, industrial use of water, First Nations and archaeological issues in the Williston Reservoir area.

Projects Studies Terms of Reference
GMSMON-15 Reservoir Wetland Habitat
GMSMON-16 Williston Debris Trends
GMSMON-17 Tributary Habitat Review

GMSMON-18 Williston Dust Control

GMSMON-20 Reservoir Recreation Use
GMSWORKS-14 Williston Reservoir Aerial Photos and Digital Elevation Model
GMSWORKS-16 Williston Reservoir Wetlands Inventory
GMSWORKS-17 Williston Reservoir Trial Wetland
GMSWORKS-18 Williston Debris Field Survey
GMSWORKS-19 Williston Reservoir – Trial Tributaries
GMSWORKS-20 Williston Dust Soil Mapping
GMSWORKS-21 Williston Dust Control Trials
  • GMSWORKS-21 Irrigation Trials
 
  • GMSWORKS-21 Vegetation Demonstration Trials
 
  • GMSWORKS-21 Vegetation Enhancement
 
GMSWORKS-22 Williston Targeted Debris Management

GMSWORKS-24 Finlay Reach Access Feasibility Study and Williston Reservoir Boat Ramp Feasibility Studies – Parsnip Arm

See also:

GMSWORKS-31 Kwadacha Boat Ramp

GMSWORKS-25 Williston Reservoir Bathymetry
GMSWORKS-26 Communications and Safety Improvements – Williston, Dinosaur and Peace
GMSWORKS-27 Finlay River Access Information Plan
GMSWORKS-28 District of Mackenzie Effluent Discharge Feasibility and Design Study  
GMSWORKS-31 Kwadacha Boat Ramp  
GMSWORKS-47 Boat Ramp Mackenzie Landing  
GMSWORKS-54 Dunlevy Boat Ramp Feasibility, Design and Costing  

 

GMSWORKS-57 Dunlevy Boat Launch Maintenance

 

 

 

GMSWORKS-58 Mackenzie Landing Boat Launch Maintenance