Skip to content

Peace River Management Plan (Schedule C)

The Peace Project Water Use Plan Order required a number of physical works and monitoring study projects to examine specific riparian, fisheries, wildlife habitat, recreation and industrial use of water issues in the Peace River area.

Projects Studies Terms of Reference

GMSMON-1 Peace River Creel Survey Monitoring

 

GMSMON-2 Fish Index Monitoring

GMSMON-5 Peace River Productivity

GMSMON-7 Peace River Side Channel Fisheries

GMSWORKS-1 Peace River Aerial Photos
GMSWORKS-3 Peace River Trial Side Channels
GMSWORKS-4 Peace River Hydraulic Habitat
GMSWORKS-5 Peace River Hydraulic Model
GMSWORKS-6 Peace River Mainstem Stage Discharge
GMSWORKS-7 Peace River Riparian Habitat Assessment
GMSWORKS-10 Industry and Taylor Water Quality Assessment

GMSWORKS-13 Peace River Recreation Access

See also:

GMSWORKS-29 Lynx Creek Boat Ramp  
GMSWORKS-30 Taylor (Peace Island Park) Boat Ramp