Peace River Management Plan (Schedule C)
The Peace Project Water Use Plan Order required a number of physical works and monitoring study projects to examine specific riparian, fisheries, wildlife habitat, recreation and industrial use of water issues in the Peace River area.
| Projects | Studies | Terms of Reference |
|---|---|---|
GMSMON-1 Peace River Creel Survey Monitoring |
|
|
GMSMON-2 Fish Index Monitoring |
|
|
GMSMON-5 Peace River Productivity |
|
|
GMSMON-7 Peace River Side Channel Fisheries |
|
|
| GMSWORKS-1 Peace River Aerial Photos |
|
|
| GMSWORKS-3 Peace River Trial Side Channels |
|
|
| GMSWORKS-4 Peace River Hydraulic Habitat |
|
|
| GMSWORKS-5 Peace River Hydraulic Model |
|
|
| GMSWORKS-6 Peace River Mainstem Stage Discharge |
|
|
| GMSWORKS-7 Peace River Riparian Habitat Assessment |
|
|
| GMSWORKS-10 Industry and Taylor Water Quality Assessment |
|
|
GMSWORKS-13 Peace River Recreation Access See also: |
|
|
| GMSWORKS-29 Lynx Creek Boat Ramp |
|
|
| GMSWORKS-30 Taylor (Peace Island Park) Boat Ramp |
|