Spill Protocol Management Plan and Archaeology Studies (Schedule D)
The Peace Project Water Use Plan Order required a number of monitoring study projects to examine specific riparian, fisheries, wildlife habitat, flood management and archaeological issues.
Projects | Studies | Terms of Reference |
---|---|---|
GMSMON-3 Peace River Fish Stranding |
|
|
GMSMON-4 W.A.C. Bennett Dam Entrainment |
|
|
GMSMON-6 Peace River Riparian Flooding |
|
|
GMSMON-8 Peace River Side Channel Response |
|
|
GMSMON-9 Peace River Spill Hydrology |
|
|
GMSMON-10 Peace River Spill Photos |
|
|
GMSMON-11 Peace River Spill TGP/Temperature Monitoring |
|
|
GMSMON-12 Peace River Wildlife Survey |
|
|
GMSMON-13 Williston Fish Index |
|
|
GMSMON-21A Archaeological Overview Assessment |
|
|
GMSMON-21B Erosion Monitoring of Archaeological Resources |
|
|
GMSWORKS-2 Peace River Baseline TGP/Temperature |
|
|