Skip to content

Spill Protocol Management Plan and Archaeology Studies (Schedule D)

The Peace Project Water Use Plan Order required a number of monitoring study projects to examine specific riparian, fisheries, wildlife habitat, flood management and archaeological issues.

Projects Studies Terms of Reference
GMSMON-3 Peace River Fish Stranding
GMSMON-4 W.A.C. Bennett Dam Entrainment
GMSMON-6 Peace River Riparian Flooding  
GMSMON-8 Peace River Side Channel Response
GMSMON-9 Peace River Spill Hydrology
GMSMON-10 Peace River Spill Photos
GMSMON-11 Peace River Spill TGP/Temperature Monitoring
GMSMON-12 Peace River Wildlife Survey
GMSMON-13 Williston Fish Index
GMSMON-21A Archaeological Overview Assessment
GMSMON-21B Erosion Monitoring of Archaeological Resources
GMSWORKS-2 Peace River Baseline TGP/Temperature