Regulatory Filings

BC Hydro has begun posting its regulatory filings with the BC Utilities Commission and other regulators as of January 1, 2019.

Proceedings

Subject Description
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application BC Hydro's written Reply Submission [PDF, 390 KB]
June 22, 2020
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application Chris O'Riley's correspondence to the BCUC [PDF, 136 KB]
June 15, 2020
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application BC Hydro's Reply Submission [PDF, 1.3 MB]
May 27, 2020
BC Hydro F2020 to F2021 Revenue Requirements Application - Final Argument BC Hydro's Final Argument [PDF, 2.3 MB]
April 1, 2020
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application - Undertakings BC Hydro's supplemental response to Oral Hearing Undertaking No. 62 [PDF, 126 KB]
March 26, 2020
BC Hydro F2020 to F2021 Revenue Requirements Application - Undertakings

BC Hydro's responses to remaining undertakings from the Oral Hearing of February 24 to March 4, 2020 together with supplemental responses to undertakings filed previously.
March 20, 2020

BC Hydro F2020 to F2021 Revenue Requirements Application BC Hydro's responses to undertakings resulting from the Oral Hearing [PDF, 823 KB]
March 13, 2020
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application - Oral Hearing Undertakings BC Hydro providing responses to undertakings 41, 45, 49 and 51 from the Oral Hearing [PDF, 373 KB]
March 6, 2020
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application BC Hydro filing interim rates [PDF, 3.9 MB]
February 14, 2020
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application BC Hydro providing remaining undertakings from the Oral Hearing of January 20 to January 24, 2020 [PDF, 388 KB]
February 14, 2020
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application BC Hydro's initial response to the Oral Hearing feedback and suggestions [PDF, 88 KB]
February 14, 2020
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application - Evidentiary Update Revisions to the Evidentiary Update  [PDF, 1.8 MB]
January 21, 2020
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application

A public version of Appendix B of BC Hydro's Rebuttal Evidence and revised responses to four previously submitted information requests.
January 17, 2020

BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application

BC Hydro responses to Round 2 Panel Information Requests [PDF, 3.5 MB]
January 17, 2020
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application Opening statement from Chris O'Riley to be delivered at the Oral Hearing on January 20, 2020 [PDF, 138 KB]
January 16, 2020
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application Updated information on Technology Captial Projects and the Metro North Transmission Project [PDF, 227 KB]
January 15, 2020
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application Rebuttal Evidence [PDF, 628 KB]
January 15, 2020
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application  Organizational chart and direct testimony for each witness [PDF, 456 KB]
January 9, 2020
BC Hydro Update on Peace to Kelly Lake Capacitors Project  Letter enclosing BC Hydro submission from December 4, 2019 regarding an Update on Peace to Kelly Lake Capacitors Project [PDF, 201 KB]
December 13, 2019
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application BC Hydro's remaining responses to Round 4 information requests [PDF, 1.0 MB]
November 19, 2019
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application BC Hydro's reply submission with regards to whether BC Hydro should be obligated to answer the 34 information requests listed in Attachment A of Exhibit B-21 [PDF, 120 KB]
November 19, 2019
Information Responses to BCUC Round 4 BC Hydro's response to BCUC Information Requests Round 4 - COE Evidentiary Update and 20-Year Load Forecast [PDF, 619 KB]
November 14, 2019
Information Responses to intervener Round 4 BC Hydro's response to Intervener Information Requests Round 4 - COE Evidentiary Update and 20-Year Load Forecast [PDF, 4.3 MB]
November 14, 2019
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application Request for a modification to the time allotted for filing responses to information requests [PDF, 152 KB]
November 8, 2019
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application BC Hydro letter to Interveners regarding the scope of the oral hearing [PDF, 186 KB]
November 4, 2019
Information Responses Public release of Information Responses previously considered Confidential [PDF, 563 KB]
October 18, 2019
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application Un-redacted version of the Evidentiary Update that was originally filed with the BCUC on August 22, 2019 [PDF, 4.1 MB]
October 18, 2019
Information Responses Round 3 BC Hydro's responses to Information Requests (Round 3) on the Evidentiary Update: BCUC [PDF, 3.6 MB]
October 10, 2019
Load Forecast Twenty-Year Load Forecast [PDF, 464 KB]
October 3, 2019
BC Hydro's comments on the review process for BC Hydro's Performance Based Regulation Report BC Hydro's comments on the review process for BC Hydro's Performance Based Regulation Report [PDF, 79 KB]
October 2, 2019
BC Hydro Responses to Intervener Round 2 BC Hydro Responses to Intervener Information Requests No. 2 [PDF, 23.1 MB]
September 3, 2019
BC Hydro Responses to BCUC Round 2 BC Hydro Responses to BCUC Information Requests No. 2 [PDF, 8.4 MB]
September 3, 2019
Evidentiary Update Evidentiary Update [PDF, 2.7 MB]
August 22, 2019
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirments Application Comments on proposed timetable [PDF, 16 KB]
August 15, 2019

Government of B.C.'s Public Accounts BC Hydro's letter informing the BCUC of the release date of the Government of B.C.'s Public Accounts. BC Hydro has also requested advancing the date of the second Procedural Conference [PDF, 151 KB]
July 26, 2019
Procedural Conference BC Hydro written submission prior to June 24 Procedural Conference [PDF, 308 KB]
June 19, 2019
BC Hydro Responses to BCUC BC Hydro Responses to BCUC Information Request No. 1 [PDF, 81.4 MB]
June 6, 2019
BC Hydro Responses to Interveners BC Hydro Responses to Interveners Information Request No. 1 [PDF, 55.5 MB]
June 6, 2019
Appendix J update BC Hydro’s letter to BCUC providing Updated Page 82 of Appendix J of the Application in response to BCUC IR 1.121.1.2 [PDF, 186 KB]
June 6, 2019
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application Supplementary Filing – Summary Audit Report and Management Audit Report [PDF, 780 KB]
March 26, 2019
BC Hydro F20-F21 Revenue Requirements Application - Compliance Filing Confirmation of compliance with Order No. G-45-19, Directives 10 (copies of Appendix B as published in specified news publications), 11 (confirmation that Appendix B published on social media) and 12 (confirmation that Application posted on BC Hydro website) [PDF, 2.0 MB]
March 19, 2019
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application - Workshop

BC Hydro's presentation from the workshop held on March 15, 2019 [PDF, 1.0 MB]
March 19, 2019
BC Hydro F20-F21 Revenue Requirements Application - Compliance Filing Compliance with Commission Order No. G-45-19, directive No. 5 - Rate Schedules for endorsement by the BCUC [PDF, 492 KB]
March 12, 2019
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application - Supplemental Information Supplemental Information No. 1 to the Application - Figure 9-4 and Appendix I, Attachment 1 [PDF, 367 KB]
March 7, 2019
 
BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application BC Hydro Fiscal 2020 to Fiscal 2021 Revenue Requirements Application (the Application) [PDF, 41.1 MB]
February 25, 2019


Subject Description
BC Hydro 2020 Transfer Pricing Agreement Application Compliance with BCUC Order No. G-156-20 Directive 2 - Provide Public Notice [PDF, 48 KB]
June 23, 2020
Exhibit A-2 BCUC Order No. G-156-20 Establishing a Regulatory Timetable [PDF, 192 KB]
June 17, 2020
BC Hydro 2020 Transfer Pricing Agreement Application Application [PDF, 3.2 MB]
May 29, 2020


Subject Description
Customer Crisis Fund Pilot Program - Year One Evaluation Report Reply Submission regarding Timing, Regulatory Process and Scope [PDF, 129 KB]
December 12, 2019
Customer Crisis Fund Pilot Program - Year One Evaluation Report Submission on Timing, Regulatory Process, and Scope [PDF, 134 KB]
November 28, 2019
Customer Crisis Fund Pilot Program - Year One Evaluation Report Notice of Application [PDF, 96 KB]
September 10, 2019
Customer Crisis Fund Pilot Program - Year One Evaluation Report Appendix E - Unsolicited Customer Feedback [PDF, 10.2 MB]
July 31, 2019
Customer Crisis Fund Pilot Program - Year One Evaluation Report Year One Evaluation Report [PDF, 3.9 MB]
July 31, 2019


Subject Description
BC Hydro Electricity Purchase Agreement (EPA) - Robson Valley Renewal (2020) BC Hydro PUBLIC Responses to BCUC IRs No.1 [PDF, 367 KB]
June 11, 2020
BC Hydro Electricity Purchase Agreement (EPA) - Robson Valley Renewal (2020) BC Hydro COMPLIANCE - with BCUC Order G-121-20, Directive 3 - Distribution of Order, Publication of Public Notice and Notice on BCH Website and Social Media [PDF, 3.4 MB]
June 10, 2020
BC Hydro Electricity Purchase Agreement (EPA) Renewal - Robson Valley Hydro

Appendix B to Order G-121-20 [PDF, 151 KB]
May 27, 2020

BC Hydro Electricity Purchase Agreement (EPA) Renewal - Robson Valley Hydro BCUC Order No. G-121-20 [PDF, 332 KB]
May 21, 2020
BC Hydro Electricity Purchase Agreement (EPA) Renewal - Robson Valley Hydro Robson Valley EPA Renewal [PDF, 1.2 MB]
April 30, 2020


Subject Description
BC Hydro Electricity Purchase Agreement (EPA) – Sechelt, Brown Lake, Walden North Renewals (2018) Walden North Forbearance Agreement (Compliance with Commission Order No. G-148-20, Directive 1) [PDF, 305 KB]
June 25, 2020
BC Hydro Electricity Purchase Agreement (EPA) – Sechelt, Brown Lake, Waldon North Renewals (2018) BC Hydro's Reply to Intervener Submissions on Whether the Forbearance Agreement Should be Submitted for Filing [PDF, 136 KB]
May 8, 2020
BC Hydro Electricity Purchase Agreement (EPA) – Sechelt, Brown Lake, Waldon North Renewals (2018) BC Hydro's Submission on Filing of Forbearance Agreement [PDF, 122 KB]
April 17, 2020
BC Hydro Electricity Purchase Agreement (EPA) – Sechelt, Brown Lake, Waldon North Renewals (2018) BC Hydro's Reply to Intervener Submissions on Recoverability of Costs from Ratepayers [PDF, 111 KB]
March 31, 2020
BC Hydro Electricity Purchase Agreement (EPA) – Sechelt, Brown Lake, Waldon North Renewals (2018) BC Hydro's Submission on Recoverability of Costs from Ratepayers [PDF, 115 KB]
March 17, 2020
BC Hydro Electricity Purchase Agreement (EPA) – Sechelt, Brown Lake, Waldon North Renewals (2018) BC Hydro's  Amendments to EPAs with each of Sechelt Creek, Brown Lake and Walden North [PDF, 1.4 MB]
February 21, 2020
BC Hydro Electricity Purchase Agreement (EPA) – Sechelt, Brown Lake, Waldon North Renewals (2018) BC Hydro's Extension Request to Restructure and Resubmit to the Commission EPA Renewals that Address the Commission's Concerns Related to the Terms of the EPAs [PDF, 140 KB]
December 16, 2019
BC Hydro Electricity Purchase Agreement (EPA) – Sechelt, Brown Lake, Waldon North Renewals (2018) Lawson Lundell Submission on Reply Final Argument on behalf of BC Hydro [PDF, 406 KB]
October 10, 2019
Lawson Lundell Submission on Supplemental Final Argument on behalf of BC Hydro Lawson Lundell Submission on Supplemental Final Argument on behalf of BC Hydro [PDF, 269 KB]
September 26, 2019
Sechelt, Brown Lake, Waldon North Renewals (2018) BC Hydro's Submission on CEBC's Letter of Comment [PDF, 141 KB]
July 17, 2019
Sechelt, Brown Lake, Waldon North Renewals (2018) Lawson Lundell Submission on Final Argument on behalf of BC Hydro [PDF, 440 KB]
July 5, 2019
Sechelt, Brown Lake, Waldon North Renewals (2018)

BC Hydro's Information Responses - Round 2 to BCUC and Interveners [PDF, 3.4 MB]
June 21, 2019

BC Hydro's Information Responses - Round 2 to BCUC and Interveners [PDF, 1.3 MB]
June 21, 2019

Sechelt, Brown Lake, Waldon North Renewals (2018) BC Hydro's letter dated May 30, 2019 filing Confidentiality of Information in the BCUC Staff's Economic Model [PDF, 190 KB]
May 30, 2019
Sechelt, Brown Lake, Waldon North Renewals (2018)  BC Hydro Reply Submission on Further Process [PDF, 77 KB]
April 17, 2019
BC Hydro Submission on Further Process 

Submission on Further Process [PDF, 145 KB] 
April 9, 2019
BC Hydro to BCUC – Information Responses – Round 1 BCUC 
Information Responses - Round 1 to BCUC and Intervener [PDF, 2.0 MB]
March 15, 2019
BC Hydro to BCUC – Information Responses – Round 1 Intervener Information Responses - Round 1 to BCUC and Intervener [PDF, 4.0 MB]
March 15, 2019


Process Description
BCUC Inquiry into the Regulation of Electric Vehicle Charging Service BCUC Inquiry into the Regulation of Electric Vehicle Charging Service – Phase 2 –Supplementary Submissions [PDF, 17 KB]
May 2, 2019
BCUC Inquiry – BC Hydro Final Argument on Revised Scope Final Argument on Revised Scope [PDF, 109 KB]
March 29, 2019
BC Hydro Submission on Phase 2 Evidence  BC Hydro submission on Phase 2 Evidence [PDF, 266 KB]
January 28, 2019


Process Description
Compliance with G-313-19 D2 Updated 2018 Capital Filing Guidelines Compliance with BCUC Order No. G-313-19 Directive 2 Providing an Update of the 2018 Capital Filing Guidelines [PDF, 250 KB]
January 17, 2020
Final Arguments Final Arguments [PDF, 1.7 MB]
August 1, 2019
Rebuttal Evidence BC Hydro Rebuttal Evidence [PDF, 2.0 MB]
February 15, 2019
Expert Evidence BC Hydro Expert Evidence of Dr. Paul R. Carpenter and Dr. Toby Brown of The Brattle Group [PDF, 637 KB]
February 15, 2019
BC Hydro Rebuttal Evidence Extension Request  BC Hydro rebuttal Evidence Extension Request [PDF, 98 KB]
January 22, 2019


Process Description
BC Hydro Fleet Electrification Rate Design (2019) BC Hydro's letter dated April 14, 2020 filing Tariff Sheets RS 1640-1643 and RS 1650-1653 [PDF, 704 KB]
April 14, 2020
BC Hydro Fleet Electrification Rate Design (2019) BC Hydro's Reply Argument [PDF, 620 KB]
January 24, 2020
BC Hydro Fleet Electrification Rate Design (2019) BC Hydro's Final Argument [PDF, 247 KB]
December 13, 2019
BC Hydro Fleet Electrification Rate Design (2019) BC Hydro Reply Submission on Further Process [PDF, 157 KB]
November 29, 2019
BC Hydro Fleet Electrification Rate Design (2019) Errata No.2 - Revised Appendix A (Order Order) and Appendix B (Rate Schedules) [PDF, 900 KB]
October 30, 2019
BC Hydro Fleet Electrification Rate Design (2019) BC Hydro's responses to BCUC IRs No.1 and IRs on BCUC Supplemental Information [PDF, 3.1 MB]
BC Hydro's responses to Intervener IRs No.1 and IRs on BCUC Supplemental Information [PDF, 2.9 MB]
October 30, 2019
BC Hydro Fleet Electrification Rate Design (2019) R/C ratio calculations included in Appendix E and F in a Excel as supplemental information and Errata No.1 to the Application [PDF, 427 KB]
September 27, 2019
BC Hydro Fleet Electrification Rate Design (2019) Letter dated Sept 9, 2019 - BC Hydro Submission in Compliance with Order G-198-19 [PDF, 291 KB]
September 9, 2019
BC Hydro Fleet Electrification Rate Design (2019) BC Hydro Fleet Electrification Rate Application [PDF, 3.5 MB]
August 7, 2019


Process Description
BC Hydro RS 1289 Net Metering Service Amendment - BC Hydro Reply Argument Reply Argument [PDF, 185 KB]
March 26, 2020
BC Hydro RS 1289 Net Metering Service Amendment - BC Hydro Final Argument Final Argument [PDF, 432 KB]
February 27, 2020
BC Hydro RS 1289 Net Metering Service Amendment - Response to Exhibit B-15 BC Hydro RS 1289 Net Metering Service Amendment - Response to Exhibit A-22 [PDF, 1.4 MB]
February 13, 2020
BC Hydro RS 1289 Net Metering Service Amendment - Response to Exhibit A-22 Response to Exhibit A-22 [PDF, 89 KB]
February 7, 2020
BC Hydro RS 1289 Net Metering Service Amendment - Response to Exhibit A-21 Response to Exhibit A-21  [PDF, 77 KB]
January 30, 2020
BC Hydro RS 1289 Net Metering Service Amendment - BC Hydro Rebuttal Evidence Rebuttal Evidence [PDF, 299 KB]
January 8, 2020
BC Hydro Net Metering Service under RS 1289 - BC Hydro Information Request No. 1 on Intervener Evidence Information Request No. 1 on Canadian Solar Industries Association Evidence [PDF, 87 KB]
December 9, 2019
BC Hydro Net Metering Service under RS 1289 - BC Hydro Information Request No. 1 on Intervener Evidence Information Request No. 1 on Peace Energy A Renewable Energy Cooperative Evidence [PDF, 88 KB]
December 9, 2019
BC Hydro Net Metering Service under RS 1289 - BC Hydro Information Request No. 1 on Intervener Evidence Information Request No. 1 on Riverside Energy Systems Evidence [PDF, 89 KB]
December 9, 2019
BC Hydro RS 1289 Net Metering Service Amendment (2019) BC Hydro responses to BCUC Information Requests. No. 2 [PDF, 486 KB]
BC Hydro responses to Intervener Information Requests. No. 2 [PDF, 3.0 MB]
October 24, 2019
BC Hydro Rate Schedule 1289 Net Metering Service Amendment - BC Hydro Submission on Further Process Submission on Further Process [PDF, 97 KB]
August 30, 2019
BC Hydro RS1289 Net Metering Service Amendment Responses to Interveners Information Request No. 1 Exhibit B-5 [PDF, 7.8 MB]
August 22, 2019
BC Hydro RS 1289 Net Metering Service Amendment - BC Hydro Extension Request to File Responses to Interveners Information Request No. 1 Extension Request to File Responses to Interveners Information Request No. 1 [PDF, 80 KB]
August 2, 2019
BC Hydro RS 1289 Net Metering Service Amendment - BC Hydro Compliance with G-103-19A Compliance with BCUC Order No. G-103-19A [PDF, 4.2 MB]
May 29, 2019
BC Hydro RS1289 Net Metering Service Amendment Responses to BCUC Information Request No. 1 Exhibit B-3 [PDF, 7.2 MB]
July 23
BC Hydro Application to Amend Rate Schedule 1289 for Net Metering Service  Application to Amend Rate Schedule 1289 for Net Metering Service [PDF, 3.0 MB] April 29, 2019


Process Description
BC Hydro Letter Agreement between BC Hydro and Powerex Corp. Forward Electricity Purchases (2018) Reporting Public Report No. 12 - May 1, 2020 to May 31, 2020 [PDF, 186 KB]
June 29, 2020
BC Hydro Letter Agreement between BC Hydro and Powerex Corp. Forward Electricity Purchases (2018) Reporting Public Report No. 11 - April 1, 2020 to April 30, 2020 [PDF, 137 KB]
May 29, 2020
BC Hydro Letter Agreement between BC Hydro and Powerex Corp. Forward Electricity Purchases (2018) Reporting Public Report No. 10 - March 1, 2020 to March 31, 2020 [PDF, 127 KB]
April 22, 2020
BC Hydro Letter Agreement between BC Hydro and Powerex Corp. Forward Electricity Purchases (2018) Reporting Report No. 9 - February 1, 2020 to February 29, 2020 [PDF, 126 KB]
March 24, 2020
BC Hydro Letter Agreement between BC Hydro and Powerex Corp. Forward Electricity Purchases (2018) Reporting Report No. 8 - January 1, 2020 to January 31, 2020 [PDF, 130 KB]
February 26, 2020
BC Hydro Letter Agreement between BC Hydro and Powerex Corp. Forward Electricity Purchases (2018) Reporting Report No. 7 - December 1, 2019 to December 31, 2019  [PDF, 116 KB]
January 24, 2020
BC Hydro Letter Agreement between BC Hydro and Powerex 2019 - BC Hydro Reply Argument Reply Agument [PDF, 419 KB]
January 8, 2020
BC Hydro Letter Agreement BC Hydro Powerex 2019 BC Hydro Transactions Quarterly Report No. 1 Ending September 30, 2019 [PDF, 123 KB]
January 3, 2020
BC Hydro Letter Agreement between BC Hydro and Powerex Corp. Forward Electricity Purchases (2018) Reporting Report No. 6 - November 1, 2019 to November 30, 2019 [PDF, 119 KB]
December 16, 2019
BC Hydro Application for 2019 Letter Agreement with Powerex Corp. Responses to BCUC Panel Information Request No. 2, and Final Argument [PDF, 571 KB]
December 5, 2019
BC Hydro Application for 2019 Letter Agreement with Powerex Corp. - Compliance with BCUC Order No. E-15-19 Directive 4 Report No. 5 - October 1, 2019 to October 31, 2019 [PDF, 145 KB]
December 2, 2019
BC Hydro Letter Agreement between BC Hydro and Powerex Corp. Forward Electricity Purchases (2018) Reporting Report No. 4 - September 1, 2019 to September 30, 2019 [PDF,  858 KB]
October 28, 2019
BC Hydro Application for 2019 Letter Agreement with Powerex Corp. BC Hydro responses to BCUC Information Requests. No. 1 [PDF, 1.2 MB]
BC Hydro responses to  Intervener Information Requests. No. 1 [PDF, 2.8 MB]
October 24, 2019
BC Hydro Application for 2019 Letter Agreement with Powerex Corp. Exhibit B-3 [PDF, 834 KB]
October 8, 2019
Letter Agreement with Powerex Corp. Forward Electricity Purchases (2018) Reporting Report No.3 – August 1, 2019 to August 31, 2019 [PDF, 898 KB]
September 30, 2019
BC Hydro Application for 2019 Letter Agreement with Powerex Corp. Exhibit B-2 [PDF, 892 KB]
August 29, 2019
Letter Agreement with Powerex Corp. Forward Electricity Purchases Reporting Report No. 2 – July 1, 2019 to July 31, 2019 [PDF, 915 KB]
August 28, 2019
BC Hydro Application for 2019 Letter Agreement with Powerex Corp. 2019 Letter Agreement [PDF, 1.0 MB]
August 2, 2019
BC Hydro Letter Agreement between BC Hydro and Powerex Corp. Forward Electricity Purchases (2018) Reporting Report No. 1 - June 1, 2019 to June 30, 2019 [PDF, 555 KB]
August 1, 2019 
BC Hydro Letter Agreement with Powerex Corp. Forward Electricity Purchases Compliance with Directive 4 of Order E-15-19 - Monthly reports to monitor water levels and inflows at each of the Kinbasket and Williston reservoirs [PDF, 551 KB]
August 1, 2019
BC Hydro Letter Agreement with Powerex Corp. Compliance with Directive 3 BCUC Order E-15-19 [PDF, 19 KB]
August 1, 2019
BC Hydro Letter Agreement with Powerex Corp.

Forward Electricity Purchases, as amended [PDF, 9.0 MB]
May 23, 2019

Confirmation - February 28, 2019 [PDF, 226 KB]



Process Description
BC Hydro TS 95 Tariff Agreement DND Esquimalt BCUC Staff Information Responses No. 1  [PDF, 1.0 MB]
November 4, 2019
BC Hydro TS 95 Tariff Agreement DND Esquimalt Exhibit B-1 [PDF, 2.6 MB]
September 30, 2019


Process Description
BCUC Review of BC Hydro's Performance Based Regulation (PBR) Report BC Hydro's submission of clarifying questions and high-level topics for discussion at the September 8, 2020 workshop
[PDF, 147 KB]
June 30, 2020
BCUC Review of BC Hydro's Performance Based Regulation (PBR) Report BC Hydro's letter providing its availability for a re-scheduled workshop in September [PDF, 65 KB]
March 19, 2020
BCUC Review of BC Hydro's Performance Based Regulation (PBR) Report  BC Hydro's letter filed with the Commission today requesting that the date for submitting clarifying questions and high-level topics be extended to align with the new workshop date [PDF, 96 KB]
March 16, 2020
Review of BC Hydro’s Performance Based Regulation Report Exhibit B-2 [PDF, 1.2 MB]
November 18, 2019
Review of BC Hydro’s Performance Based Regulation Report Exhibit B-1 [PDF, 836 KB]
October 18, 2019


Process Description
BC Hydro Transmission Service Market Reference-Priced Rates Final Argument [PDF, 393 KB]
June 29, 2020
BC Hydro Transmission Service Market Reference-Priced Rates Exhibit B-12 - BC Hydro Responses to Interveners Information Request No. 3 [PDF, 1.6 MB]
June 19, 2020
BC Hydro Transmission Service Market Reference-Priced Rates Exhibit B-11 - BC Hydro Public Responses to BCUC Information Request No. 3 [PDF, 528 KB]
June 19,  2020
BC Hydro Transmission Service Market Reference-Priced Rates Extension Request to File Responses to BCUC and Interveners Information Request No. 3 [PDF, 114 KB]
June 2, 2020
BC Hydro Transmission Service Market Reference-Priced Rates - Exhibits Revision Request  Exhibits Revision Request [PDF, 6.4 MB]
May 19, 2020
BC Hydro Transmission Service Market Reference-Priced Rates Application A-3 – BCUC Order No. G-327-19 with Regulatory Timetable [PDF, 172 KB]
December 12, 2019
BC Hydro Transmission Service Market Reference-Priced Rates Application B-2 – Updated Tariff Sheets [PDF, 2.3 MB]
December 5 
BC Hydro Transmission Service Market Reference-Priced Rates Application B-1-2 – Errata No. 2 [PDF, 1.5 MB]
December 5 
BC Hydro Transmission Service Market Reference-Priced Rates Application B-1-1 – Errata No. 1 [PDF, 657 KB]
November 6, 2019
BC Hydro Transmission Service Market Reference-Priced Rates Application Exhibit B-1, Application [PDF, 12.2 MB]
October 31, 2019


Completed Proceedings

Subject Description
BC Hydro Supply Chain Applications Phase Two (2018) - Semi-Annual Report BC Hydro Semi-Annual Progress Report No. 2 [PDF, 2.5 MB]
April 30, 2020
BC Hydro's Reply Argument  BC Hydro Written Reply Argument [PDF, 1.1. MB]
February 21, 2019
BC Hydro's Final Argument FASKEN's letter dated January 22, 2019 filing BC Hydro's written final argument [PDF, 709 KB]
January 22, 2019
Errata BC Hydro Errata No.1  to the Application [PDF, 1.6 MB]
January 15, 2019
B3 - Responses to Commision IRs  BC Hydro responses to BCUC Information Request Round No.1 [PDF, 2.7 MB]
January 15, 2019
B4 - Responses to Interveners IRs  BC Hydro responses to Interveners Information Request Round No.1 [PDF, 5.6 MB]
January 15, 2019


Subject Description
BC Hydro MRS Reliability Coordinator Registration - BC Hydro Reply Argument BC Hydro Reply Submissions to Intervener Arguments [PDF, 1.0 MB]
August 13, 2019
Confirmation of Completion of Bucket 2 Confirmation of Completion of Bucket 2 Items to BCUC and Registered Interveners [PDF, 126 KB]
July 30, 2019
Assessment report No. 12 Compliance with BCUC Order No. R-16-19 Directive 2 [PDF, 59 KB]
July 29, 2019
PL-001-4 Semi-Annual Progress Report No. 2 Semi-Annual Progress Report No. 2 - January 1, 2019 to June 30, 2019 [PDF, 196 KB]
July 25, 2019
Report No. 12 Addressing Reliability Standards for Adoption in British Columbia Reply to Public Comments [PDF, 97 KB]
July 18, 2019
BC Hydro Responses to BCUC Panel Information Request 2 Responses to BCUC Panel Information Request No. 2 (Exhibit B-12) [PDF, 178 KB]
June 25, 2019
Assessment Report No. 12 BC Hydro Compliance with BCUC Order No. R-14-19 Directive 2 – Notification to B.C. Registered Entities [PDF, 132 KB]
June 13, 2019
BC Hydro responses to BCUC Information Request No. 2 Responses to BCUC Information Request No. 2 [PDF, 904 KB]
May 29, 2019
BC Hydro Planning Authority/Planning Coordinator Functional Role Letter dated regarding Planning Authority/Planning Coordinator Functional Role [PDF, 96 KB]
May 1, 2019
BC Hydro Four Key Documents Filing and Reply Submission Four Key Documents Filing and Reply Submission [PDF, 1.0 MB]
April 30, 2019
Distribution of Final Documents to Stakeholders BC Hydro providing Final Documents to Stakeholder [PDF, 659 KB]
April 10, 2019
Draft Documents for Stakeholder Process - Distributed to Interveners and MRS Program Registered Entities BC Hydro Draft Documents for Stakeholder Process - Distributed to Interveners and MRS Program Registered Entitie [PDF, 1.0 MB]
March 1, 2019
Draft Documents for Stakeholder Process  - Confirmation of Distribution of Draft Documents for Stakeholder Process  BC Hydro to BCUC - Confirmation of Distribution of Draft Documents for Stakeholder Process [PDF, 78 KB]
March 1, 2019
TPL-001-4 Assessment Report - Compliance with R-27-18A D4 - Semi-Annual Report 1  TSemi-Annual Progress Report No. 1 - July 1, 2018 to December 31, 2018 [PDF, 204 KB] January 30, 2019
BC Hydro Responses to BCUC Panel Information Request 1 BC Hydro Responses to BCUC Panel Information Request No. 1 [PDF, 442 KB]
January 30, 2019 
BC Hydro Responses to BCUC and Intervener Information Request 1 BC Hydro Responses to BCUC and Intervener Information Request No. 1 [PDF, 1.5 MB]
January 23, 2019
BC Hydro Extension Request BC Hydro Extension Request [PDF, 19 KB]
January 10, 2019
Procedural Conference Rescheduling Request BC Hydro Procedural Conference Rescheduling Request [PDF, 80 KB]
January 4, 2019


Filings

Process Description
BC Hydro Inquiry of Expenditures Related to the Adoption of the SAP Platform SAP Inquiry Report - BC Hydro Response to SAP Inquiry Report on Recommendations BC Hydro Response to SAP Inquiry Report on Recommendations [PDF, 344 KB]
July 2, 2020
City of Coquitlam Reconsideration and Variance of Order G-80-19 (2019) BC Hydro Submission on Further Process [PDF, 74 KB]
June 30, 2020
BC Hydro COVID-19 Customer Relief Program Compliance Report No. 3 for May 2020 [PDF, 147 KB]
June 30, 2020
BC Hydro COVID-19 Residential Rate Relief for Renters BC Hydro's letter to inform the Commission that we will not be proceeding with the Program due to unworkable administrative challenges [PDF, 80 KB]
June 29, 2020
Greenhouse Gas Reduction (Clean Energy) Regulation Reporting - BC Hydro Fiscal 2020 Annual Report  Greenhouse Gas Reduction Regulation Reporting - BC Hydro Fiscal 2020 Annual Report [PDF, 828 KB]
June 29, 2020
BC Hydro COVID-19 Site C Bi-Weekly Report COVID-19 Site C Bi-weekly Report No. 6 [PDF, 110 KB]
June 29, 2020
BC Hydro/FortisBC Evacuation Relief Tariff Amendment BC Hydro's Reply Submission [PDF, 186 KB]
June 26, 2020
BC Hydro Canadian Forest Products Ltd – Extension of Tariff Supplement 53 BC Hydro's letter supporting Canfor's request to extend the termination date of Tariff Supplement No. 53 [PDF,118 KB]
June 25, 2020
COVID-19 Customer Relief Program Extension Application - amendments to Tariff Supplements 97, 98 and 99 [PDF, 1.1 MB]
June 22, 2020
BC Hydro Site C Clean Energy Project - BC Hydro response to BCUC request for Anticipated Timing for Filing Quarterly Progress Report No. 18 Response to BCUC Request for Anticipated Timing for Filing for Site C Quarterly Progress Report No. 18 [PDF, 22 KB]
June 17, 2020
BC Hydro to BCUC re: NERC COVID 19 Compliance Response BC Hydro Letter to BCUC dated June 17, 2020 regarding North American Electric Reliability Corporation COVID 19 Compliance Response [PDF, 2.3 MB]
June 17, 2020
BC Hydro COVID-19 Site C - Bi-Weekly Report COVID-19 Site C Bi-Weekly report No. 5 [PDF, 111 KB]
June 16, 2020
BC Hydro CER Electricity Export Permit - May 2020 Report May 2020 CER Export Report [PDF, 72 KB]
June 12, 2020
Catalyst Paper - Request to Reduce RS 1893 (2020) BC Hydro's Letter of Comments [PDF, 73 KB]
June 9, 2020
BC Hydro Mandatory Reliability Standards Assessment Report No. 13 Compliance with R-10-20 Directive 2 Compliance with BCUC Order No. R-10-20 Directive 2 [PDF, 318 KB]
June 8, 2020
BC Hydro COVID-19 Site C Bi-Weekly Report COVID-19 Site C Bi-Weekly Report No.  4 [PDF, 110 KB]
June 3, 2020
BC Hydro COVID-19 Residential Rate Relief for Renters Application BC Hydro's Final Argument [PDF, 61 KB]
June 1, 2020
BC Hydro COVID-19 Customer Relief Program Application Report No. 2 - April 2020 [PDF, 136 KB]
June 1, 2020
BC Hydro’s Emergency Response and Wildfires Mitigation Plans COVID-19: BC Hydro’s Emergency Response and Wildfires Mitigation Plans [PDF, 5.6 MB]
May 29, 2020
City of Coquitlam Reconsideration and Variance of Order G-80-19 (2019) BC Hydro's Additional Submission on Further Process  [PDF, 73 KB]
May 27, 2020
BC Hydro COVID-19 Residential Rate Relief for Renters BC Hydro's responses to Commission Information Request No. 1 [PDF, 425 KB]
May 26, 2020
BC Hydro / FortisBC Evacuation Relief Tariff Amendment Applications BC Hydro's final argument [PDF 169 KB]
May 26, 2020
Boralex Rates and Terms and Conditions for Service to BC Hydro BC Hydro's submission on further regulatory process [PDF, 74 KB]
May 26, 2020
BC Hydro COVID-19 Site C Bi-Weekly Report COVID-19 Site C Bi-Weekly Report No. 3 [PDF, 110 KB]
May 19, 2020
BC Hydro John Hart Generating Station Replacement Project BC Hydro's Semi-Annual Progress Report No. 13 [PDF, 1.4 MB]
May 15, 2020
BC Hydro COVID-19 Residential Rate Relief for Renters Application BC Hydro COVID-19 Residential Rate Relief for Renters Application [PDF, 1.9 MB]
May 14, 2020
BC Hydro Fully Allocated Cost of Service (FACOS) Study - Annual Report FACOS Study Fiscal 2019 Annual Report [PDF, 449 KB]
May 13, 2020
BC Hydro Ruskin Dam and Powerhouse Upgrade CPCN - Semi-Annual Report Ruskin Dam and Powerhouse Upgrade Project - Final Completion Report [PDF, 1.4 MB]
May 13, 2020
BC Hydro F2020 Network Economy Annual Report to Transmission Customers F2020 Network Economy Annual Report to Transmission Customers - April 2020  [PDF, 970 KB]
May 13, 2020
BC Hydro CER Electricity Export Permit - April 2020 Report REVISED April 2020 Export Permit Report [PDF, 107 KB]
May 13, 2020 (revised June 5, 2020)
BC Hydro COVID-19 Site C Bi-Weekly Report COVID-19 Site C Bi-Weekly Report No. 2 [PDF, 128 KB]
May 6, 2020
BC Hydro/FortisBC Evacuation Relief Tariff Amendment BC Hydro's responses to Round 2 information requests [PDF, 774 KB]
May 5, 2020
BC Hydro F2005 to F2006 RRA DEC Directive 26 - BCH F2020 Annual Reporting of Reliability Indices F2020 Annual Reporting of Reliability Indices [PDF, 1.0 MB]
May 4, 2030
BC Hydro Electricity Purchase Agreement (EPA) Extension - Hluey Lake Hydroelectric Facility BC Hydro's application for a six-month extension for the Hluey Lake Hydroelectric Facility EPA [PDF, 427 KB]
April 30, 2020
City of Coquitlam Reconsideration and Variance of Order G-80-19 (2019) BC Hydro's Submission on Procedural Issue [PDF, 117 KB]
April 30, 2020
Customer Complaints & Consecutive Estimates Combined Report BC Hydro Fiscal 2020 Fourth Quarter Summary Report of Customer Complaints and Consecutive Estimates [PDF, 358 KB]
April 28, 2020
BC Hydro COVID-19 Customer Relief Program (2020) - Monthly Report Compliance Report No. 1 for March 2020 - CCF Regulatory Account Activities [PDF, 134 KB]
April 27, 2020
BC Hydro COVID-19 Customer Relief Program (2020) BC Hydro's compliance with Commission Order No. G-79-20, Directive No. 6 providing Electric Tariff sheets [PDF, 1.5 MB]
April 24, 2020
BC Hydro RS 1205 RS 1206 and RS 1207 Amendment (2019) BC Hydro Amended RS 1205, 1206 and 1207 [PDF, 2.6 MB]
April 23, 2020
BC Hydro Biomass Energy Program Energy Supply Contracts Two energy supply contracts for Skookumchuck Pulp Inc.
[PDF, 261 KB]
April 23, 2020
BC Hydro COVID-19 Site C Bi-Weekly Report COVID-19 Site C Bi-Weekly Report No. 1 [PDF, 135 KB]
April 21, 2020
Transmission Service Market Reference-Priced Rates - BC Hydro Reply Argument Reply Argument [PDF, 321 KB]
April 15, 2020
BC Hydro CER Electricity Export Permit - March 2020 Report March 2020 Export Permit Report [PDF, 87 KB]
April 14, 2020
BC Hydro COVID-19 Customer Relief Program Tariff Supplements 90, 97, 98 and 99 for stamping [PDF, 389 KB]
April 6, 2020
BC Hydro COVID-19 Customer Relief Program Application The COVID-19 Customer Relief Program Application [PDF, 2.6 MB]
April 3, 2020
BC Hydro Transmission Service Market Reference-Priced Rate Written Final Argument [PDF, 373 KB]
April 1, 2020
BC Hydro RS 1893 Incremental Energy Rate Pilot Baselines Adjustment  Exhibit B-2-1 - BC Hydro Responses to BCUC Staff Public Information Request No. 1 [PDF, 316 KB]
March 31, 2020
BCUC Indigenous Utilities Regulation Inquiry (2019) BC Hydro's Written Reply to Comments from Other Participants on Draft Report [PDF, 24 KB]
March 31, 2020
BCUC Report to the Legislature - Annual 2019/2020 BCUC Report to Legislature [PDF, 110 KB]
March 30, 2020
Transmission Service Market Reference-Priced Rates - Exhibits B-6, B-7 and B-8 Exhibit B-6 – BC Hydro Responses to BCUC Pre-filed Questions for Streamlined Review Process [PDF, 255 KB]
Exhibit B-7 – BC Hydro Responses to BCUC Staff Information Request No. 2 [PDF, 189 KB]
Exhibit B-8 – BC Hydro Responses to Interveners Information Request No. 2 [PDF, 1.8 MB]
March 25, 2020
Boralex LP Application for Rates and Terms and Conditions for Service to BC Hydro BC Hydro's Information Request No. 2 to Boralex LP [PDF, 253 KB]
March 23, 2020
BC Hydro RS 1205 RS 1206 and RS 1207 Amendment (2019) BC Hydro Reply Comments [PDF, 82 KB]
March 19, 2020
BC Hydro Residential Inclining block Rate Pricing Extension Application - BC Hydro Reply SBMS Reply Submission [PDF, 126 KB]
March 19, 2020
Energy Supply Contract Filing Requirements BC Hydro Electricity Purchase Agreement (EPA) – Sechelt, Brown Lake, Waldon North Renewals (2018) [PDF, 131 KB]
March 18, 2020
BC Hydro CER Electricity Export Permit - February 2020 Report February 2020 Export Permit Report [PDF, 122 KB]
March 12, 2020
BC Hydro RS 1205 RS 1206 and RS 1207 Amendment (2019) BC Hydro's Information Responses to BCUC Information Request No.1 [PDF, 541 KB]
March 10, 2020
BCUC Indigenous Utilities Regulation Inquiry (2019) BC Hydro Submitting Comments on Draft Report [PDF, 215 KB]
March 6, 2020
BC Hydro Rate Schedule 1893 Transmission Service Incremental Energy Rate Alternative Baselines Application (2020) [PDF, 677 KB]
March 4, 2020
BC Hydro Fully Allocated Cost of Service (FACOS) BC Hydro Fully Allocated Cost of Service (FACOS) [PDF, 348 KB]
March 3, 2020
BCUC Indigenous Utilities Regulation Inquiry (2019) BC Hydro Responses to BCUC Panel IRs No.1 [PDF, 135 KB]
February 28, 2020
BC Hydro Mandatory Reliability Standards Response to BCUC Request dated January 10, 2020 for International Power Lines 5L51 and 5L52 – National Energy Board Order for Electricity Reliability Standards – Compliance Verification Activity Report: CV1617-026 [PDF, 611 KB]
February 20, 2020
BC Hydro Transmission Service Market Reference Priced Rates Application (2019) Responses to BCUC Information Request No. 1 and Public Responses to Intervener Information Request No. 1 [PDF, 2.9 MB]
February 20, 2020
BC Hydro Biomass Energy Program Energy Supply Contracts Energy Supply Contracts for Canfor Prince George Pulp and Skookumchuck [PDF, 267 KB]
February 20, 2020
BC Hydro/FortisBC Evacuation Relief Tariff Amendment BC Hydro responses to Round 1 information requests and revised version of Appendix C of the Application (section 5 Meter Reading and Billing) [PDF, 2.6 MB]
February 19, 2020
BC Hydro RS 1205 RS 1206 and RS 1207 Amendment (2019) BC Hydro Filing of Notice Provided to General Service E-Plus Customers with the BCUC [PDF, 301 KB]
February 18, 2020
BC Hydro Residential Inclining Block F21 and F22 Rate Pricing Principles Residential Inclining Block (RIB) Fiscal 2021 and Fiscal 2022 Rate Pricing Principles Extension Application [PDF, 664 KB]
February 13, 2020
BC Hydro CER Electricity Export Permit - January 2020 Report January 2020 Export Permit Report [PDF, 81 KB]
February 11, 2020
CB Powerline Exemption Application (2019) BC Hydro's Final Argument [PDF, 143 KB]
February 4, 2020
Q3 CC & CER Report BC Hydro second response summarising dam safety management [PDF, 138 KB]
February 3, 2020
Boralex Rates and Terms and Conditions for Service to BC Hydro BC Hydro Information Request No. 1 to Boralex [PDF, 299 KB]
February 3, 2020
BC Hydro Meter/Meter Base Fire or High Temperature Safety Incident Semi-Annual Report Semi-annual Compliance Report No. 7 - July 1, 2019 to December 31, 2019 [PDF, 133 KB]
January 30, 2020
Compliance filing - BC Hydro Mandatory Reliability Standards TPL-001-4 Semi-Annual Progress Report No. 3 Semi-Annual Progress Report No. 3 - July 1, 2019 to December 31, 2019 [PDF, 208 KB]
January 30, 2020
BC Hydro compliance with MO-036-2012 for Electricity Reliability Standards Compliance with NEB Order MO-036-2012, Order for Electricity Reliability Standards [PDF, 499 KB]
January 29, 2020
BC Hydro/FortisBC Evacuation Relief Tariff Amendment BC Hydro Letter Agreement between BC Hydro and Powerex Corp. Forward Electricity Purchases (2018) Reporting [PDF, 378 KB]
January 24, 2019
Customer Complaints & Consecutive Estimates Combined Report BC Hydro Fiscal 2020 Third Quarter Summary Report of Customer Complaints and Consecutive Estimates [PDF, 319 KB]
January 22, 2020
BC Hydro Site C Clean Energy Project - Quarterly Progress Report 17 Site C Clean Energy Project - Quarterly Progress Report No. 17 - F2020 Q2 - July 2019 to September 2019 [PDF, 2.2 MB]
January 15, 2020
BC Hydro RS 1205 RS 1206 and RS 1207 Amendment (2019) BC Hydro Supplementary Evidence Submission [PDF, 136 KB]
January 14, 2020
BC Hydro Demand-Side Management Milestone Evaluation Summary Report F2019 BC Hydro’s letter dated January 14, 2020 enclosing its Demand-Side Management Milestone Evaluation Summary Report F2019 - December 2019 [PDF, 690 KB]
January 14, 2020
BC Hydro CER Electricity Export Permit - December 2019 Report December 2019 Export Permit Report [PDF, 216 KB]
January 10, 2020
BC Hydro Written Submission on Further Process BC Hydro Written Submission on Further Process [PDF, 108 KB]
January 9, 2020
CB Powerline Exemption Application (2019) Exhibit C1-1 - Letter dated August 9, 2019 [PDF, 1.2 MB]
Exhibit C1-2 BC Hydro Extension Request for Filing Information Responses No. 1 to BCUC, December 4, 2019 [PDF, 1.2 MB]
Exhibit C1-3 Letter Dated December 13, 2019 - BC Hydro's Information Responses to BCUC No. 1 [PDF, 20.8 MB]
December 13, 2019
BC Hydro CER Electricity Export Permit - November 2019 Report November 2019 Export Permit Report [PDF, 88 KB]
December 10, 2019
Energy Supply Contract Filing Requirements - F2020 Q1 & Q 2 BC Hydro Energy Supply Contract Filing Requirements - F2020 Q1 & Q 2 [PDF, 148 KB]
December 10, 2019
CB Powerline Exemption Application (2019) BC Hydro Extension Request for Filing Information Responses No. 1 to BCUC [PDF, 18 KB]
December 4, 2019
Boralex Rates and Terms and Conditions for Service to BC Hydro BC Hydro submission regarding the regulatory process [PDF, 142 KB] 
November 29, 2019
BC Hydro Biomass Energy Program Energy Supply Contracts Energy supply contracts in respect of Tolko Armstrong, NW Energy (Williams Lake) and Skookmuchuck [PDF, 329 KB]
November 28, 2019
BC Hydro John Hart Generating Station Replacement Project Semi-Annual Progress Report No. 12 [PDF, 1.5 MB]
November 15, 2019
BC Hydro Ruskin Dam and Powerhouse Upgrade CPCN - Semi-Annual Report BC Hydro Ruskin Dam and Powerhouse Upgrade Project Semi-Annual Progress Report No. 15 - April 2019 to September 2019 [PDF, 1.3 MB]
November 14, 2019
BC Hydro RS 1205 1206 and 1207 Amendment (2019) BC Hydro RS 1205, 1206 and 1207 Amendment Application [PDF, 899 KB]
November 14, 2019
Boralex Rates and Terms and Conditions for Service to BC Hydro Boralex letter dated November 13, 2019 confirming compliance with BCUC Order G-265-19, Directives 4 and 6 [PDF, 1.6 MB]
November 14, 2019
BC Hydro CER Electricity Export Permit - October 2019 Report October 2019 Export Permit Report [PDF, 164 KB]
November 8, 2019
City of Coquitlam Reconsideration and Variance of Order G-80-19 (2019) BC Hydro Final Argument [PDF, 2.2 MB]
November 6, 2019
BC Hydro Transmission Service Freshet Energy Rate Schedule 1892 Extension Reporting BC Hydro's Transmission Service Freshet Rate Pilot Evaluation Report for Year 4 [PDF, 902 KB]
October 31, 2019
Supply Chain Applications Project Semi-Annual Progress Report No. 1 (October 2018 to September 2019) [PDF, 1.4 MB]
October 30, 2019
BC Hydro / FortisBC Evacuation Relief Tariff Amendment Applications Proposed amended regulatory timetable [PDF, 89 KB]
October 23, 2019
BC Hydro CER Electricity Export Permit - September 2019 Report September 2019 Export Permit Report [PDF, 95 KB]
October 4, 2019
BC Hydro Site C Clean Energy Project - BC Hydro Public Quarterly Progress Report 16 Site C Clean Energy Project - Quarterly Progress Report No. 16 - F2020 Q1 - April 2019 to June 2019 [PDF, 1.6 MB]
October 4, 2019
BCUC Indigenous Utilities Regulation Inquiry (2019) BC Hydro Final Submission [PDF, 857 KB]
October 4, 2019
BC Hydro Mandatory Reliability Standards Compliance with MO 039 Subsection 3(2) of the MRS Regulation - BC Hydro Extension Request Extension Request for filing the Compliance with MO 039 Section 3(2) [PDF, 85 KB]
October 4, 2019
BC Hydro Evacuee Assistance Application and Evacuation Relief Tariff Amendment BC Hydro's response to BCUC staff question [PDF, 182 KB]
October 2, 2019
Letter Agreement with Powerex Corp. Forward Electricity Purchases (2018) Reporting Report No.3 – August 1, 2019 to August 31, 2019 [PDF, 898 KB]
September 30, 2019
BC Hydro Application to Expand Rate Schedule 1880 Response to BCUC Staff questions submitted on September 23, 2019
[PDF, 242 KB]
September 27, 2019
BC Hydro OATT Dynamic Scheduling Amendments - Compliance with G-20-18 D3b and 3c Compliance with BCUC Order No. G-20-18 Directives 3b and 3c [PDF, 101 KB]
September 23, 2019
City of Coquitlam Reconsideration and Variance of Order G-80-19 BC Hydro submission on further process [PDF, 155 KB]
September 19, 2019
BC Hydro Rate Schedule 1880 Amendment Application to amend Rate Schedule 1880 to expand availability to customers taking service under RS 1828 [PDF, 809 KB]
September 13, 2019
BC Hydro Customer Crisis Fund Rate Rider Amendment Compliance with BCUC Order No. G-194-19 [PDF, 19 KB]
September 11, 2019
BC Hydro NEB Electricity Export Permit - August 2019 Report August 2019 Export Permit Report [PDF, 89 KB]
September 10, 2019
BC Hydro Mandatory Reliability Standards Assessment Report - Annual Report BC Hydro's responses to the Commission's Information Request No. 1 [PDF, 1.0 MB]
August 28, 2019
Letter Agreement with Powerex Corp. Forward Electricity Purchases Reporting Report No. 2 – July 1, 2019 to July 31, 2019 [PDF, 915 KB]
August 28, 2019
Customer Crisis Fund Rate Rider Amendment - Compliance with G-194-19 - Filing RS 1903 for Stamping Letter filing RS 1903 for Stamping in Compliance with BCUC Order No. G-194-19 [PDF, 298 KB]
August 23, 2019
BC Hydro Transmission Service Freshet Energy RS 1892 - Extension Request Compliance with G-106-19 D4 Extension Request to Filing Date in BCUC Order No. G-106-19 Directive 4 [PDF, 110 KB] 
August 23, 2019
Boralex Ocean Falls Ltd. Partnership 2019 Rate Application BC Hydro's comments on Boralex' request for an extension to file its rate application [PDF, 98 KB]
August 22, 2019
BC Hydro NEB Electricity Export Permit - July 2019 Report July 2019 Export Permit Report [PDF, 91 KB]
August 13, 2019
BC Hydro F19 Annual Report on Demand-Side Management Activities F2019 Annual Report on Demand-Side Management Activities [PDF, 446 KB]
August 9, 2019 
BC Hydro Evacuee Assistance and Evacuation Relief Tariff Amendment Applications BC Hydro's Application [PDF, 2.0 MB]
August 8, 2019
BC Hydro Letter Agreement with Powerex Corp. Forward Electricity Purchases Compliance with Directive 4 of Order E-15-19 - Monthly reports to monitor water levels and inflows at each of the Kinbasket and Williston reservoirs [PDF, 551 KB]
August 1, 2019
BC Hydro Letter Agreement with Powerex Corp. Compliance with Directive 3 BCUC Order E-15-19 [PDF, 19 KB]
August 1, 2019
BC Hydro Application to Amend Customer Crisis Fund Rate Rider Application [PDF, 987 KB]
July 31, 2019
BC Hydro Fiscal 2019 Annual Report to the Commission Fiscal 2019 Report [PDF, 1.2 MB]
July 31, 2019
BC Hydro Meter / Meter Base Fire or High Temperature Safety Incident Semi-Annual Report Semi-annual Compliance Report No. 6 - January 1, 2019 to June 30, 2019 [PDF, 71 KB]
July 30, 2019
Customer Complaints & Consecutive Estimates Combined Report BC Hydro Fiscal 2020 First Quarter Summary Report of Customer Complaints and Consecutive Estimates [PDF, 438 KB]
July 29, 2019
BC Hydro New PPA Section 2.5 Guidelines (2014) BC Hydro Section 2.5 Guidelines Withdrawal Request [PDF, 96 KB]
July 23, 2019
BC Hydro NEB Electricity Export Permit - June 2019 Report June 2019 Export Permit Report [PDF, 96 KB]
July 12, 2019
Greenhouse Gas Reduction (Clean Energy) Regulation Reporting - BC Hydro Fiscal 2019 Annual Report BC Hydro Fiscal 2019 Annual Report  [PDF, 765 KB]
June 28, 2019
City of Coquitlam Reconsideration and Variance of Order G-80-19 (2019) BC Hydro Submission on Process [PDF, 132 KB]
June 27, 2019
WAC Bennett Riprap Upgrade Project - Final Completion and Evaluation Report Final Completion and Evaluation Report [PDF, 782 KB]
June 25, 2019
BC Hydro NEB Electricity Export Permit - May 2019 Report May 2019 Export Permit Report [PDF, 92 KB]
June 14, 2019
BC Hydro John Hart Generating Station Replacement Project (2012) - Semi-Annual Report BC Hydro Semi-Annual Progress Report No. 11 - October 2018 to March 2019 [2.4 MB]
May 29, 2019
BC Hydro Transmission Service Freshet Energy RS 1892 Extension - Compliance with G-106-19 D2 Compliance with BCUC Order No. G-106-19 Directive 2 [PDF, 413 KB]
May 28, 2019
BC Hydro Letter Agreement with Powerex Corp.

Forward Electricity Purchases, as amended [PDF, 9.0 MB]
May 23, 2019

Confirmation - February 28, 2019 [PDF, 226 KB]

 

BC Hydro Mandatory Reliability Standards compliance with NEB Order MO-036-2012 Directive 7 Jan 24 2019 - Response to NEB Information Request Response to NEB Information Request from May 10, 2019 [PDF, 265 KB]
May 21, 2019
F2005/F2006 Revenue Requirements Application Compliance - F2019 Annual Reporting of Reliability Indices [PDF, 1.0 MB]
May 15, 2019
BC Hydro Rate for Boralex LP Electricity Service Report on BC Hydro's discussions with Boralex LP of a possible negotiated long-term electricity purchase agreement renewal between the parties [PDF, 140 KB]
May 15, 2019
BC Hydro John Hart Generating Station Replacement Project (2012) - Semi-Annual Report Extension request for filing Semi-Annual Progress Report No. 11 (October 2018 to March 2019) [PDF, 19 KB]
May 13, 2019
BC Hydro Ruskin Dam and Powerhouse Upgrade CPCN - Semi-Annual Report Extension request for filing Semi-Annual Progress Report No. 14 (October 2018 to March 2019) [PDF, 19 KB]
May 13, 2019
BC Hydro NEB Electricity Export Permit - April 2019 Report April 2019 Export Permit Report [PDF, 89 KB]
May 13, 2019
BC Hydro Transmission Service Freshet Energy Rate Schedule 1892 Extension - Reply to Comments Compliance with BCUC Order No. G-82-19 Reply to Comment [PDF, 107 KB]
May 10, 2019
BC Hydro Mandatory Reliability Standards Assessment Report No. 12 BC Hydro Mandatory Reliability Standards Assessment Report No. 12 [PDF, 18.0 MB]
May 1, 2019
BC Hydro GMS Units 1 to 5 Turbine Replacement Project Project Final Completion Report [PDF, 486 KB]
April 30, 2019
BC Hydro Energy Supply Contract Filing Requirements - 2019 Q4 Period BC Hydro's letter in respect of its Amendments and Contractual Developments relating to its EPAs for January 1, 2019 to March 31, 2019 (Q4 Period) [PDF, 16 KB]
April 30, 2019
Customer Complaints & Consecutive Estimates Combined Report  Summary Report of Customer Complaints and Consecutive Estimates - Q4 F2019 [PDF, 164 KB]
April 26, 2019
BC Hydro Temporary Suspension of Generator Interconnection Procedure Timelines and Associated Studies for Standing Offer Program Participants - BC Hydro Response to BCUC Staff Information Request No. 1 Response to BCUC Staff Information Request No. 1 [PDF, 199 KB]
April 16, 2019
BC Hydro Application for Approval of Rate Schedule 1828 BC Hydro application for an Order approving Rate Schedule 1828 and to the B.C. Government's Direction to the BCUC Respecting the Biomass Energy Program (Order in Council No. 158) [PDF, 2.0 MB]
April 15, 2019
BC Hydro NEB Electricity Export Permit - March 2019 Report March 2019 Export Permit Report [PDF, 91 KB]
April 12, 2019
BC Hydro Transmission Service Rate F20 and F21 Pricing Principles Extension Appication – BC Hydro Resonse to Letters of Comment Responses to Letters of Comment [PDF, 147 KB]
April 10, 2019
BC Hydro Transmission Service Freshet Energy Rate Schedule 1892 Extension Application
Transmission Service Freshet Energy Rate Schedule 1892 Extension Application [PDF, 1.0 MB]
April 8, 2019
BC Hydro Electric Tariff Terms and Conditions Amendments – BC Hydro Responses to BCUC Staff Information Request No. 2  Responses to BCUC Staff Information Request No. 2 [PDF, 156 KB]
April 5, 2019
BC Hydro Fiscal 2019 Cost of Service Study Fiscal 2019 Cost of Service Study [PDF, 3.0 MB]
March 29, 2019
BC Hydro Rate for Boralex LP Electricity Service  Report on BC Hydro's further on-going discussions with Boralex LP of a possible negotiated long-term electricity purchase agreement renewal between the parties [PDF, 70 KB]
March 29, 2019
BC Hydro Temporary Suspension of Generation Interconnection Procedure Timelines and Associated Studies for Standing Offer Program Participants – Compliance w G-161-18 D3 Compliance with BCUC Order No. G-161-18 Directive 3 [PDF, 804 KB]
March 19, 2019
BC Hydro VITR Electromagnetic Fields Risk Assessment Results Report – Every Two Years BC Hydro Exponent Report on Electric and Magnetic Fields and Health: Review of the Scientific Research from January 2017 to December 2018 [PDF, 2.0 MB]
March 19, 2019
2017/2018 Winter Moratorium Pilot - Responses to BCUC Staff Information Request No. 1 2017/2018 Winter Moratorium Pilot - Responses to BCUC Staff Information Request No. 1 [PDF, 148 KB]
March 15, 2019
BC Hydro Transmission Service Stepped Rate F20 and F21 Pricing Principles Extension - BC Hydro Responses to BCUC Staff Information Request No. 1  Responses to BCUC Staff Information Request No. 1 [PDF, 1.0 MB]
March 12, 2019
BC Hydro NEB Electricity Export Permit - February 2019 Report February 2019 Export Permit Report [PDF, 96 KB]
March 8, 2019
BC Hydro Public Site C Annual Progress Report No. 3 Site C Annual Progress Report No. 3 (Combined with Quarterly Progress Report No. 14) - January 2018 to December 2018 - Public [PDF, 7.0 MB]
March 5, 2019
BC Hydro Rate for Boralex LP Electricity Service Report on BC Hydro's further on-going discussions with Boralex LP of a possible negotiated long-term electricity purchase agreement renewal between the parties [PDF, 66 KB]
February 28, 2019
BC Hydro Electric Tariff Terms and Conditions Amendments - BC Hydro Responses to BCUC Staff Information Request No. 1 Responses to BCUC Staff Information Request No. 1 [PDF, 857 KB]
February 21, 2019
BC Hydro W.A.C. Bennett Riprap Upgrade Project (2015) BC Hydro W.A.C. Bennett Riprap Dam Upgrade Project Annual Progress Report No. 3 - January 2018 to December 2018 [PDF, 1.0 MB]
February 15, 2019
BC Hydro Transmission Service Stepped Rate F2020 and F2021 Pricing Principles Extension BC Hydro applies for approval to extend the current BCUC approved pricing principles for RS 1823 - Transmission Service Rate Fiscal 2020 and Fiscal 2021 Pricing Principles Extension Application [PDF, 1.1 MB]
February 15, 2019
BC Hydro Fully Allocated Cost of Service (FACOS) Study - Annual Report BC Hydro Fully Allocated Cost of Service (FACOS) Study Annual Report F2017 Hydro Fully Allocated Cost of Service (FACOS) Study - Annual Report [PDF, 767 KB]
February 14, 2019
BC Hydro Salmon River Diversion Ceasing of Operations (2017) BC Hydro Responses to BCUC Staff Information Request No.1 for Substantial Completion Report - F2019 Report [PDF, 335 KB]
February 13, 2019
BC Hydro Energy Supply Contract Filing Requirements Amendments and Contractual Developments relating to Electricity Purchase Agreements for October 1, 2018 to December 31, 2018 (Q3 Period) [PDF, 81 KB]
February 7, 2019
BC Hydro NEB Electricity Export Permit - January 2019 Report January 2019 Export Permit Report [PDF, 88 KB]
February 7, 2019
BC Hydro Electricity Purchase Agreement (EPA) – Boralex LP’s Electricity Service to BC Hydro Rate Application (2017) BC Hydro report on its on-going discussions with Boralex LP of negotiated long-term EPA Renewal [PDF, 77 KB]
January 31, 2019
BC Hydro Advanced Meter Implementation Safety - Semi-Annual Report No.5 Meter / Meter Base Fire or High Temperature Safety Incident Semi-Annual Report No. 5 [PDF, 218 KB]
January 30, 2019
BC Hydro CEPR - BC Hydro Reply to Intervener Submissions in Compliance with Exhibit A-27  BC Hydro reply to Intervener Submissions in compliance with Exhibit A-27 [PDF, 78 KB]
January 30, 2019
BC Hydro Report of Customer Complaints and Consecutive Estimates BC Hydro Fiscal 2019 Third Quarter Report [PDF, 271 KB]
January 29, 2019
BC Hydro Compliance with MO-036-2012 for Electricity Reliability Standards BC Hydro compliance with NEB Order MO-036-2012, Order for Electricity Reliability Standards [PDF, 466 KB]
January 24, 2019
BC Hydro F18 DSM Milestone Evaluation Summary (Directive 66) BC Hydro Demand-Side Management Milestone Evaluation Summary Report F2018 - December 2018; and
BC Hydro Report for Evaluation of the Residential Inclining Block Rate: F2013-F2017 - April 2018 BC Hydro F18 DSM Milestone Evaluation Summary (Directive 66) [PDF, 2.9 MB]
January 15, 2019
BC Hydro Electric Tariff Terms and Conditions Amendments Application BC Hydro Electric Tariff Terms and Conditions Amendments Application [PDF, 2.1 MB]
January 15, 2019
BC Hydro Rate for Boralex LP Electricity Service Report on BC Hydro's further on-going discussions with Boralex LP of a possible negotiaged long-term electricity purchase agreement renewal between the parties [PDF, 43 KB]
January 11, 2019
BC Hydro Energy Supply Contract Filing Requirements BC Hydro's response to two requests from BCUC Staff relating to BC Hydro's quarterly update to the Commission in respect of its Amendments and Contractual Developments relating to EPAs for F2019 Quarter 2 period [PDF, 287 KB]
January 9, 2019
BC Hydro NEB Electricity Export Permit December 2018 Report [PDF, 96 KB]
January 9, 2019
BCUC Regulation of Electric Vehicle Charging Service Inquiry Phase 1 - PACA BC Hydro Comments [PDF, 50 KB]
January 3, 2019
Exhibit C1-1 - Letter dated August 9, 2019