Skip to content

   

Be prepared for storm season. Safety tips and videos

Puntledge River Water Use Planning

  • Water Use Plan [PDF, 1.7 MB] accepted by the Comptroller of Water Rights and implemented in January 2005
  • Executive summary [PDF, 124 KB] of Consultative Committee Report provides an overview of the water use planning process and outcomes
  • Consultative Committee Report and draft Water Use Plan submitted to the Comptroller of Water Rights in December 2003
  • Project initiated June 2001 and completed June 2003

Annual Reports

 

Projects Studies Terms of Reference

PUNMON-1 Assessment of Adult Fish Passage during Pulse Flow Releases

PUNMON-2 Assessment of Egg Incubation Success in Reach C

PUNMON-3 Steelhead Production

PUNMON-4 Evaluating Effects of Ramping Rates on Fish Stranding in Puntledge River (Reach C)

PUNMON-5 Kayak Pulse Flow Cost–Benefit Assessment

PUNWORKS-1 Gravel Replacement in the Puntledge River