Custom project incentives
Bonus offer
We're currently offering a 30% bonus incentive for all custom project incentives projects submitted between June 3, 2025 and February 11, 2027. To be eligible, projects must be completed by March 14, 2028.
Get funding for energy management upgrades at your business
We offer funding to improve or expand your facility's energy systems, better manage your demand charges, or reduce your reliance on fossil fuel powered equipment with energy efficient electrical upgrades. Funding is based on your project's energy-saving potential, up to a maximum of 100% of capital costs. The more energy your project saves, the more funding you are eligible for.
You can get incentives for the following project types:
- Energy efficiency improvements: Projects include equipment upgrades, new plant design or expansions to existing facilities. This also includes load displacement projects, where you install customer-owned, renewable electricity generation equipment to offset your energy use.
- Efficient electrification: Projects that help businesses decarbonize using advanced technologies that improve energy efficiency and reduce overall demand on the grid.
- Demand response: Projects to reduce or shift some of your energy usage during specified dates and times of peak demand on our system.
The offer
Get generous funding towards the implementation of energy management opportunities at your industrial or large commercial facility. Your custom incentive funding amount can shorten the payback of your project costs, providing a better return on your investment.
| Project type | Funding available |
|---|---|
Energy efficiency Efficient electrification Load displacement |
Incentive calculations include:
The levelized incentive rate is 2¢–5¢/kWh for distribution customers and 4.5¢/kWh for transmission customers. |
| Demand response | $50 to $75 per kilowatt (kW) of demand reduced, depending on project opportunity or program participation. |
How it works
- Gather the information required for your application.
- Most applicants have pursued a feasibility study first, which results in a detailed report including all the information required.
- If you're not pursuing that study, contact us and we'll provide a technical requirements document that your engineer or consultant can complete.
- Submit an application.
- We'll perform an engineering and financial review of your project and calculate an incentive amount.
- We'll send you an agreement package for your signature which includes the incentive amount and the terms and conditions.
- Work with your contractors to purchase and install the equipment.
- Once your project is installed, send us copies of your paid invoices along with your completion documents (listed in your agreement package). We'll then review your documents and process the incentive payment.
Note that there may be measurement and verification checks on the overall performance of the project after its completion, as we deem necessary. We'll outline this in your agreement package.
Eligibility
- You're an industrial customer on our small, medium, or large general service distribution rate or transmission rate, or you're a large commercial customer on those distribution rates with company-wide annual electricity consumption of 2 gigawatt-hours (GWh) or more.
- For energy efficiency projects, including load displacement and efficient electrification, the minimum energy savings must be at least 25,000 kWh per year.
- For demand-response projects, the minimum demand impact must be at least 25 kW.
- Your site falls into one of the following categories:
- Your site has been operational for a minimum of six months prior to applying,
- Your site is a new facility, or
- You're planning an expansion that will grow your site's energy use by more than 10%.
Eligible costs
This incentive can be applied to all aspects of your project costs, including design, equipment, installation, disposal of old equipment, and tax.