Selected Technical Reports

  1. Probabilistic Risk Assessment of an Islanding Operation of Jordan River Generation  [PDF, 375 KB] Posted: November 9 2007
  2. Probabilistic Reliability Assessment of Qualicum Substation Reconfiguration [PDF, 401 KB] Posted: November 9, 2007
  3. Probabilistic Reliability Assessment of Central Vancouver Island Transmission Project [Expected Energy Not Supplied Assessment] [PDF, 295 KB] Posted: November 9, 2007
  4. Benefit/Cost Analysis Based on Reliability and Transmission Loss Considerations for Central Vancouver Island [PDF, 508 KB] Posted: November 9, 2007
  5. “Cathedral Square Substation Contingency Plans Using Probabilistic Risk Assessment”, July 2006  [PDF,133 KB] Posted: October 20, 2006
  6. “Reliability Assessment of 60L43 and 60L44”, June 2006  [PDF, 71 KB] Posted: October 20, 2006
  7. “Probability Distribution of HVDC Capacity and Impacts of Two Key Components”, Report: BCTC-SPA-R003, May 5, 2004 [PDF, 658 KB] Posted: October 20, 2006
  8. “Quantifying the Number of 138/25 kV 25 MVA Spare Transformers Required Using Probabilistic Risk Assessment”, April 2006   
     [PDF, 93 KB6] Posted: October 20, 2006
  9. “Quantifying Mobile Transformers for Southern Interior and Vancouver Island Regions Using Probabilistic Risk Assessment”, April 2006  [PDF, 152 KB] Posted: October 20/06
  10. “Reliability Assessment of Cathedral Square Substation”, March 2006 [PDF, 208 KB] Posted: October 20, 2006
  11. “Risk Assessment and Replacement Strategy for Cable 1 of HVDC Pole 1”, Report BCTC-SPPA-R010, February 27, 2006 [PDF, 121 KB] Posted: October 20, 2006
  12. “Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part I: Reliability Improvements due to VITR”, Report BCTC-SPPA-R009A, December 8, 2005 [PDF, 216 KB] Posted: October 20, 2006
  13. Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part II: Comparison between VITR and Sea Breeze HVDC Light Options”, Report BCTC-SPPA-R009B, December 23, 2005 [PDF, 313 KB] Posted: October 20, 2006
  14. “Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part III: Reliability Analysis for Power Supply to Gulf Islands”, Report BCTC-SPPA-R009C, December 30, 2005 [PDF, 166 KB] Posted: October 20, 2006
  15. “Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part IV: Effects of Existing HVDC on VI Power Supply Reliability”, Report BCTC-SPPA-R009D, January 9, 2006 [PDF, 260 KB] Posted: October 20, 2006
  16. “Expected Energy Not Served (EENS) Study for Vancouver Island Transmission Reinforcement Project, Part V: Monthly Reliability Profile of VITR”, Report BCTC-SPPA-R009E, January 24, 2006
    [PDF, 81 KB] Posted: October 20, 2006
  17. “Risk Evaluation of Meridian Substation Transformers”, Report BCTC-SPPA-R008, August 8, 2005 [PDF, 75 KB] Posted: October 20, 2006
  18. Impacts of Long Time Outage of Transformer T2 on Power Supply Reliability at Substation FVW”, Report BCTC-SPPA-R007, July 6, 2005 [PDF, 47 KB] Posted: October 20, 2006
  19. "Estimating End-of-Life Failure Probability of 2L53 Cable”, Report BCTC-SPPA-R006, June 29, 2005 [PDF, 37 KB] Posted: October 20, 2006
  20. “Reliability Evaluation of Three Scenarios for Vancouver Island Power Supply - An Expected Energy Not Served (EENS) Study, BCTC Report: BCTC-SPA-R001, June 11, 2003 [PDF, 192 KB] Posted: October 20, 2006
  21. Probability Distribution of HVDC Capacity and Impacts of Two Key Components [PDF, 656 KB]