Wilsey Fish Passage Project

Image of the Wilsey Dam fish passage

Fish passage at Wilsey Dam

We studied multiple methods to best allow salmon access to spawning habitats in the Shuswap River above Wilsey Dam and have confirmed decommissioning as the preferred alternative.

BC Hydro has been working with the Wilsey Dam Fish Passage Committee to provide access to 32 kilometres of historical spawning habitat upstream of the Wilsey Dam.

This project involves several complex and interrelated components—including the evaluation of decommissioning, environmental considerations and engagement with First Nations and a diverse group of stakeholders. Our project team, including engineers, environmental specialists and others continue to analyze the data from the Trial Sediment Release, which will streamline the decommissioning process.

Wilsey Dam and the Shuswap Falls powerhouse are located on the Shuswap River about 35 km east of Vernon along Highway 6.

Wilsey Dam project map

Project Update/Timelines Project steps

Estimated duration of each stepEarliest completion of each step
Step 1Preliminary investigation of potential Wilsey Dam decommissioning and determine a leading alternative for fish passage.

CompleteFall 2021
Step 2Complete detailed studies to determine feasibility. BC Hydro Board of Directors: review project plans and approve decommissioning as the preferred alternative.

CompleteMarch 2026
Step 3Complete design and submit regulatory applications (e.g., BC Water Comptroller Approvals, DFO Authorization, and Archaeological Assessments).

1 to 2 years2028
Step 4Regulatory review and approval.

12 monthsFall 2029
Step 5If approved, detailed design, specifications and procurement is completed and then project construction will start.

24 months2030

 