Coquitlam Pole and Power Line Replacement

We're replacing aging poles and power lines between Como Lake Substation in Coquitlam and Barnard Substation in Burnaby to ensure we can continue delivering reliable power to your community.

What's new

March 2026

Starting April 2026, pole and power line replacement will resume along the north side of Como Lake Avenue at Linton Street in Coquitlam. Construction will move west, continuing along Broadway in Burnaby. Some additional vegetation trimming may be required. Work on the north side of the corridor is expected to be complete by summer 2026.

Starting August 2026, pre-work (including brush clearing and pruning) is expected to begin on the south side of Como Lake Avenue between Montrose and Blue Mountain Street. Pole and power line replacement on the south side of the corridor will follow.

We're replacing wooden poles and overhead power lines between Como Lake Substation in Coquitlam and Barnard Substation near the Burnaby/Coquitlam border.

Many of the wooden poles and power lines between Como Lake and Barnard substations are nearing end-of-life. Replacing these structures will help ensure service reliability for your community.

We're replacing poles and power lines along a corridor between Lougheed Highway and Como Lake Avenue to the east and Gaglardi Way and Broadway to the west.

We've completed work on the north side as far west as Como Lake Avenue and Linton Street. We'll resume work on the north side, moving west and continuing into Burnaby.

We'll also replace poles and power lines along the south side of Como Lake Avenue between Montrose and Blue Mountain streets.
 

Coquitlam pole and power line replacement project map

Coquitlam pole and power line replacement project map

Select the project map [PDF, 1.4 MB] to view it at a larger size.
 

Dates Activities
Spring 2025 (Complete) Pre-work, including clearing brushes and pruning branches.
Spring/Summer 2025 (Complete) North side – first phase: Pole and power line replacement between the Como Lake substation and Como Lake Avenue and Linton Street.
Spring/Summer 2026 North side – second phase: Pole and power line replacement resumes on Como Lake Avenue at Linton Street and moves west, ending near the Barnard substation.
Summer/Fall 2026 South side: Pre-work followed by construction on Como Lake Avenue between Montrose and Blue Mountain streets.

 

Reports and documents

Get in touch

If you'd like to learn more about the project, please contact us at:

Email: projects@bchydro.com
Phone: 604 623 4472
Toll free: 1 866 647 3334