This is for customers who've been pre-approved for the EV charger rebate only. If you were pre-approved for the EV Ready infrastructure rebate at the same time, refer to that option above instead.
1. Charger invoice
A complete copy of the paid, itemized receipt for eligible charger(s). Must include retailer's name, address and phone number. If this cost is included with the installation invoice, you can indicate this at time of upload.
2. Proof of charger internet connectivity
A screenshot of the back-end network operating system showing that the charging stations are connected to the network.
3. Installation invoice
A copy of the paid invoice for the cost of the charger and/or electrical infrastructure installation labour and construction by a licensed electrician.
4. Pictures of installed charger(s)
Pictures of the installed charging station(s). One picture per station if multiple stations are part of your application.
Note: If your building has previously participated in our EV Ready plan and infrastructure rebate, you'll be asked to upload the EV Ready contractor installation form b instead.
Download form
5. Invoice for other eligible costs (optional)
If applicable, a copy of the paid, itemized receipt for other eligible costs such as site assessments, permits, parking and electrical design, and EV parking signage.
You'll also need the following information on hand:
Electrical permit number for the installation