Stave River Water Use Plan

  • Water Use Plan [PDF, 2.2 MB] accepted by the Comptroller of Water Rights and implemented in May 2004.
  • Executive summary [PDF, 38 KB] of Consultative Committee Report [PDF, 4.7 MB] and an article [PDF, 18 KB] written by Charlotte Bemister provides an overview of the water use planning process and outcomes.
  • Project completed November 1999.

Water Use Plan Order Review

WUPOR paused due to COVID-19

WUPOR Status Update (April 2020) – The draft Monitoring Program Synthesis Report comment period has closed and all comments and feedback are being reviewed with follow-ups in progress. When complete, an updated final Report will be posted here (date to be determined). After the Monitoring Program Synthesis Report is final, we will complete a draft WUPOR Report that will also be posted here for review (date to be determined). Please review the Stave River Order Review Fact Sheet [PDF, 260 KB] for linkages to the Alouette Water Use Plan Order Review.

Provincial and Program Information

Annual Reports

 

Projects Studies Terms of Reference

SFLMON-1 Pelagic Monitor

SFLMON-2 Littoral Productivity Assessment

SFLMON-3 Fish Biomass Assessment

SFLMON-4 Limited Block Load as Deterrent to Spawning

SFLMON-5 Risk of Adult Stranding

SFLMON-6 Risk of Fry Stranding

SFLMON-7 Diel Pattern Fry Out-Migration

SFLMON-8 Seasonal Timing and Assemblage of Resident Fish

SFLMON-9 Turbidity Levels in Hayward Reservoir

SFLMON-10 Archaeological Management