Once you have chosen a contractor and determined your product requirements, you are ready to apply for the Power Smart Product Incentive Program.
You'll need to have the following information ready:
- BC Hydro account number(s) and postal code(s) of the facility(s) that you plan to retrofit.
- Information about your preferred installer.
- Quantity and type of product(s) you will be replacing.
- Where in the facility the installation will occur. E.g., SW section of 2nd floor.
- List of energy-efficient product(s) that you will be installing.
- Download our Getting Started Checklist [PDF, 29 Kb]
| Important: - BC Hydro will review your application and provide a response via email within 5 business days.
- Do not purchase or install your products until you have received an email approval from BC Hydro.
- Incentives will only be paid on approved products. For a complete list, refer to BC Hydro's e.Catalog.
- To ensure that all required products are accurately reflected on your application, have your Alliance contractor or participating distributor fill in your product requirements for you.
|
View some Common Questions.
First time users: Apply Now.
Already registered? Log in
For More Info
The sooner you apply, the sooner the savings begin.
Questions?
Email us or
Phone: 604 522-4713 in the Lower Mainland
Toll free: 1 866 522-4713
Last Modified: Dec 2, 2005