Appendix A | |
Appendix B | B.C. Government policy and regulatory documents: |
Appendix C | |
Appendix D | |
Appendix E | |
Appendix F | ROU-related documents: - Resource Options Database ( RODAT) sheets (F1) [PDF, 1.3 Mb]
- The Powertech Labs Inc. ( Powertech) Technology Summary Clean Coal Power Generation by CO 2 Sequestration;(F2) [PDF, 179 Kb]
- BC Hydro's wind integration cost assessment' (F3) [PDF, 296 Kb]
- The BC Hydro Engineering report concerning Jordan River pumped storage (F4a) [PDF, 493 Kb]
- Powertech evaluation of the Jorvic Sewage Reclaim Pipeline at BC Hydro's Jordan River Hydroelectric Project (F4b) [PDF, 131 Kb]
- The Kerr Wood Leidal Associates Ltd. (Kerr Wood) Run-of-River Resource Assessment for B.C. (F5) [PDF, 15.2 Mb]
- The Garrad Hassan Canada Inc. (GH) Assessment of the Energy Potential and Estimated Costs in B.C of Wind Energy (F6) [PDF, 1.3 Mb]
- The AMEC Americas Limited (AMEC) Gas-Fired Combustion Turbine Power Plant Costs and Performance Update report (F7) [PDF, 836 Kb]
- Potential Large Hydro Project report ( F8) [PDF, 276 Kb]
- Integrated System (transmission) Planning Assumptions (F9) [PDF, 162 Kb]
- Calculation of Capacity Planning Reserves as filed in the 2007 Alcan EPA proceeding (F10) – Revision of July 4, 2008 [PDF, 332 Kb]
- Estimated Unit Energy Cost (UEC) Cost Adjustment Values (F11) – Revision of September 5, 2008 [PDF, 244 Kb]
- Effective Load Carrying Capability (ELCC) Firm Energy Load Carrying Capability (FELCC) of Intermittent Resources report (F12) [PDF, 211 Kb]
- Comparison of the 2008 ROU to the 2006 Call (F13) [PDF, 117 Kb]
- The Risk Framework Explanation and Applications (F14) [PDF, 512 Kb]
- Resource Planning Models (F15) [PDF, 142 Kb]
- Portfolios and Analysis (F16) – Revision of September 5, 2008 [PDF, 2.5 Mb]
- DSM Resource Options (F17) – Revision of September 5, 2008 [PDF, 175 Kb]
|
Appendix G | Three Natsource GHG price forecast-related reports, as follows: |
Appendix H | |
Appendix I | |
Appendix J | Four Burrard-related reports, as follows: - AMEC's Condition Assessment and Alternative Configuration Study-Burrard Generating Station:
- RWDI Air Inc.'s (RWDI)
|
Appendix K | |
Appendix L | Two Site C-related reports: |
Appendix M | |
Appendix N | |
Appendix O | |
Appendix P | |
Appendix Q | |
Appendix R | |