Skip to content

News Release

This news release was posted more than two years ago. View our latest news releases here.

BCTC release: service completed on submarine cable

VANCOUVER – One of two 500 kilovolt electrical submarine circuits connecting Vancouver Island to the Lower Mainland is back in service following repair. The circuit was taken out of service in April due to equipment damage.

During the repair, Vancouver Island continued to be supplied with electricity by the second 500 kilovolt circuit, on-island generation, and other cable connections between Vancouver Island and the mainland.

Portions of B.C.'s transmission system, such as the connections to Vancouver Island, are designed with backup systems to attempt to ensure there is continuous, reliable supply of electricity.

Contact:

British Columbia Transmission Corporation
BCTC Public Affairs
Phone: 604.699.7298
www.bctc.com

Source: BC Hydro News