** BC HYDRO - GENERATION AND HYDROMETEOROLOGIC INFORMATION ** CLIMATE, SNOW AND/OR SURFACE WATER STATION: Yalakom R ab Ore Ck (yao) Note: Data are provided for information only. BC Hydro does not guarantee their accuracy. Data are based on automated readings which are from time to time inaccurate. Date Time Water level Discharge Water temperature (yyyy/mm/dd) (PST) (m) (cms) (°C) 2025/09/17 20:15:00 2.890 2025/09/17 20:10:00 2.900 2025/09/17 20:05:00 2.930 2025/09/17 20:00:00 2.910 2025/09/17 19:55:00 2.900 2025/09/17 19:50:00 2.890 2025/09/17 19:45:00 2.870 2025/09/17 19:40:00 2.910 2025/09/17 19:35:00 2.890 2025/09/17 19:30:00 2.890 2025/09/17 19:25:00 2.890 2025/09/17 19:20:00 2.880 2025/09/17 19:15:00 2.850 2025/09/17 19:10:00 2.930 2025/09/17 19:05:00 2.910 2025/09/17 19:00:00 2.900 2025/09/17 18:55:00 2.910 2025/09/17 18:50:00 2.890 2025/09/17 18:45:00 2.910 2025/09/17 18:40:00 2.900 2025/09/17 18:35:00 2.890 2025/09/17 18:30:00 2.900 2025/09/17 18:25:00 2.880 2025/09/17 18:20:00 2.940 2025/09/17 18:15:00 2.910 2025/09/17 18:10:00 2.900 2025/09/17 18:05:00 2.890 2025/09/17 18:00:00 2.930 2025/09/17 17:55:00 2.910 2025/09/17 17:50:00 2.900 2025/09/17 17:45:00 2.910 2025/09/17 17:40:00 2.900 2025/09/17 17:35:00 2.890 2025/09/17 17:30:00 2.890 2025/09/17 17:25:00 2.930 2025/09/17 17:20:00 2.910 2025/09/17 17:15:00 2.910 2025/09/17 17:10:00 2.910 2025/09/17 17:05:00 2.930 2025/09/17 17:00:00 2.880 2025/09/17 16:55:00 2.870 2025/09/17 16:50:00 2.930 2025/09/17 16:45:00 2.870 2025/09/17 16:40:00 2.930 2025/09/17 16:35:00 2.930 2025/09/17 16:30:00 2.900 2025/09/17 16:25:00 2.940 2025/09/17 16:20:00 2.900 2025/09/17 16:15:00 2.880 2025/09/17 16:10:00 2.910 2025/09/17 16:05:00 2.890 2025/09/17 16:00:00 2.910 2025/09/17 15:55:00 2.930 2025/09/17 15:50:00 2.870 2025/09/17 15:45:00 2.900 2025/09/17 15:40:00 2.950 2025/09/17 15:35:00 2.930 2025/09/17 15:30:00 2.910 2025/09/17 15:25:00 2.940 2025/09/17 15:20:00 2.910 2025/09/17 15:15:00 2.910 2025/09/17 15:10:00 2.930 2025/09/17 15:05:00 2.950 2025/09/17 15:00:00 2.900 2025/09/17 14:55:00 2.940 2025/09/17 14:50:00 2.910 2025/09/17 14:45:00 2.910 2025/09/17 14:40:00 2.980 2025/09/17 14:35:00 2.910 2025/09/17 14:30:00 2.940 2025/09/17 14:25:00 2.940 2025/09/17 14:20:00 2.930 2025/09/17 14:15:00 2.940 2025/09/17 14:10:00 2.960 2025/09/17 14:05:00 2.910 2025/09/17 14:00:00 2.940 2025/09/17 13:55:00 2.910 2025/09/17 13:50:00 2.950 2025/09/17 13:45:00 2.980 2025/09/17 13:40:00 2.950 2025/09/17 13:35:00 2.940 2025/09/17 13:30:00 2.880 2025/09/17 13:25:00 2.980 2025/09/17 13:20:00 2.990 2025/09/17 13:15:00 2.980 2025/09/17 13:10:00 2.980 2025/09/17 13:05:00 2.990 2025/09/17 13:00:00 2.960 2025/09/17 12:55:00 2.990 2025/09/17 12:50:00 2.940 2025/09/17 12:45:00 2.990 2025/09/17 12:40:00 2.980 2025/09/17 12:35:00 2.910 2025/09/17 12:30:00 2.930 2025/09/17 12:25:00 3.000 2025/09/17 12:20:00 2.890 2025/09/17 12:15:00 2.960 2025/09/17 12:10:00 3.000 2025/09/17 12:05:00 3.010 2025/09/17 12:00:00 3.010 2025/09/17 11:55:00 2.950 2025/09/17 11:50:00 2.960 2025/09/17 11:45:00 2.980 2025/09/17 11:40:00 2.980 2025/09/17 11:35:00 2.990 2025/09/17 11:30:00 2.980 2025/09/17 11:25:00 3.000 2025/09/17 11:20:00 2.990 2025/09/17 11:15:00 2.980 2025/09/17 11:10:00 3.010 2025/09/17 11:05:00 2.960 2025/09/17 11:00:00 3.010 2025/09/17 10:55:00 2.950 2025/09/17 10:50:00 2.950 2025/09/17 10:45:00 2.960 2025/09/17 10:40:00 2.980 2025/09/17 10:35:00 2.990 2025/09/17 10:30:00 3.000 2025/09/17 10:25:00 2.950 2025/09/17 10:20:00 2.890 2025/09/17 10:15:00 3.000 2025/09/17 10:10:00 2.990 2025/09/17 10:05:00 2.940 2025/09/17 10:00:00 3.010 2025/09/17 09:55:00 2.990 2025/09/17 09:50:00 2.960 2025/09/17 09:45:00 2.980 2025/09/17 09:40:00 2.950 2025/09/17 09:35:00 2.990 2025/09/17 09:30:00 3.010 2025/09/17 09:25:00 2.980 2025/09/17 09:20:00 2.980 2025/09/17 09:15:00 2.980 2025/09/17 09:10:00 2.960 2025/09/17 09:05:00 2.960 2025/09/17 09:00:00 2.990 2025/09/17 08:55:00 3.000 2025/09/17 08:50:00 3.000 2025/09/17 08:45:00 3.000 2025/09/17 08:40:00 2.950 2025/09/17 08:35:00 2.980 2025/09/17 08:30:00 2.980 2025/09/17 08:25:00 2.940 2025/09/17 08:20:00 2.940 2025/09/17 08:15:00 2.960 2025/09/17 08:10:00 2.980 2025/09/17 08:05:00 2.980 2025/09/17 08:00:00 2.910 2025/09/17 07:55:00 2.990 2025/09/17 07:50:00 2.940 2025/09/17 07:45:00 2.960 2025/09/17 07:40:00 2.980 2025/09/17 07:35:00 2.960 2025/09/17 07:30:00 2.980 2025/09/17 07:25:00 2.930 2025/09/17 07:20:00 2.940 2025/09/17 07:15:00 2.980 2025/09/17 07:10:00 2.990 2025/09/17 07:05:00 2.940 2025/09/17 07:00:00 2.990 2025/09/17 06:55:00 2.950 2025/09/17 06:50:00 2.960 2025/09/17 06:45:00 2.990 2025/09/17 06:40:00 2.950 2025/09/17 06:35:00 2.980 2025/09/17 06:30:00 2.900 2025/09/17 06:25:00 2.900 2025/09/17 06:20:00 2.950 2025/09/17 06:15:00 2.940 2025/09/17 06:10:00 2.940 2025/09/17 06:05:00 2.950 2025/09/17 06:00:00 2.980 2025/09/17 05:55:00 2.910 2025/09/17 05:50:00 2.980 2025/09/17 05:45:00 2.980 2025/09/17 05:40:00 2.930 2025/09/17 05:35:00 2.950 2025/09/17 05:30:00 2.950 2025/09/17 05:25:00 2.980 2025/09/17 05:20:00 2.950 2025/09/17 05:15:00 2.980 2025/09/17 05:10:00 2.910 2025/09/17 05:05:00 2.850 2025/09/17 05:00:00 2.980 2025/09/17 04:55:00 2.940 2025/09/17 04:50:00 2.950 2025/09/17 04:45:00 2.950 2025/09/17 04:40:00 2.960 2025/09/17 04:35:00 2.940 2025/09/17 04:30:00 2.980 2025/09/17 04:25:00 2.990 2025/09/17 04:20:00 2.990 2025/09/17 04:15:00 2.880 2025/09/17 04:10:00 2.980 2025/09/17 04:05:00 2.930 2025/09/17 04:00:00 2.940 2025/09/17 03:55:00 2.950 2025/09/17 03:50:00 2.960 2025/09/17 03:45:00 2.950 2025/09/17 03:40:00 2.930 2025/09/17 03:35:00 2.960 2025/09/17 03:30:00 2.940 2025/09/17 03:25:00 2.930 2025/09/17 03:20:00 2.960 2025/09/17 03:15:00 2.960 2025/09/17 03:10:00 2.940 2025/09/17 03:05:00 2.930 2025/09/17 03:00:00 2.950 2025/09/17 02:55:00 2.950 2025/09/17 02:50:00 2.930 2025/09/17 02:45:00 2.890 2025/09/17 02:40:00 2.870 2025/09/17 02:35:00 2.930 2025/09/17 02:30:00 2.950 2025/09/17 02:25:00 2.950 2025/09/17 02:20:00 2.900 2025/09/17 02:15:00 2.900 2025/09/17 02:10:00 2.960 2025/09/17 02:05:00 2.960 2025/09/17 02:00:00 2.960 2025/09/17 01:55:00 2.930 2025/09/17 01:50:00 2.940 2025/09/17 01:45:00 2.960 2025/09/17 01:40:00 2.950 2025/09/17 01:35:00 2.900 2025/09/17 01:30:00 2.950 2025/09/17 01:25:00 2.960 2025/09/17 01:20:00 2.950 2025/09/17 01:15:00 2.910 2025/09/17 01:10:00 2.930 2025/09/17 01:05:00 2.950 2025/09/17 01:00:00 2.910 2025/09/17 00:55:00 2.960 2025/09/17 00:50:00 2.940 2025/09/17 00:45:00 2.940 2025/09/17 00:40:00 2.880 2025/09/17 00:35:00 2.950 2025/09/17 00:30:00 2.940 2025/09/17 00:25:00 2.980 2025/09/17 00:20:00 2.940 2025/09/17 00:15:00 2.950 2025/09/17 00:10:00 2.960 2025/09/17 00:05:00 2.930 2025/09/17 00:00:00 2.940 2025/09/16 23:55:00 2.930 2025/09/16 23:50:00 2.940 2025/09/16 23:45:00 2.910 2025/09/16 23:40:00 2.930 2025/09/16 23:35:00 2.950 2025/09/16 23:30:00 2.930 2025/09/16 23:25:00 2.960 2025/09/16 23:20:00 2.940 2025/09/16 23:15:00 2.910 2025/09/16 23:10:00 2.940 2025/09/16 23:05:00 2.890 2025/09/16 23:00:00 2.930 2025/09/16 22:55:00 2.900 2025/09/16 22:50:00 2.940 2025/09/16 22:45:00 2.900 2025/09/16 22:40:00 2.930 2025/09/16 22:35:00 2.940 2025/09/16 22:30:00 2.940 2025/09/16 22:25:00 2.940 2025/09/16 22:20:00 2.940 2025/09/16 22:15:00 2.870 2025/09/16 22:10:00 2.930 2025/09/16 22:05:00 2.960 2025/09/16 22:00:00 2.950 2025/09/16 21:55:00 2.950 2025/09/16 21:50:00 2.910 2025/09/16 21:45:00 2.950 2025/09/16 21:40:00 2.930 2025/09/16 21:35:00 2.840 2025/09/16 21:30:00 2.960 2025/09/16 21:25:00 2.930 2025/09/16 21:20:00 2.940 2025/09/16 21:15:00 2.940 2025/09/16 21:10:00 2.900 2025/09/16 21:05:00 2.890 2025/09/16 21:00:00 2.940 2025/09/16 20:55:00 2.960 2025/09/16 20:50:00 2.950 2025/09/16 20:45:00 2.930 2025/09/16 20:40:00 2.890 2025/09/16 20:35:00 2.940 2025/09/16 20:30:00 2.940 2025/09/16 20:25:00 2.940 2025/09/16 20:20:00 2.950 2025/09/16 20:15:00 2.950 2025/09/16 20:10:00 2.930 2025/09/16 20:05:00 2.980 2025/09/16 20:00:00 2.960 2025/09/16 19:55:00 2.930 2025/09/16 19:50:00 2.940 2025/09/16 19:45:00 2.910 2025/09/16 19:40:00 2.940 2025/09/16 19:35:00 2.950 2025/09/16 19:30:00 2.960 2025/09/16 19:25:00 2.960 2025/09/16 19:20:00 2.950 2025/09/16 19:15:00 2.960 2025/09/16 19:10:00 2.980 2025/09/16 19:05:00 2.940 2025/09/16 19:00:00 2.890 2025/09/16 18:55:00 2.930 2025/09/16 18:50:00 2.950 2025/09/16 18:45:00 2.940 2025/09/16 18:40:00 2.910 2025/09/16 18:35:00 2.960 2025/09/16 18:30:00 2.940 2025/09/16 18:25:00 3.000 2025/09/16 18:20:00 2.980 2025/09/16 18:15:00 2.930 2025/09/16 18:10:00 2.930 2025/09/16 18:05:00 2.930 2025/09/16 18:00:00 2.980 2025/09/16 17:55:00 2.960 2025/09/16 17:50:00 2.980 2025/09/16 17:45:00 3.000 2025/09/16 17:40:00 2.950 2025/09/16 17:35:00 2.950 2025/09/16 17:30:00 2.950 2025/09/16 17:25:00 2.960 2025/09/16 17:20:00 2.940 2025/09/16 17:15:00 2.940 2025/09/16 17:10:00 3.000 2025/09/16 17:05:00 3.000 2025/09/16 17:00:00 2.940 2025/09/16 16:55:00 2.950 2025/09/16 16:50:00 2.980 2025/09/16 16:45:00 2.950 2025/09/16 16:40:00 3.000 2025/09/16 16:35:00 2.950 2025/09/16 16:30:00 2.930 2025/09/16 16:25:00 2.980 2025/09/16 16:20:00 3.000 2025/09/16 16:15:00 2.980 2025/09/16 16:10:00 2.960 2025/09/16 16:05:00 3.040 2025/09/16 16:00:00 2.950 2025/09/16 15:55:00 2.990 2025/09/16 15:50:00 2.980 2025/09/16 15:45:00 2.960 2025/09/16 15:40:00 3.030 2025/09/16 15:35:00 2.950 2025/09/16 15:30:00 2.950 2025/09/16 15:25:00 3.010 2025/09/16 15:20:00 3.000 2025/09/16 15:15:00 3.000 2025/09/16 15:10:00 3.000 2025/09/16 15:05:00 2.950 2025/09/16 15:00:00 3.000 2025/09/16 14:55:00 3.000 2025/09/16 14:50:00 2.940 2025/09/16 14:45:00 2.980 2025/09/16 14:40:00 3.000 2025/09/16 14:35:00 3.000 2025/09/16 14:30:00 3.030 2025/09/16 14:25:00 2.980 2025/09/16 14:20:00 2.980 2025/09/16 14:15:00 3.030 2025/09/16 14:10:00 3.000 2025/09/16 14:05:00 2.990 2025/09/16 14:00:00 3.010 2025/09/16 13:55:00 3.010 2025/09/16 13:50:00 3.030 2025/09/16 13:45:00 3.010 2025/09/16 13:40:00 3.010 2025/09/16 13:35:00 3.010 2025/09/16 13:30:00 3.050 2025/09/16 13:25:00 2.990 2025/09/16 13:20:00 3.030 2025/09/16 13:15:00 2.990 2025/09/16 13:10:00 2.990 2025/09/16 13:05:00 3.010 2025/09/16 13:00:00 3.010 2025/09/16 12:55:00 3.010 2025/09/16 12:50:00 3.030 2025/09/16 12:45:00 3.060 2025/09/16 12:40:00 2.990 2025/09/16 12:35:00 3.030 2025/09/16 12:30:00 2.990 2025/09/16 12:25:00 3.040 2025/09/16 12:20:00 3.010 2025/09/16 12:15:00 3.040 2025/09/16 12:10:00 3.030 2025/09/16 12:05:00 3.010 2025/09/16 12:00:00 2.980 2025/09/16 11:55:00 3.030 2025/09/16 11:50:00 3.050 2025/09/16 11:45:00 3.030 2025/09/16 11:40:00 3.040 2025/09/16 11:35:00 3.030 2025/09/16 11:30:00 3.030 2025/09/16 11:25:00 3.010 2025/09/16 11:20:00 2.980 2025/09/16 11:15:00 3.030 2025/09/16 11:10:00 3.040 2025/09/16 11:05:00 3.060 2025/09/16 11:00:00 3.010 2025/09/16 10:55:00 3.030 2025/09/16 10:50:00 3.010 2025/09/16 10:45:00 3.030 2025/09/16 10:40:00 2.990 2025/09/16 10:35:00 3.030 2025/09/16 10:30:00 3.030 2025/09/16 10:25:00 3.030 2025/09/16 10:20:00 3.030 2025/09/16 10:15:00 3.030 2025/09/16 10:10:00 3.000 2025/09/16 10:05:00 3.010 2025/09/16 10:00:00 3.030 2025/09/16 09:55:00 3.010 2025/09/16 09:50:00 2.980 2025/09/16 09:45:00 3.030 2025/09/16 09:40:00 2.980 2025/09/16 09:35:00 3.060 2025/09/16 09:30:00 2.960 2025/09/16 09:25:00 3.030 2025/09/16 09:20:00 3.060 2025/09/16 09:15:00 3.040 2025/09/16 09:10:00 3.010 2025/09/16 09:05:00 3.000 2025/09/16 09:00:00 3.050 2025/09/16 08:55:00 3.040 2025/09/16 08:50:00 2.980 2025/09/16 08:45:00 3.040 2025/09/16 08:40:00 3.050 2025/09/16 08:35:00 3.010 2025/09/16 08:30:00 3.060 2025/09/16 08:25:00 2.990 2025/09/16 08:20:00 3.030 2025/09/16 08:15:00 3.030 2025/09/16 08:10:00 3.040 2025/09/16 08:05:00 3.040 2025/09/16 08:00:00 2.950 2025/09/16 07:55:00 3.030 2025/09/16 07:50:00 2.990 2025/09/16 07:45:00 3.040 2025/09/16 07:40:00 3.060 2025/09/16 07:35:00 3.030 2025/09/16 07:30:00 2.980 2025/09/16 07:25:00 3.080 2025/09/16 07:20:00 3.040 2025/09/16 07:15:00 3.050 2025/09/16 07:10:00 3.050 2025/09/16 07:05:00 3.050 2025/09/16 07:00:00 3.040 2025/09/16 06:55:00 3.030 2025/09/16 06:50:00 2.980 2025/09/16 06:45:00 3.050 2025/09/16 06:40:00 2.960 2025/09/16 06:35:00 3.050 2025/09/16 06:30:00 2.990 2025/09/16 06:25:00 3.040 2025/09/16 06:20:00 3.030 2025/09/16 06:15:00 3.000 2025/09/16 06:10:00 3.030 2025/09/16 06:05:00 3.080 2025/09/16 06:00:00 3.040 2025/09/16 05:55:00 3.000 2025/09/16 05:50:00 3.030 2025/09/16 05:45:00 3.040 2025/09/16 05:40:00 3.030 2025/09/16 05:35:00 3.000 2025/09/16 05:30:00 2.950 2025/09/16 05:25:00 3.000 2025/09/16 05:20:00 3.040 2025/09/16 05:15:00 2.950 2025/09/16 05:10:00 2.980 2025/09/16 05:05:00 3.010 2025/09/16 05:00:00 3.050 2025/09/16 04:55:00 3.000 2025/09/16 04:50:00 3.010 2025/09/16 04:45:00 3.030 2025/09/16 04:40:00 3.000 2025/09/16 04:35:00 3.030 2025/09/16 04:30:00 3.030 2025/09/16 04:25:00 3.030 2025/09/16 04:20:00 2.990 2025/09/16 04:15:00 3.010 2025/09/16 04:10:00 3.030 2025/09/16 04:05:00 2.980 2025/09/16 04:00:00 3.030 2025/09/16 03:55:00 3.060 2025/09/16 03:50:00 3.010 2025/09/16 03:45:00 3.010 2025/09/16 03:40:00 2.980 2025/09/16 03:35:00 2.910 2025/09/16 03:30:00 2.910 2025/09/16 03:25:00 3.050 2025/09/16 03:20:00 3.040 2025/09/16 03:15:00 3.010 2025/09/16 03:10:00 2.990 2025/09/16 03:05:00 3.030 2025/09/16 03:00:00 3.050 2025/09/16 02:55:00 3.030 2025/09/16 02:50:00 3.030 2025/09/16 02:45:00 3.030 2025/09/16 02:40:00 2.990 2025/09/16 02:35:00 3.000 2025/09/16 02:30:00 3.010 2025/09/16 02:25:00 3.040 2025/09/16 02:20:00 3.040 2025/09/16 02:15:00 3.080 2025/09/16 02:10:00 3.000 2025/09/16 02:05:00 3.030 2025/09/16 02:00:00 3.030 2025/09/16 01:55:00 3.010 2025/09/16 01:50:00 3.010 2025/09/16 01:45:00 3.030 2025/09/16 01:40:00 3.040 2025/09/16 01:35:00 2.990 2025/09/16 01:30:00 3.030 2025/09/16 01:25:00 3.040 2025/09/16 01:20:00 3.060 2025/09/16 01:15:00 2.940 2025/09/16 01:10:00 3.000 2025/09/16 01:05:00 2.950 2025/09/16 01:00:00 2.960 2025/09/16 00:55:00 3.000 2025/09/16 00:50:00 3.010 2025/09/16 00:45:00 2.990 2025/09/16 00:40:00 3.010 2025/09/16 00:35:00 3.030 2025/09/16 00:30:00 3.040 2025/09/16 00:25:00 3.010 2025/09/16 00:20:00 3.030 2025/09/16 00:15:00 2.960 2025/09/16 00:10:00 3.010 2025/09/16 00:05:00 2.960 2025/09/16 00:00:00 3.030 2025/09/15 23:55:00 3.040 2025/09/15 23:50:00 3.030 2025/09/15 23:45:00 3.030 2025/09/15 23:40:00 2.960 2025/09/15 23:35:00 3.030 2025/09/15 23:30:00 3.010 2025/09/15 23:25:00 3.010 2025/09/15 23:20:00 2.990 2025/09/15 23:15:00 3.000 2025/09/15 23:10:00 3.010 2025/09/15 23:05:00 3.040 2025/09/15 23:00:00 3.040 2025/09/15 22:55:00 3.010 2025/09/15 22:50:00 3.010 2025/09/15 22:45:00 3.030 2025/09/15 22:40:00 3.040 2025/09/15 22:35:00 2.980 2025/09/15 22:30:00 3.000 2025/09/15 22:25:00 3.010 2025/09/15 22:20:00 3.010 2025/09/15 22:15:00 3.010 2025/09/15 22:10:00 3.030 2025/09/15 22:05:00 2.980 2025/09/15 22:00:00 3.060 2025/09/15 21:55:00 3.030 2025/09/15 21:50:00 3.030 2025/09/15 21:45:00 3.010 2025/09/15 21:40:00 3.030 2025/09/15 21:35:00 3.010 2025/09/15 21:30:00 3.000 2025/09/15 21:25:00 3.000 2025/09/15 21:20:00 3.050 2025/09/15 21:15:00 3.040 2025/09/15 21:10:00 2.990 2025/09/15 21:05:00 3.080 2025/09/15 21:00:00 3.050 2025/09/15 20:55:00 3.010 2025/09/15 20:50:00 3.000 2025/09/15 20:45:00 3.050 2025/09/15 20:40:00 3.040 2025/09/15 20:35:00 3.050 2025/09/15 20:30:00 3.060 2025/09/15 20:25:00 3.050 2025/09/15 20:20:00 3.030 2025/09/15 20:15:00 3.040 2025/09/15 20:10:00 3.050 2025/09/15 20:05:00 3.050 2025/09/15 20:00:00 3.030 2025/09/15 19:55:00 2.980 2025/09/15 19:50:00 3.030 2025/09/15 19:45:00 3.040 2025/09/15 19:40:00 3.040 2025/09/15 19:35:00 3.050 2025/09/15 19:30:00 3.080 2025/09/15 19:25:00 3.030 2025/09/15 19:20:00 3.050 2025/09/15 19:15:00 2.960 2025/09/15 19:10:00 3.030 2025/09/15 19:05:00 3.010 2025/09/15 19:00:00 3.010 2025/09/15 18:55:00 3.050 2025/09/15 18:50:00 3.010 2025/09/15 18:45:00 3.030 2025/09/15 18:40:00 3.060 2025/09/15 18:35:00 3.050 2025/09/15 18:30:00 3.030 2025/09/15 18:25:00 3.060 2025/09/15 18:20:00 3.040 2025/09/15 18:15:00 3.040 2025/09/15 18:10:00 3.060 2025/09/15 18:05:00 3.060 2025/09/15 18:00:00 3.000 2025/09/15 17:55:00 2.990 2025/09/15 17:50:00 3.060 2025/09/15 17:45:00 3.030 2025/09/15 17:40:00 3.050 2025/09/15 17:35:00 3.060 2025/09/15 17:30:00 3.050 2025/09/15 17:25:00 3.030 2025/09/15 17:20:00 3.060 2025/09/15 17:15:00 3.060 2025/09/15 17:10:00 3.050 2025/09/15 17:05:00 3.060 2025/09/15 17:00:00 3.010 2025/09/15 16:55:00 3.060 2025/09/15 16:50:00 3.030 2025/09/15 16:45:00 3.090 2025/09/15 16:40:00 3.080 2025/09/15 16:35:00 3.090 2025/09/15 16:30:00 3.080 2025/09/15 16:25:00 3.050 2025/09/15 16:20:00 3.080 2025/09/15 16:15:00 3.010 2025/09/15 16:10:00 3.010 2025/09/15 16:05:00 3.060 2025/09/15 16:00:00 3.090 2025/09/15 15:55:00 3.090 2025/09/15 15:50:00 3.080 2025/09/15 15:45:00 3.080 2025/09/15 15:40:00 3.030 2025/09/15 15:35:00 3.040 2025/09/15 15:30:00 3.080 2025/09/15 15:25:00 3.060 2025/09/15 15:20:00 3.080 2025/09/15 15:15:00 3.080 2025/09/15 15:10:00 3.100 2025/09/15 15:05:00 3.090 2025/09/15 15:00:00 3.100 2025/09/15 14:55:00 3.080 2025/09/15 14:50:00 3.100 2025/09/15 14:45:00 3.100 2025/09/15 14:40:00 3.050 2025/09/15 14:35:00 3.120 2025/09/15 14:30:00 3.090 2025/09/15 14:25:00 3.050 2025/09/15 14:20:00 3.100 2025/09/15 14:15:00 3.120 2025/09/15 14:10:00 3.060 2025/09/15 14:05:00 3.090 2025/09/15 14:00:00 3.060 2025/09/15 13:55:00 3.090 2025/09/15 13:50:00 3.090 2025/09/15 13:45:00 3.120 2025/09/15 13:40:00 3.090 2025/09/15 13:35:00 3.100 2025/09/15 13:30:00 3.100 2025/09/15 13:25:00 3.080 2025/09/15 13:20:00 3.100 2025/09/15 13:15:00 3.130 2025/09/15 13:10:00 3.080 2025/09/15 13:05:00 3.040 2025/09/15 13:00:00 3.100 2025/09/15 12:55:00 3.120 2025/09/15 12:50:00 3.060 2025/09/15 12:45:00 3.030 2025/09/15 12:40:00 3.090 2025/09/15 12:35:00 3.140 2025/09/15 12:30:00 3.080 2025/09/15 12:25:00 3.080 2025/09/15 12:20:00 3.170 2025/09/15 12:15:00 3.140 2025/09/15 12:10:00 3.090 2025/09/15 12:05:00 3.060 2025/09/15 12:00:00 3.100 2025/09/15 11:55:00 3.150 2025/09/15 11:50:00 3.120 2025/09/15 11:45:00 3.100 2025/09/15 11:40:00 3.100 2025/09/15 11:35:00 3.100 2025/09/15 11:30:00 3.150 2025/09/15 11:25:00 3.140 2025/09/15 11:20:00 3.120 2025/09/15 11:15:00 3.120 2025/09/15 11:10:00 3.090 2025/09/15 11:05:00 3.140 2025/09/15 11:00:00 3.120 2025/09/15 10:55:00 3.060 2025/09/15 10:50:00 3.090 2025/09/15 10:45:00 3.130 2025/09/15 10:40:00 3.170 2025/09/15 10:35:00 3.120 2025/09/15 10:30:00 3.150 2025/09/15 10:25:00 3.080 2025/09/15 10:20:00 3.060 2025/09/15 10:15:00 3.130 2025/09/15 10:10:00 3.130 2025/09/15 10:05:00 3.130 2025/09/15 10:00:00 3.120 2025/09/15 09:55:00 3.120 2025/09/15 09:50:00 3.140 2025/09/15 09:45:00 3.150 2025/09/15 09:40:00 3.100 2025/09/15 09:35:00 3.150 2025/09/15 09:30:00 3.120 2025/09/15 09:25:00 3.150 2025/09/15 09:20:00 3.130 2025/09/15 09:15:00 3.100 2025/09/15 09:10:00 3.120 2025/09/15 09:05:00 3.140 2025/09/15 09:00:00 3.040 2025/09/15 08:55:00 3.090 2025/09/15 08:50:00 3.180 2025/09/15 08:45:00 3.130 2025/09/15 08:40:00 3.090 2025/09/15 08:35:00 3.130 2025/09/15 08:30:00 3.170 2025/09/15 08:25:00 3.140 2025/09/15 08:20:00 3.150 2025/09/15 08:15:00 3.130 2025/09/15 08:10:00 3.170 2025/09/15 08:05:00 3.100 2025/09/15 08:00:00 3.150 2025/09/15 07:55:00 3.080 2025/09/15 07:50:00 3.170 2025/09/15 07:45:00 3.090 2025/09/15 07:40:00 3.120 2025/09/15 07:35:00 3.170 2025/09/15 07:30:00 3.140 2025/09/15 07:25:00 3.090 2025/09/15 07:20:00 3.100 2025/09/15 07:15:00 3.170 2025/09/15 07:10:00 3.100 2025/09/15 07:05:00 3.130 2025/09/15 07:00:00 3.150 2025/09/15 06:55:00 3.130 2025/09/15 06:50:00 3.140 2025/09/15 06:45:00 3.120 2025/09/15 06:40:00 3.130 2025/09/15 06:35:00 3.090 2025/09/15 06:30:00 3.150 2025/09/15 06:25:00 3.150 2025/09/15 06:20:00 3.150 2025/09/15 06:15:00 3.150 2025/09/15 06:10:00 3.130 2025/09/15 06:05:00 3.090 2025/09/15 06:00:00 3.060 2025/09/15 05:55:00 3.080 2025/09/15 05:50:00 3.060 2025/09/15 05:45:00 3.090 2025/09/15 05:40:00 3.130 2025/09/15 05:35:00 3.060 2025/09/15 05:30:00 3.130 2025/09/15 05:25:00 3.090 2025/09/15 05:20:00 3.140 2025/09/15 05:15:00 3.100 2025/09/15 05:10:00 3.080 2025/09/15 05:05:00 3.100 2025/09/15 05:00:00 3.050 2025/09/15 04:55:00 3.120 2025/09/15 04:50:00 3.180 2025/09/15 04:45:00 3.120 2025/09/15 04:40:00 3.090 2025/09/15 04:35:00 3.050 2025/09/15 04:30:00 3.080 2025/09/15 04:25:00 3.060 2025/09/15 04:20:00 3.090 2025/09/15 04:15:00 3.150 2025/09/15 04:10:00 3.180 2025/09/15 04:05:00 3.100 2025/09/15 04:00:00 3.150 2025/09/15 03:55:00 3.100 2025/09/15 03:50:00 3.100 2025/09/15 03:45:00 3.130 2025/09/15 03:40:00 3.100 2025/09/15 03:35:00 3.170 2025/09/15 03:30:00 3.150 2025/09/15 03:25:00 3.050 2025/09/15 03:20:00 3.130 2025/09/15 03:15:00 3.130 2025/09/15 03:10:00 3.130 2025/09/15 03:05:00 3.100 2025/09/15 03:00:00 3.120 2025/09/15 02:55:00 3.150 2025/09/15 02:50:00 3.120 2025/09/15 02:45:00 3.150 2025/09/15 02:40:00 3.100 2025/09/15 02:35:00 3.150 2025/09/15 02:30:00 3.120 2025/09/15 02:25:00 3.120 2025/09/15 02:20:00 3.100 2025/09/15 02:15:00 3.100 2025/09/15 02:10:00 3.150 2025/09/15 02:05:00 3.130 2025/09/15 02:00:00 3.100 2025/09/15 01:55:00 3.130 2025/09/15 01:50:00 3.100 2025/09/15 01:45:00 3.100 2025/09/15 01:40:00 3.120 2025/09/15 01:35:00 3.140 2025/09/15 01:30:00 3.130 2025/09/15 01:25:00 3.130 2025/09/15 01:20:00 3.050 2025/09/15 01:15:00 3.100 2025/09/15 01:10:00 3.120 2025/09/15 01:05:00 3.080 2025/09/15 01:00:00 3.030 2025/09/15 00:55:00 3.150 2025/09/15 00:50:00 3.130 2025/09/15 00:45:00 3.090 2025/09/15 00:40:00 3.100 2025/09/15 00:35:00 3.130 2025/09/15 00:30:00 3.120 2025/09/15 00:25:00 3.130 2025/09/15 00:20:00 3.080 2025/09/15 00:15:00 3.090 2025/09/15 00:10:00 3.090 2025/09/15 00:05:00 3.090 2025/09/15 00:00:00 3.140 2025/09/14 23:55:00 3.060 2025/09/14 23:50:00 3.140 2025/09/14 23:45:00 3.140 2025/09/14 23:40:00 3.090 2025/09/14 23:35:00 3.120 2025/09/14 23:30:00 3.130 2025/09/14 23:25:00 3.080 2025/09/14 23:20:00 3.100 2025/09/14 23:15:00 3.140 2025/09/14 23:10:00 3.090 2025/09/14 23:05:00 3.100 2025/09/14 23:00:00 3.100 2025/09/14 22:55:00 3.120 2025/09/14 22:50:00 3.130 2025/09/14 22:45:00 3.120 2025/09/14 22:40:00 3.130 2025/09/14 22:35:00 3.010 2025/09/14 22:30:00 3.130 2025/09/14 22:25:00 3.140 2025/09/14 22:20:00 3.130 2025/09/14 22:15:00 3.100 2025/09/14 22:10:00 3.140 2025/09/14 22:05:00 3.060 2025/09/14 22:00:00 3.150 2025/09/14 21:55:00 3.100 2025/09/14 21:50:00 3.080 2025/09/14 21:45:00 3.090 2025/09/14 21:40:00 3.130 2025/09/14 21:35:00 3.120 2025/09/14 21:30:00 3.030 2025/09/14 21:25:00 3.120 2025/09/14 21:20:00 3.060 2025/09/14 21:15:00 3.030 2025/09/14 21:10:00 3.100 2025/09/14 21:05:00 3.060 2025/09/14 21:00:00 3.100 2025/09/14 20:55:00 3.140 2025/09/14 20:50:00 3.040 2025/09/14 20:45:00 3.120 2025/09/14 20:40:00 3.100 2025/09/14 20:35:00 3.050 2025/09/14 20:30:00 3.080 2025/09/14 20:25:00 3.100 2025/09/14 20:20:00 3.130 2025/09/14 20:15:00 3.120 2025/09/14 20:10:00 3.010 2025/09/14 20:05:00 3.080 2025/09/14 20:00:00 3.090 2025/09/14 19:55:00 3.090 2025/09/14 19:50:00 3.130 2025/09/14 19:45:00 3.130 2025/09/14 19:40:00 3.060 2025/09/14 19:35:00 3.090 2025/09/14 19:30:00 3.050 2025/09/14 19:25:00 3.050 2025/09/14 19:20:00 3.100 2025/09/14 19:15:00 3.080 2025/09/14 19:10:00 3.120 2025/09/14 19:05:00 3.060 2025/09/14 19:00:00 3.090 2025/09/14 18:55:00 3.170 2025/09/14 18:50:00 3.060 2025/09/14 18:45:00 3.080 2025/09/14 18:40:00 3.100 2025/09/14 18:35:00 3.120 2025/09/14 18:30:00 3.090 2025/09/14 18:25:00 3.090 2025/09/14 18:20:00 3.100 2025/09/14 18:15:00 3.120 2025/09/14 18:10:00 3.050 2025/09/14 18:05:00 3.060 2025/09/14 18:00:00 3.100 2025/09/14 17:55:00 3.140 2025/09/14 17:50:00 3.090 2025/09/14 17:45:00 3.060 2025/09/14 17:40:00 3.130 2025/09/14 17:35:00 3.090 2025/09/14 17:30:00 3.090 2025/09/14 17:25:00 3.100 2025/09/14 17:20:00 3.120 2025/09/14 17:15:00 3.100 2025/09/14 17:10:00 3.060 2025/09/14 17:05:00 3.080 2025/09/14 17:00:00 3.080 2025/09/14 16:55:00 3.060 2025/09/14 16:50:00 3.100 2025/09/14 16:45:00 3.080 2025/09/14 16:40:00 3.090 2025/09/14 16:35:00 3.090 2025/09/14 16:30:00 3.090 2025/09/14 16:25:00 3.100 2025/09/14 16:20:00 3.080 2025/09/14 16:15:00 3.100 2025/09/14 16:10:00 3.040 2025/09/14 16:05:00 3.120 2025/09/14 16:00:00 3.080 2025/09/14 15:55:00 3.050 2025/09/14 15:50:00 3.090 2025/09/14 15:45:00 3.060 2025/09/14 15:40:00 3.060 2025/09/14 15:35:00 3.130 2025/09/14 15:30:00 3.100 2025/09/14 15:25:00 3.060 2025/09/14 15:20:00 3.050 2025/09/14 15:15:00 3.130 2025/09/14 15:10:00 3.130 2025/09/14 15:05:00 3.100 2025/09/14 15:00:00 3.030 2025/09/14 14:55:00 3.100 2025/09/14 14:50:00 3.080 2025/09/14 14:45:00 3.100 2025/09/14 14:40:00 3.120 2025/09/14 14:35:00 3.090 2025/09/14 14:30:00 3.050 2025/09/14 14:25:00 3.090 2025/09/14 14:20:00 3.050 2025/09/14 14:15:00 3.120 2025/09/14 14:10:00 3.090 2025/09/14 14:05:00 3.060 2025/09/14 14:00:00 3.140 2025/09/14 13:55:00 3.090 2025/09/14 13:50:00 3.100 2025/09/14 13:45:00 3.060 2025/09/14 13:40:00 3.100 2025/09/14 13:35:00 3.150 2025/09/14 13:30:00 3.090 2025/09/14 13:25:00 3.060 2025/09/14 13:20:00 3.060 2025/09/14 13:15:00 3.090 2025/09/14 13:10:00 3.040 2025/09/14 13:05:00 3.080 2025/09/14 13:00:00 3.050 2025/09/14 12:55:00 3.100 2025/09/14 12:50:00 3.040 2025/09/14 12:45:00 3.100 2025/09/14 12:40:00 3.090 2025/09/14 12:35:00 3.050 2025/09/14 12:30:00 3.100 2025/09/14 12:25:00 3.080 2025/09/14 12:20:00 3.140 2025/09/14 12:15:00 3.090 2025/09/14 12:10:00 3.080 2025/09/14 12:05:00 3.150 2025/09/14 12:00:00 3.140 2025/09/14 11:55:00 3.150 2025/09/14 11:50:00 3.140 2025/09/14 11:45:00 3.130 2025/09/14 11:40:00 3.130 2025/09/14 11:35:00 3.140 2025/09/14 11:30:00 3.120 2025/09/14 11:25:00 3.120 2025/09/14 11:20:00 3.100 2025/09/14 11:15:00 3.130 2025/09/14 11:10:00 3.100 2025/09/14 11:05:00 3.150 2025/09/14 11:00:00 3.100 2025/09/14 10:55:00 3.130 2025/09/14 10:50:00 3.150 2025/09/14 10:45:00 3.100 2025/09/14 10:40:00 3.080 2025/09/14 10:35:00 3.190 2025/09/14 10:30:00 3.170 2025/09/14 10:25:00 3.130 2025/09/14 10:20:00 3.100 2025/09/14 10:15:00 3.120 2025/09/14 10:10:00 3.060 2025/09/14 10:05:00 3.120 2025/09/14 10:00:00 3.120 2025/09/14 09:55:00 3.130 2025/09/14 09:50:00 3.120 2025/09/14 09:45:00 3.130 2025/09/14 09:40:00 3.150 2025/09/14 09:35:00 3.130 2025/09/14 09:30:00 3.150 2025/09/14 09:25:00 3.170 2025/09/14 09:20:00 3.100 2025/09/14 09:15:00 3.170 2025/09/14 09:10:00 3.140 2025/09/14 09:05:00 3.120 2025/09/14 09:00:00 3.120 2025/09/14 08:55:00 3.130 2025/09/14 08:50:00 3.130 2025/09/14 08:45:00 3.150 2025/09/14 08:40:00 3.050 2025/09/14 08:35:00 3.100 2025/09/14 08:30:00 3.100 2025/09/14 08:25:00 3.170 2025/09/14 08:20:00 3.130 2025/09/14 08:15:00 3.050 2025/09/14 08:10:00 3.150 2025/09/14 08:05:00 3.130 2025/09/14 08:00:00 3.170 2025/09/14 07:55:00 3.140 2025/09/14 07:50:00 3.120 2025/09/14 07:45:00 3.140 2025/09/14 07:40:00 3.150 2025/09/14 07:35:00 3.130 2025/09/14 07:30:00 3.130 2025/09/14 07:25:00 3.150 2025/09/14 07:20:00 3.140 2025/09/14 07:15:00 3.120 2025/09/14 07:10:00 3.130 2025/09/14 07:05:00 3.040 2025/09/14 07:00:00 3.090 2025/09/14 06:55:00 3.120 2025/09/14 06:50:00 3.120 2025/09/14 06:45:00 3.140 2025/09/14 06:40:00 3.140 2025/09/14 06:35:00 3.090 2025/09/14 06:30:00 3.120 2025/09/14 06:25:00 3.150 2025/09/14 06:20:00 3.130 2025/09/14 06:15:00 3.120 2025/09/14 06:10:00 3.060 2025/09/14 06:05:00 3.120 2025/09/14 06:00:00 3.130 2025/09/14 05:55:00 3.130 2025/09/14 05:50:00 3.170 2025/09/14 05:45:00 3.120 2025/09/14 05:40:00 3.120 2025/09/14 05:35:00 3.100 2025/09/14 05:30:00 3.090 2025/09/14 05:25:00 3.040 2025/09/14 05:20:00 3.100 2025/09/14 05:15:00 3.140 2025/09/14 05:10:00 3.120 2025/09/14 05:05:00 3.100 2025/09/14 05:00:00 3.100 2025/09/14 04:55:00 3.150 2025/09/14 04:50:00 3.090 2025/09/14 04:45:00 3.120 2025/09/14 04:40:00 3.130 2025/09/14 04:35:00 3.080 2025/09/14 04:30:00 3.090 2025/09/14 04:25:00 3.120 2025/09/14 04:20:00 3.120 2025/09/14 04:15:00 3.090 2025/09/14 04:10:00 3.090 2025/09/14 04:05:00 3.100 2025/09/14 04:00:00 3.120 2025/09/14 03:55:00 3.060 2025/09/14 03:50:00 3.130 2025/09/14 03:45:00 3.120 2025/09/14 03:40:00 3.130 2025/09/14 03:35:00 3.100 2025/09/14 03:30:00 3.060 2025/09/14 03:25:00 3.100 2025/09/14 03:20:00 3.140 2025/09/14 03:15:00 3.060 2025/09/14 03:10:00 3.130 2025/09/14 03:05:00 3.050 2025/09/14 03:00:00 3.100 2025/09/14 02:55:00 3.090 2025/09/14 02:50:00 3.120 2025/09/14 02:45:00 3.050 2025/09/14 02:40:00 3.080 2025/09/14 02:35:00 3.120 2025/09/14 02:30:00 3.080 2025/09/14 02:25:00 3.100 2025/09/14 02:20:00 3.090 2025/09/14 02:15:00 3.060 2025/09/14 02:10:00 3.040 2025/09/14 02:05:00 3.050 2025/09/14 02:00:00 3.030 2025/09/14 01:55:00 3.080 2025/09/14 01:50:00 3.120 2025/09/14 01:45:00 3.100 2025/09/14 01:40:00 3.080 2025/09/14 01:35:00 3.040 2025/09/14 01:30:00 3.080 2025/09/14 01:25:00 3.090 2025/09/14 01:20:00 3.130 2025/09/14 01:15:00 3.120 2025/09/14 01:10:00 3.050 2025/09/14 01:05:00 3.060 2025/09/14 01:00:00 3.060 2025/09/14 00:55:00 3.000 2025/09/14 00:50:00 3.080 2025/09/14 00:45:00 3.100 2025/09/14 00:40:00 3.090 2025/09/14 00:35:00 3.090 2025/09/14 00:30:00 3.040 2025/09/14 00:25:00 3.100 2025/09/14 00:20:00 3.090 2025/09/14 00:15:00 3.090 2025/09/14 00:10:00 3.030 2025/09/14 00:05:00 3.080 2025/09/14 00:00:00 3.090 2025/09/13 23:55:00 3.080 2025/09/13 23:50:00 3.100 2025/09/13 23:45:00 3.080 2025/09/13 23:40:00 3.050 2025/09/13 23:35:00 3.080 2025/09/13 23:30:00 3.100 2025/09/13 23:25:00 3.120 2025/09/13 23:20:00 3.080 2025/09/13 23:15:00 3.010 2025/09/13 23:10:00 3.080 2025/09/13 23:05:00 3.130 2025/09/13 23:00:00 3.120 2025/09/13 22:55:00 3.090 2025/09/13 22:50:00 3.100 2025/09/13 22:45:00 3.050 2025/09/13 22:40:00 3.080 2025/09/13 22:35:00 3.080 2025/09/13 22:30:00 3.130 2025/09/13 22:25:00 3.040 2025/09/13 22:20:00 3.080 2025/09/13 22:15:00 3.100 2025/09/13 22:10:00 3.050 2025/09/13 22:05:00 3.120 2025/09/13 22:00:00 3.090 2025/09/13 21:55:00 3.040 2025/09/13 21:50:00 3.090 2025/09/13 21:45:00 3.090 2025/09/13 21:40:00 3.050 2025/09/13 21:35:00 3.100 2025/09/13 21:30:00 3.090 2025/09/13 21:25:00 3.100 2025/09/13 21:20:00 3.080 2025/09/13 21:15:00 3.100 2025/09/13 21:10:00 3.080 2025/09/13 21:05:00 3.080 2025/09/13 21:00:00 3.060 2025/09/13 20:55:00 3.100 2025/09/13 20:50:00 3.060 2025/09/13 20:45:00 3.030 2025/09/13 20:40:00 3.050 2025/09/13 20:35:00 3.060 2025/09/13 20:30:00 3.080 2025/09/13 20:25:00 3.030 2025/09/13 20:20:00 3.080 2025/09/13 20:15:00 3.090 2025/09/13 20:10:00 3.130 2025/09/13 20:05:00 3.090 2025/09/13 20:00:00 3.060 2025/09/13 19:55:00 3.080 2025/09/13 19:50:00 3.120 2025/09/13 19:45:00 3.060 2025/09/13 19:40:00 3.050 2025/09/13 19:35:00 3.090 2025/09/13 19:30:00 3.090 2025/09/13 19:25:00 3.090 2025/09/13 19:20:00 3.090 2025/09/13 19:15:00 3.050 2025/09/13 19:10:00 3.090 2025/09/13 19:05:00 3.050 2025/09/13 19:00:00 3.120 2025/09/13 18:55:00 3.100 2025/09/13 18:50:00 3.080 2025/09/13 18:45:00 3.090 2025/09/13 18:40:00 3.080 2025/09/13 18:35:00 3.050 2025/09/13 18:30:00 3.100 2025/09/13 18:25:00 3.120 2025/09/13 18:20:00 3.130 2025/09/13 18:15:00 3.120 2025/09/13 18:10:00 3.120 2025/09/13 18:05:00 3.100 2025/09/13 18:00:00 3.060 2025/09/13 17:55:00 3.120 2025/09/13 17:50:00 3.130 2025/09/13 17:45:00 3.090 2025/09/13 17:40:00 3.130 2025/09/13 17:35:00 3.100 2025/09/13 17:30:00 3.050 2025/09/13 17:25:00 3.120 2025/09/13 17:20:00 3.130 2025/09/13 17:15:00 3.080 2025/09/13 17:10:00 3.120 2025/09/13 17:05:00 3.130 2025/09/13 17:00:00 3.120 2025/09/13 16:55:00 3.120 2025/09/13 16:50:00 3.140 2025/09/13 16:45:00 3.090 2025/09/13 16:40:00 3.120 2025/09/13 16:35:00 3.080 2025/09/13 16:30:00 3.130 2025/09/13 16:25:00 3.080 2025/09/13 16:20:00 3.100 2025/09/13 16:15:00 3.140 2025/09/13 16:10:00 3.100 2025/09/13 16:05:00 3.150 2025/09/13 16:00:00 3.050 2025/09/13 15:55:00 3.100 2025/09/13 15:50:00 3.090 2025/09/13 15:45:00 3.140 2025/09/13 15:40:00 3.060 2025/09/13 15:35:00 3.140 2025/09/13 15:30:00 3.050 2025/09/13 15:25:00 3.120 2025/09/13 15:20:00 3.100 2025/09/13 15:15:00 3.140 2025/09/13 15:10:00 3.100 2025/09/13 15:05:00 3.140 2025/09/13 15:00:00 3.120 2025/09/13 14:55:00 3.170 2025/09/13 14:50:00 3.100 2025/09/13 14:45:00 3.150 2025/09/13 14:40:00 3.120 2025/09/13 14:35:00 3.150 2025/09/13 14:30:00 3.170 2025/09/13 14:25:00 3.150 2025/09/13 14:20:00 3.090 2025/09/13 14:15:00 3.130 2025/09/13 14:10:00 3.140 2025/09/13 14:05:00 3.080 2025/09/13 14:00:00 3.140 2025/09/13 13:55:00 3.150 2025/09/13 13:50:00 3.130 2025/09/13 13:45:00 3.130 2025/09/13 13:40:00 3.130 2025/09/13 13:35:00 3.150 2025/09/13 13:30:00 3.030 2025/09/13 13:25:00 3.140 2025/09/13 13:20:00 3.030 2025/09/13 13:15:00 3.150 2025/09/13 13:10:00 3.170 2025/09/13 13:05:00 3.150 2025/09/13 13:00:00 3.140 2025/09/13 12:55:00 3.180 2025/09/13 12:50:00 3.170 2025/09/13 12:45:00 3.170 2025/09/13 12:40:00 3.140 2025/09/13 12:35:00 3.210 2025/09/13 12:30:00 3.180 2025/09/13 12:25:00 3.170 2025/09/13 12:20:00 3.130 2025/09/13 12:15:00 3.150 2025/09/13 12:10:00 3.210 2025/09/13 12:05:00 3.130 2025/09/13 12:00:00 3.140 2025/09/13 11:55:00 3.170 2025/09/13 11:50:00 3.090 2025/09/13 11:45:00 3.170 2025/09/13 11:40:00 3.140 2025/09/13 11:35:00 3.150 2025/09/13 11:30:00 3.170 2025/09/13 11:25:00 3.180 2025/09/13 11:20:00 3.140 2025/09/13 11:15:00 3.140 2025/09/13 11:10:00 3.100 2025/09/13 11:05:00 3.130 2025/09/13 11:00:00 3.220 2025/09/13 10:55:00 3.140 2025/09/13 10:50:00 3.120 2025/09/13 10:45:00 3.170 2025/09/13 10:40:00 3.130 2025/09/13 10:35:00 3.190 2025/09/13 10:30:00 3.140 2025/09/13 10:25:00 3.130 2025/09/13 10:20:00 3.140 2025/09/13 10:15:00 3.130 2025/09/13 10:10:00 3.170 2025/09/13 10:05:00 3.100 2025/09/13 10:00:00 3.190 2025/09/13 09:55:00 3.120 2025/09/13 09:50:00 3.140 2025/09/13 09:45:00 3.130 2025/09/13 09:40:00 3.120 2025/09/13 09:35:00 3.140 2025/09/13 09:30:00 3.150 2025/09/13 09:25:00 3.150 2025/09/13 09:20:00 3.190 2025/09/13 09:15:00 3.100 2025/09/13 09:10:00 3.130 2025/09/13 09:05:00 3.190 2025/09/13 09:00:00 3.150 2025/09/13 08:55:00 3.140 2025/09/13 08:50:00 3.180 2025/09/13 08:45:00 3.120 2025/09/13 08:40:00 3.170 2025/09/13 08:35:00 3.050 2025/09/13 08:30:00 3.180 2025/09/13 08:25:00 3.150 2025/09/13 08:20:00 3.150 2025/09/13 08:15:00 3.100 2025/09/13 08:10:00 3.140 2025/09/13 08:05:00 3.130 2025/09/13 08:00:00 3.180 2025/09/13 07:55:00 3.090 2025/09/13 07:50:00 3.050 2025/09/13 07:45:00 3.120 2025/09/13 07:40:00 3.150 2025/09/13 07:35:00 3.120 2025/09/13 07:30:00 3.170 2025/09/13 07:25:00 3.130 2025/09/13 07:20:00 3.130 2025/09/13 07:15:00 3.100 2025/09/13 07:10:00 3.120 2025/09/13 07:05:00 3.130 2025/09/13 07:00:00 3.130 2025/09/13 06:55:00 3.100 2025/09/13 06:50:00 3.180 2025/09/13 06:45:00 3.130 2025/09/13 06:40:00 3.130 2025/09/13 06:35:00 3.120 2025/09/13 06:30:00 3.140 2025/09/13 06:25:00 3.130 2025/09/13 06:20:00 3.150 2025/09/13 06:15:00 3.120 2025/09/13 06:10:00 3.090 2025/09/13 06:05:00 3.060 2025/09/13 06:00:00 3.120 2025/09/13 05:55:00 3.130 2025/09/13 05:50:00 3.090 2025/09/13 05:45:00 3.150 2025/09/13 05:40:00 3.120 2025/09/13 05:35:00 3.120 2025/09/13 05:30:00 3.150 2025/09/13 05:25:00 3.050 2025/09/13 05:20:00 3.100 2025/09/13 05:15:00 3.140 2025/09/13 05:10:00 3.150 2025/09/13 05:05:00 3.090 2025/09/13 05:00:00 3.130 2025/09/13 04:55:00 3.100 2025/09/13 04:50:00 3.120 2025/09/13 04:45:00 3.100 2025/09/13 04:40:00 3.120 2025/09/13 04:35:00 3.100 2025/09/13 04:30:00 3.130 2025/09/13 04:25:00 3.080 2025/09/13 04:20:00 3.130 2025/09/13 04:15:00 3.130 2025/09/13 04:10:00 3.140 2025/09/13 04:05:00 3.090 2025/09/13 04:00:00 3.120 2025/09/13 03:55:00 3.120 2025/09/13 03:50:00 3.030 2025/09/13 03:45:00 3.080 2025/09/13 03:40:00 3.120 2025/09/13 03:35:00 3.130 2025/09/13 03:30:00 3.090 2025/09/13 03:25:00 3.120 2025/09/13 03:20:00 3.140 2025/09/13 03:15:00 3.050 2025/09/13 03:10:00 3.150 2025/09/13 03:05:00 3.050 2025/09/13 03:00:00 3.120 2025/09/13 02:55:00 3.060 2025/09/13 02:50:00 3.090 2025/09/13 02:45:00 3.060 2025/09/13 02:40:00 3.130 2025/09/13 02:35:00 3.040 2025/09/13 02:30:00 3.130 2025/09/13 02:25:00 3.100 2025/09/13 02:20:00 3.120 2025/09/13 02:15:00 3.100 2025/09/13 02:10:00 3.150 2025/09/13 02:05:00 3.100 2025/09/13 02:00:00 3.080 2025/09/13 01:55:00 3.100 2025/09/13 01:50:00 3.120 2025/09/13 01:45:00 3.130 2025/09/13 01:40:00 3.080 2025/09/13 01:35:00 3.040 2025/09/13 01:30:00 3.090 2025/09/13 01:25:00 3.080 2025/09/13 01:20:00 3.090 2025/09/13 01:15:00 3.090 2025/09/13 01:10:00 3.080 2025/09/13 01:05:00 3.090 2025/09/13 01:00:00 3.130 2025/09/13 00:55:00 3.060 2025/09/13 00:50:00 3.120 2025/09/13 00:45:00 3.100 2025/09/13 00:40:00 3.100 2025/09/13 00:35:00 3.120 2025/09/13 00:30:00 3.080 2025/09/13 00:25:00 3.090 2025/09/13 00:20:00 3.080 2025/09/13 00:15:00 3.080 2025/09/13 00:10:00 3.040 2025/09/13 00:05:00 3.080 2025/09/13 00:00:00 3.100 2025/09/12 23:55:00 3.090 2025/09/12 23:50:00 3.050 2025/09/12 23:45:00 3.100 2025/09/12 23:40:00 3.130 2025/09/12 23:35:00 3.090 2025/09/12 23:30:00 3.120 2025/09/12 23:25:00 3.040 2025/09/12 23:20:00 3.090 2025/09/12 23:15:00 3.100 2025/09/12 23:10:00 3.130 2025/09/12 23:05:00 3.100 2025/09/12 23:00:00 3.130 2025/09/12 22:55:00 3.050 2025/09/12 22:50:00 3.090 2025/09/12 22:45:00 3.100 2025/09/12 22:40:00 3.090 2025/09/12 22:35:00 3.140 2025/09/12 22:30:00 3.090 2025/09/12 22:25:00 3.120 2025/09/12 22:20:00 3.030 2025/09/12 22:15:00 3.080 2025/09/12 22:10:00 3.050 2025/09/12 22:05:00 3.120 2025/09/12 22:00:00 3.120 2025/09/12 21:55:00 3.130 2025/09/12 21:50:00 3.090 2025/09/12 21:45:00 3.050 2025/09/12 21:40:00 3.120 2025/09/12 21:35:00 3.090 2025/09/12 21:30:00 3.080 2025/09/12 21:25:00 3.090 2025/09/12 21:20:00 3.050 2025/09/12 21:15:00 3.130 2025/09/12 21:10:00 3.080 2025/09/12 21:05:00 3.090 2025/09/12 21:00:00 3.060 2025/09/12 20:55:00 3.100 2025/09/12 20:50:00 3.050 2025/09/12 20:45:00 3.100 2025/09/12 20:40:00 3.090 2025/09/12 20:35:00 3.100 2025/09/12 20:30:00 3.120 2025/09/12 20:25:00 3.100 2025/09/12 20:20:00 3.080 2025/09/12 20:15:00 3.080 2025/09/12 20:10:00 3.100 2025/09/12 20:05:00 3.170 2025/09/12 20:00:00 3.090 2025/09/12 19:55:00 3.100 2025/09/12 19:50:00 3.120 2025/09/12 19:45:00 3.170 2025/09/12 19:40:00 3.130 2025/09/12 19:35:00 3.100 2025/09/12 19:30:00 3.120 2025/09/12 19:25:00 3.120 2025/09/12 19:20:00 3.100 2025/09/12 19:15:00 3.100 2025/09/12 19:10:00 3.130 2025/09/12 19:05:00 3.120 2025/09/12 19:00:00 3.120 2025/09/12 18:55:00 3.090 2025/09/12 18:50:00 3.150 2025/09/12 18:45:00 3.120 2025/09/12 18:40:00 3.150 2025/09/12 18:35:00 3.140 2025/09/12 18:30:00 3.120 2025/09/12 18:25:00 3.080 2025/09/12 18:20:00 3.140 2025/09/12 18:15:00 3.150 2025/09/12 18:10:00 3.120 2025/09/12 18:05:00 3.130 2025/09/12 18:00:00 3.130 2025/09/12 17:55:00 3.090 2025/09/12 17:50:00 3.080 2025/09/12 17:45:00 3.080 2025/09/12 17:40:00 3.120 2025/09/12 17:35:00 3.100 2025/09/12 17:30:00 3.150 2025/09/12 17:25:00 3.100 2025/09/12 17:20:00 3.120 2025/09/12 17:15:00 3.090 2025/09/12 17:10:00 3.150 2025/09/12 17:05:00 3.100 2025/09/12 17:00:00 3.140 2025/09/12 16:55:00 3.100 2025/09/12 16:50:00 3.140 2025/09/12 16:45:00 3.150 2025/09/12 16:40:00 3.170 2025/09/12 16:35:00 3.080 2025/09/12 16:30:00 3.140 2025/09/12 16:25:00 3.170 2025/09/12 16:20:00 3.140 2025/09/12 16:15:00 3.150 2025/09/12 16:10:00 3.100 2025/09/12 16:05:00 3.140 2025/09/12 16:00:00 3.150 2025/09/12 15:55:00 3.170 2025/09/12 15:50:00 3.150 2025/09/12 15:45:00 3.150 2025/09/12 15:40:00 3.120 2025/09/12 15:35:00 3.170 2025/09/12 15:30:00 3.090 2025/09/12 15:25:00 3.190 2025/09/12 15:20:00 3.190 2025/09/12 15:15:00 3.180 2025/09/12 15:10:00 3.150 2025/09/12 15:05:00 3.170 2025/09/12 15:00:00 3.190 2025/09/12 14:55:00 3.190 2025/09/12 14:50:00 3.170 2025/09/12 14:45:00 3.140 2025/09/12 14:40:00 3.180 2025/09/12 14:35:00 3.150 2025/09/12 14:30:00 3.180 2025/09/12 14:25:00 3.140 2025/09/12 14:20:00 3.180 2025/09/12 14:15:00 3.140 2025/09/12 14:10:00 3.140 2025/09/12 14:05:00 3.170 2025/09/12 14:00:00 3.190 2025/09/12 13:55:00 3.180 2025/09/12 13:50:00 3.180 2025/09/12 13:45:00 3.170 2025/09/12 13:40:00 3.190 2025/09/12 13:35:00 3.220 2025/09/12 13:30:00 3.190 2025/09/12 13:25:00 3.190 2025/09/12 13:20:00 3.210 2025/09/12 13:15:00 3.170 2025/09/12 13:10:00 3.180 2025/09/12 13:05:00 3.170 2025/09/12 13:00:00 3.150 2025/09/12 12:55:00 3.210 2025/09/12 12:50:00 3.220 2025/09/12 12:45:00 3.180 2025/09/12 12:40:00 3.130 2025/09/12 12:35:00 3.140 2025/09/12 12:30:00 3.220 2025/09/12 12:25:00 3.220 2025/09/12 12:20:00 3.180 2025/09/12 12:15:00 3.210 2025/09/12 12:10:00 3.170 2025/09/12 12:05:00 3.150 2025/09/12 12:00:00 3.220 2025/09/12 11:55:00 3.180 2025/09/12 11:50:00 3.170 2025/09/12 11:45:00 3.210 2025/09/12 11:40:00 3.180 2025/09/12 11:35:00 3.220 2025/09/12 11:30:00 3.170 2025/09/12 11:25:00 3.180 2025/09/12 11:20:00 3.210 2025/09/12 11:15:00 3.250 2025/09/12 11:10:00 3.180 2025/09/12 11:05:00 3.210 2025/09/12 11:00:00 3.220 2025/09/12 10:55:00 3.150 2025/09/12 10:50:00 3.190 2025/09/12 10:45:00 3.190 2025/09/12 10:40:00 3.170 2025/09/12 10:35:00 3.180 2025/09/12 10:30:00 3.210 2025/09/12 10:25:00 3.190 2025/09/12 10:20:00 3.220 2025/09/12 10:15:00 3.180 2025/09/12 10:10:00 3.190 2025/09/12 10:05:00 3.140 2025/09/12 10:00:00 3.230 2025/09/12 09:55:00 3.210 2025/09/12 09:50:00 3.210 2025/09/12 09:45:00 3.210 2025/09/12 09:40:00 3.190 2025/09/12 09:35:00 3.190 2025/09/12 09:30:00 3.220 2025/09/12 09:25:00 3.220 2025/09/12 09:20:00 3.220 2025/09/12 09:15:00 3.170 2025/09/12 09:10:00 3.210 2025/09/12 09:05:00 3.210 2025/09/12 09:00:00 3.190 2025/09/12 08:55:00 3.230 2025/09/12 08:50:00 3.250 2025/09/12 08:45:00 3.230 2025/09/12 08:40:00 3.250 2025/09/12 08:35:00 3.210 2025/09/12 08:30:00 3.220 2025/09/12 08:25:00 3.220 2025/09/12 08:20:00 3.210 2025/09/12 08:15:00 3.210 2025/09/12 08:10:00 3.180 2025/09/12 08:05:00 3.230 2025/09/12 08:00:00 3.220 2025/09/12 07:55:00 3.150 2025/09/12 07:50:00 3.190 2025/09/12 07:45:00 3.180 2025/09/12 07:40:00 3.140 2025/09/12 07:35:00 3.190 2025/09/12 07:30:00 3.230 2025/09/12 07:25:00 3.190 2025/09/12 07:20:00 3.170 2025/09/12 07:15:00 3.230 2025/09/12 07:10:00 3.250 2025/09/12 07:05:00 3.220 2025/09/12 07:00:00 3.230 2025/09/12 06:55:00 3.220 2025/09/12 06:50:00 3.130 2025/09/12 06:45:00 3.220 2025/09/12 06:40:00 3.230 2025/09/12 06:35:00 3.230 2025/09/12 06:30:00 3.210 2025/09/12 06:25:00 3.190 2025/09/12 06:20:00 3.150 2025/09/12 06:15:00 3.210 2025/09/12 06:10:00 3.220 2025/09/12 06:05:00 3.220 2025/09/12 06:00:00 3.130 2025/09/12 05:55:00 3.170 2025/09/12 05:50:00 3.210 2025/09/12 05:45:00 3.150 2025/09/12 05:40:00 3.180 2025/09/12 05:35:00 3.250 2025/09/12 05:30:00 3.180 2025/09/12 05:25:00 3.210 2025/09/12 05:20:00 3.210 2025/09/12 05:15:00 3.170 2025/09/12 05:10:00 3.170 2025/09/12 05:05:00 3.230 2025/09/12 05:00:00 3.180 2025/09/12 04:55:00 3.230 2025/09/12 04:50:00 3.210 2025/09/12 04:45:00 3.210 2025/09/12 04:40:00 3.210 2025/09/12 04:35:00 3.120 2025/09/12 04:30:00 3.210 2025/09/12 04:25:00 3.150 2025/09/12 04:20:00 3.180 2025/09/12 04:15:00 3.150 2025/09/12 04:10:00 3.180 2025/09/12 04:05:00 3.170 2025/09/12 04:00:00 3.190 2025/09/12 03:55:00 3.120 2025/09/12 03:50:00 3.230 2025/09/12 03:45:00 3.190 2025/09/12 03:40:00 3.220 2025/09/12 03:35:00 3.170 2025/09/12 03:30:00 3.130 2025/09/12 03:25:00 3.190 2025/09/12 03:20:00 3.170 2025/09/12 03:15:00 3.150 2025/09/12 03:10:00 3.180 2025/09/12 03:05:00 3.170 2025/09/12 03:00:00 3.180 2025/09/12 02:55:00 3.150 2025/09/12 02:50:00 3.210 2025/09/12 02:45:00 3.170 2025/09/12 02:40:00 3.180 2025/09/12 02:35:00 3.150 2025/09/12 02:30:00 3.180 2025/09/12 02:25:00 3.150 2025/09/12 02:20:00 3.190 2025/09/12 02:15:00 3.190 2025/09/12 02:10:00 3.130 2025/09/12 02:05:00 3.150 2025/09/12 02:00:00 3.230 2025/09/12 01:55:00 3.170 2025/09/12 01:50:00 3.170 2025/09/12 01:45:00 3.180 2025/09/12 01:40:00 3.170 2025/09/12 01:35:00 3.190 2025/09/12 01:30:00 3.210 2025/09/12 01:25:00 3.220 2025/09/12 01:20:00 3.190 2025/09/12 01:15:00 3.150 2025/09/12 01:10:00 3.190 2025/09/12 01:05:00 3.130 2025/09/12 01:00:00 3.170 2025/09/12 00:55:00 3.120 2025/09/12 00:50:00 3.210 2025/09/12 00:45:00 3.150 2025/09/12 00:40:00 3.170 2025/09/12 00:35:00 3.170 2025/09/12 00:30:00 3.190 2025/09/12 00:25:00 3.170 2025/09/12 00:20:00 3.120 2025/09/12 00:15:00 3.140 2025/09/12 00:10:00 3.140 2025/09/12 00:05:00 3.170 2025/09/12 00:00:00 3.180 2025/09/11 23:55:00 3.140 2025/09/11 23:50:00 3.180 2025/09/11 23:45:00 3.120 2025/09/11 23:40:00 3.170 2025/09/11 23:35:00 3.210 2025/09/11 23:30:00 3.190 2025/09/11 23:25:00 3.220 2025/09/11 23:20:00 3.210 2025/09/11 23:15:00 3.140 2025/09/11 23:10:00 3.190 2025/09/11 23:05:00 3.120 2025/09/11 23:00:00 3.120 2025/09/11 22:55:00 3.190 2025/09/11 22:50:00 3.170 2025/09/11 22:45:00 3.170 2025/09/11 22:40:00 3.120 2025/09/11 22:35:00 3.170 2025/09/11 22:30:00 3.170 2025/09/11 22:25:00 3.150 2025/09/11 22:20:00 3.150 2025/09/11 22:15:00 3.140 2025/09/11 22:10:00 3.180 2025/09/11 22:05:00 3.170 2025/09/11 22:00:00 3.190 2025/09/11 21:55:00 3.180 2025/09/11 21:50:00 3.120 2025/09/11 21:45:00 3.140 2025/09/11 21:40:00 3.210 2025/09/11 21:35:00 3.150 2025/09/11 21:30:00 3.140 2025/09/11 21:25:00 3.190 2025/09/11 21:20:00 3.220 2025/09/11 21:15:00 3.210 2025/09/11 21:10:00 3.190 2025/09/11 21:05:00 3.210 2025/09/11 21:00:00 3.180 2025/09/11 20:55:00 3.210 2025/09/11 20:50:00 3.210 2025/09/11 20:45:00 3.140 2025/09/11 20:40:00 3.130 2025/09/11 20:35:00 3.170 2025/09/11 20:30:00 3.210 2025/09/11 20:25:00 3.170 2025/09/11 20:20:00 3.180 2025/09/11 20:15:00 3.190 2025/09/11 20:10:00 3.210 2025/09/11 20:05:00 3.130 2025/09/11 20:00:00 3.210 2025/09/11 19:55:00 3.180 2025/09/11 19:50:00 3.210 2025/09/11 19:45:00 3.100 2025/09/11 19:40:00 3.170 2025/09/11 19:35:00 3.210 2025/09/11 19:30:00 3.220 2025/09/11 19:25:00 3.180 2025/09/11 19:20:00 3.190 2025/09/11 19:15:00 3.190 2025/09/11 19:10:00 3.220 2025/09/11 19:05:00 3.190 2025/09/11 19:00:00 3.220 2025/09/11 18:55:00 3.210 2025/09/11 18:50:00 3.220 2025/09/11 18:45:00 3.220 2025/09/11 18:40:00 3.220 2025/09/11 18:35:00 3.180 2025/09/11 18:30:00 3.220 2025/09/11 18:25:00 3.170 2025/09/11 18:20:00 3.150 2025/09/11 18:15:00 3.140 2025/09/11 18:10:00 3.220 2025/09/11 18:05:00 3.180 2025/09/11 18:00:00 3.220 2025/09/11 17:55:00 3.210 2025/09/11 17:50:00 3.180 2025/09/11 17:45:00 3.220 2025/09/11 17:40:00 3.190 2025/09/11 17:35:00 3.190 2025/09/11 17:30:00 3.210 2025/09/11 17:25:00 3.230 2025/09/11 17:20:00 3.250 2025/09/11 17:15:00 3.150 2025/09/11 17:10:00 3.230 2025/09/11 17:05:00 3.230 2025/09/11 17:00:00 3.170 2025/09/11 16:55:00 3.260 2025/09/11 16:50:00 3.250 2025/09/11 16:45:00 3.270 2025/09/11 16:40:00 3.190 2025/09/11 16:35:00 3.220 2025/09/11 16:30:00 3.250 2025/09/11 16:25:00 3.270 2025/09/11 16:20:00 3.250 2025/09/11 16:15:00 3.250 2025/09/11 16:10:00 3.220 2025/09/11 16:05:00 3.250 2025/09/11 16:00:00 3.220 2025/09/11 15:55:00 3.260 2025/09/11 15:50:00 3.230 2025/09/11 15:45:00 3.270 2025/09/11 15:40:00 3.230 2025/09/11 15:35:00 3.220 2025/09/11 15:30:00 3.250 2025/09/11 15:25:00 3.260 2025/09/11 15:20:00 3.250 2025/09/11 15:15:00 3.190 2025/09/11 15:10:00 3.230 2025/09/11 15:05:00 3.230 2025/09/11 15:00:00 3.260 2025/09/11 14:55:00 3.270 2025/09/11 14:50:00 3.250 2025/09/11 14:45:00 3.270 2025/09/11 14:40:00 3.260 2025/09/11 14:35:00 3.190 2025/09/11 14:30:00 3.250 2025/09/11 14:25:00 3.270 2025/09/11 14:20:00 3.260 2025/09/11 14:15:00 3.250 2025/09/11 14:10:00 3.280 2025/09/11 14:05:00 3.300 2025/09/11 14:00:00 3.260 2025/09/11 13:55:00 3.280 2025/09/11 13:50:00 3.190 2025/09/11 13:45:00 3.270 2025/09/11 13:40:00 3.270 2025/09/11 13:35:00 3.300 2025/09/11 13:30:00 3.280 2025/09/11 13:25:00 3.280 2025/09/11 13:20:00 3.300 2025/09/11 13:15:00 3.300 2025/09/11 13:10:00 3.260 2025/09/11 13:05:00 3.250 2025/09/11 13:00:00 3.300 2025/09/11 12:55:00 3.270 2025/09/11 12:50:00 3.260 2025/09/11 12:45:00 3.270 2025/09/11 12:40:00 3.230 2025/09/11 12:35:00 3.310 2025/09/11 12:30:00 3.230 2025/09/11 12:25:00 3.320 2025/09/11 12:20:00 3.230 2025/09/11 12:15:00 3.230 2025/09/11 12:10:00 3.210 2025/09/11 12:05:00 3.310 2025/09/11 12:00:00 3.270 2025/09/11 11:55:00 3.220 2025/09/11 11:50:00 3.350 2025/09/11 11:45:00 3.220 2025/09/11 11:40:00 3.270 2025/09/11 11:35:00 3.280 2025/09/11 11:30:00 3.270 2025/09/11 11:25:00 3.310 2025/09/11 11:20:00 3.300 2025/09/11 11:15:00 3.310 2025/09/11 11:10:00 3.260 2025/09/11 11:05:00 3.300 2025/09/11 11:00:00 3.320 2025/09/11 10:55:00 3.310 2025/09/11 10:50:00 3.270 2025/09/11 10:45:00 3.230 2025/09/11 10:40:00 3.300 2025/09/11 10:35:00 3.270 2025/09/11 10:30:00 3.270 2025/09/11 10:25:00 3.300 2025/09/11 10:20:00 3.260 2025/09/11 10:15:00 3.280 2025/09/11 10:10:00 3.280 2025/09/11 10:05:00 3.300 2025/09/11 10:00:00 3.280 2025/09/11 09:55:00 3.230 2025/09/11 09:50:00 3.340 2025/09/11 09:45:00 3.280 2025/09/11 09:40:00 3.280 2025/09/11 09:35:00 3.320 2025/09/11 09:30:00 3.260 2025/09/11 09:25:00 3.300 2025/09/11 09:20:00 3.310 2025/09/11 09:15:00 3.310 2025/09/11 09:10:00 3.300 2025/09/11 09:05:00 3.280 2025/09/11 09:00:00 3.270 2025/09/11 08:55:00 3.340 2025/09/11 08:50:00 3.300 2025/09/11 08:45:00 3.250 2025/09/11 08:40:00 3.250 2025/09/11 08:35:00 3.270 2025/09/11 08:30:00 3.310 2025/09/11 08:25:00 3.280 2025/09/11 08:20:00 3.280 2025/09/11 08:15:00 3.250 2025/09/11 08:10:00 3.300 2025/09/11 08:05:00 3.280 2025/09/11 08:00:00 3.300 2025/09/11 07:55:00 3.310 2025/09/11 07:50:00 3.300 2025/09/11 07:45:00 3.300 2025/09/11 07:40:00 3.180 2025/09/11 07:35:00 3.250 2025/09/11 07:30:00 3.310 2025/09/11 07:25:00 3.300 2025/09/11 07:20:00 3.280 2025/09/11 07:15:00 3.320 2025/09/11 07:10:00 3.260 2025/09/11 07:05:00 3.270 2025/09/11 07:00:00 3.280 2025/09/11 06:55:00 3.340 2025/09/11 06:50:00 3.310 2025/09/11 06:45:00 3.280 2025/09/11 06:40:00 3.170 2025/09/11 06:35:00 3.340 2025/09/11 06:30:00 3.310 2025/09/11 06:25:00 3.260 2025/09/11 06:20:00 3.280 2025/09/11 06:15:00 3.230 2025/09/11 06:10:00 3.280 2025/09/11 06:05:00 3.280 2025/09/11 06:00:00 3.250 2025/09/11 05:55:00 3.210 2025/09/11 05:50:00 3.310 2025/09/11 05:45:00 3.320 2025/09/11 05:40:00 3.280 2025/09/11 05:35:00 3.280 2025/09/11 05:30:00 3.310 2025/09/11 05:25:00 3.230 2025/09/11 05:20:00 3.260 2025/09/11 05:15:00 3.270 2025/09/11 05:10:00 3.180 2025/09/11 05:05:00 3.260 2025/09/11 05:00:00 3.300 2025/09/11 04:55:00 3.220 2025/09/11 04:50:00 3.300 2025/09/11 04:45:00 3.270 2025/09/11 04:40:00 3.260 2025/09/11 04:35:00 3.190 2025/09/11 04:30:00 3.260 2025/09/11 04:25:00 3.280 2025/09/11 04:20:00 3.280 2025/09/11 04:15:00 3.150 2025/09/11 04:10:00 3.270 2025/09/11 04:05:00 3.260 2025/09/11 04:00:00 3.260 2025/09/11 03:55:00 3.250 2025/09/11 03:50:00 3.300 2025/09/11 03:45:00 3.250 2025/09/11 03:40:00 3.260 2025/09/11 03:35:00 3.280 2025/09/11 03:30:00 3.270 2025/09/11 03:25:00 3.260 2025/09/11 03:20:00 3.260 2025/09/11 03:15:00 3.270 2025/09/11 03:10:00 3.230 2025/09/11 03:05:00 3.270 2025/09/11 03:00:00 3.270 2025/09/11 02:55:00 3.280 2025/09/11 02:50:00 3.310 2025/09/11 02:45:00 3.250 2025/09/11 02:40:00 3.260 2025/09/11 02:35:00 3.300 2025/09/11 02:30:00 3.260 2025/09/11 02:25:00 3.280 2025/09/11 02:20:00 3.190 2025/09/11 02:15:00 3.220 2025/09/11 02:10:00 3.270 2025/09/11 02:05:00 3.190 2025/09/11 02:00:00 3.260 2025/09/11 01:55:00 3.260 2025/09/11 01:50:00 3.260 2025/09/11 01:45:00 3.270 2025/09/11 01:40:00 3.310 2025/09/11 01:35:00 3.220 2025/09/11 01:30:00 3.260 2025/09/11 01:25:00 3.250 2025/09/11 01:20:00 3.230 2025/09/11 01:15:00 3.230 2025/09/11 01:10:00 3.220 2025/09/11 01:05:00 3.280 2025/09/11 01:00:00 3.270 2025/09/11 00:55:00 3.300 2025/09/11 00:50:00 3.310 2025/09/11 00:45:00 3.260 2025/09/11 00:40:00 3.220 2025/09/11 00:35:00 3.250 2025/09/11 00:30:00 3.270 2025/09/11 00:25:00 3.250 2025/09/11 00:20:00 3.250 2025/09/11 00:15:00 3.260 2025/09/11 00:10:00 3.220 2025/09/11 00:05:00 3.190 2025/09/11 00:00:00 3.250 2025/09/10 23:55:00 3.260 2025/09/10 23:50:00 3.220 2025/09/10 23:45:00 3.270 2025/09/10 23:40:00 3.280 2025/09/10 23:35:00 3.250 2025/09/10 23:30:00 3.280 2025/09/10 23:25:00 3.320 2025/09/10 23:20:00 3.210 2025/09/10 23:15:00 3.270 2025/09/10 23:10:00 3.190 2025/09/10 23:05:00 3.280 2025/09/10 23:00:00 3.260 2025/09/10 22:55:00 3.270 2025/09/10 22:50:00 3.280 2025/09/10 22:45:00 3.230 2025/09/10 22:40:00 3.300 2025/09/10 22:35:00 3.270 2025/09/10 22:30:00 3.220 2025/09/10 22:25:00 3.280 2025/09/10 22:20:00 3.300 2025/09/10 22:15:00 3.270 2025/09/10 22:10:00 3.250 2025/09/10 22:05:00 3.260 2025/09/10 22:00:00 3.280 2025/09/10 21:55:00 3.250 2025/09/10 21:50:00 3.270 2025/09/10 21:45:00 3.270 2025/09/10 21:40:00 3.230 2025/09/10 21:35:00 3.260 2025/09/10 21:30:00 3.300 2025/09/10 21:25:00 3.220 2025/09/10 21:20:00 3.300 2025/09/10 21:15:00 3.220 2025/09/10 21:10:00 3.300 2025/09/10 21:05:00 3.270 2025/09/10 21:00:00 3.260 2025/09/10 20:55:00 3.300 2025/09/10 20:50:00 3.270 2025/09/10 20:45:00 3.230 2025/09/10 20:40:00 3.300 2025/09/10 20:35:00 3.300 2025/09/10 20:30:00 3.300 2025/09/10 20:25:00 3.310 2025/09/10 20:20:00 3.270 2025/09/10 20:15:00 3.180 2025/09/10 20:10:00 3.250 2025/09/10 20:05:00 3.300 2025/09/10 20:00:00 3.350 2025/09/10 19:55:00 3.360 2025/09/10 19:50:00 3.310 2025/09/10 19:45:00 3.270 2025/09/10 19:40:00 3.270 2025/09/10 19:35:00 3.260 2025/09/10 19:30:00 3.310 2025/09/10 19:25:00 3.340 2025/09/10 19:20:00 3.230 2025/09/10 19:15:00 3.300 2025/09/10 19:10:00 3.280 2025/09/10 19:05:00 3.270 2025/09/10 19:00:00 3.190 2025/09/10 18:55:00 3.270 2025/09/10 18:50:00 3.270 2025/09/10 18:45:00 3.270 2025/09/10 18:40:00 3.310 2025/09/10 18:35:00 3.300 2025/09/10 18:30:00 3.310 2025/09/10 18:25:00 3.310 2025/09/10 18:20:00 3.230 2025/09/10 18:15:00 3.310 2025/09/10 18:10:00 3.300 2025/09/10 18:05:00 3.280 2025/09/10 18:00:00 3.260 2025/09/10 17:55:00 3.310 2025/09/10 17:50:00 3.300 2025/09/10 17:45:00 3.310 2025/09/10 17:40:00 3.280 2025/09/10 17:35:00 3.280 2025/09/10 17:30:00 3.310 2025/09/10 17:25:00 3.310 2025/09/10 17:20:00 3.320 2025/09/10 17:15:00 3.350 2025/09/10 17:10:00 3.300 2025/09/10 17:05:00 3.340 2025/09/10 17:00:00 3.260 2025/09/10 16:55:00 3.280 2025/09/10 16:50:00 3.320 2025/09/10 16:45:00 3.300 2025/09/10 16:40:00 3.340 2025/09/10 16:35:00 3.300 2025/09/10 16:30:00 3.280 2025/09/10 16:25:00 3.310 2025/09/10 16:20:00 3.340 2025/09/10 16:15:00 3.310 2025/09/10 16:10:00 3.310 2025/09/10 16:05:00 3.280 2025/09/10 16:00:00 3.340 2025/09/10 15:55:00 3.340 2025/09/10 15:50:00 3.340 2025/09/10 15:45:00 3.350 2025/09/10 15:40:00 3.390 2025/09/10 15:35:00 3.340 2025/09/10 15:30:00 3.390 2025/09/10 15:25:00 3.380 2025/09/10 15:20:00 3.340 2025/09/10 15:15:00 3.350 2025/09/10 15:10:00 3.360 2025/09/10 15:05:00 3.270 2025/09/10 15:00:00 3.350 2025/09/10 14:55:00 3.380 2025/09/10 14:50:00 3.360 2025/09/10 14:45:00 3.340 2025/09/10 14:40:00 3.260 2025/09/10 14:35:00 3.350 2025/09/10 14:30:00 3.360 2025/09/10 14:25:00 3.360 2025/09/10 14:20:00 3.390 2025/09/10 14:15:00 3.390 2025/09/10 14:10:00 3.390 2025/09/10 14:05:00 3.300 2025/09/10 14:00:00 3.270 2025/09/10 13:55:00 3.360 2025/09/10 13:50:00 3.350 2025/09/10 13:45:00 3.350 2025/09/10 13:40:00 3.400 2025/09/10 13:35:00 3.360 2025/09/10 13:30:00 3.340 2025/09/10 13:25:00 3.360 2025/09/10 13:20:00 3.350 2025/09/10 13:15:00 3.350 2025/09/10 13:10:00 3.320 2025/09/10 13:05:00 3.430 2025/09/10 13:00:00 3.340 2025/09/10 12:55:00 3.420 2025/09/10 12:50:00 3.380 2025/09/10 12:45:00 3.380 2025/09/10 12:40:00 3.430 2025/09/10 12:35:00 3.420 2025/09/10 12:30:00 3.360 2025/09/10 12:25:00 3.390 2025/09/10 12:20:00 3.390 2025/09/10 12:15:00 3.400 2025/09/10 12:10:00 3.360 2025/09/10 12:05:00 3.450 2025/09/10 12:00:00 3.420 2025/09/10 11:55:00 3.360 2025/09/10 11:50:00 3.380 2025/09/10 11:45:00 3.360 2025/09/10 11:40:00 3.400 2025/09/10 11:35:00 3.380 2025/09/10 11:30:00 3.390 2025/09/10 11:25:00 3.430 2025/09/10 11:20:00 3.420 2025/09/10 11:15:00 3.380 2025/09/10 11:10:00 3.430 2025/09/10 11:05:00 3.420 2025/09/10 11:00:00 3.400 2025/09/10 10:55:00 3.350 2025/09/10 10:50:00 3.460 2025/09/10 10:45:00 3.390 2025/09/10 10:40:00 3.390 2025/09/10 10:35:00 3.380 2025/09/10 10:30:00 3.380 2025/09/10 10:25:00 3.430 2025/09/10 10:20:00 3.420 2025/09/10 10:15:00 3.470 2025/09/10 10:10:00 3.400 2025/09/10 10:05:00 3.400 2025/09/10 10:00:00 3.390 2025/09/10 09:55:00 3.400 2025/09/10 09:50:00 3.250 2025/09/10 09:45:00 3.430 2025/09/10 09:40:00 3.450 2025/09/10 09:35:00 3.400 2025/09/10 09:30:00 3.350 2025/09/10 09:25:00 3.360 2025/09/10 09:20:00 3.400 2025/09/10 09:15:00 3.420 2025/09/10 09:10:00 3.350 2025/09/10 09:05:00 3.430 2025/09/10 09:00:00 3.420 2025/09/10 08:55:00 3.470 2025/09/10 08:50:00 3.420 2025/09/10 08:45:00 3.400 2025/09/10 08:40:00 3.420 2025/09/10 08:35:00 3.450 2025/09/10 08:30:00 3.450 2025/09/10 08:25:00 3.390 2025/09/10 08:20:00 3.460 2025/09/10 08:15:00 3.400 2025/09/10 08:10:00 3.460 2025/09/10 08:05:00 3.450 2025/09/10 08:00:00 3.400 11.500 2025/09/10 07:55:00 3.380 2025/09/10 07:50:00 3.430 2025/09/10 07:45:00 3.400 2025/09/10 07:40:00 3.400 2025/09/10 07:35:00 3.420 2025/09/10 07:30:00 3.380 2025/09/10 07:25:00 3.420 2025/09/10 07:20:00 3.430 2025/09/10 07:15:00 3.460 2025/09/10 07:10:00 3.390 2025/09/10 07:05:00 3.450 2025/09/10 07:00:00 3.470 11.600 2025/09/10 06:55:00 3.450 2025/09/10 06:50:00 3.470 2025/09/10 06:45:00 3.390 2025/09/10 06:40:00 3.390 2025/09/10 06:35:00 3.420 2025/09/10 06:30:00 3.360 2025/09/10 06:25:00 3.430 2025/09/10 06:20:00 3.450 2025/09/10 06:15:00 3.430 2025/09/10 06:10:00 3.430 2025/09/10 06:05:00 3.390 2025/09/10 06:00:00 3.460 11.800 2025/09/10 05:55:00 3.420 2025/09/10 05:50:00 3.450 2025/09/10 05:45:00 3.420 2025/09/10 05:40:00 3.460 2025/09/10 05:35:00 3.490 2025/09/10 05:30:00 3.420 2025/09/10 05:25:00 3.420 2025/09/10 05:20:00 3.450 2025/09/10 05:15:00 3.450 2025/09/10 05:10:00 3.420 2025/09/10 05:05:00 3.450 2025/09/10 05:00:00 3.390 12.100 2025/09/10 04:55:00 3.430 2025/09/10 04:50:00 3.500 2025/09/10 04:45:00 3.400 2025/09/10 04:40:00 3.470 2025/09/10 04:35:00 3.380 2025/09/10 04:30:00 3.510 2025/09/10 04:25:00 3.450 2025/09/10 04:20:00 3.340 2025/09/10 04:15:00 3.390 2025/09/10 04:10:00 3.460 2025/09/10 04:05:00 3.470 2025/09/10 04:00:00 3.510 12.300 2025/09/10 03:55:00 3.430 2025/09/10 03:50:00 3.500 2025/09/10 03:45:00 3.460 2025/09/10 03:40:00 3.490 2025/09/10 03:35:00 3.360 2025/09/10 03:30:00 3.460 2025/09/10 03:25:00 3.340 2025/09/10 03:20:00 3.430 2025/09/10 03:15:00 3.450 2025/09/10 03:10:00 3.400 2025/09/10 03:05:00 3.490 2025/09/10 03:00:00 3.400 12.500 2025/09/10 02:55:00 3.490 2025/09/10 02:50:00 3.420 2025/09/10 02:45:00 3.470 2025/09/10 02:40:00 3.530 2025/09/10 02:35:00 3.460 2025/09/10 02:30:00 3.490 2025/09/10 02:25:00 3.530 2025/09/10 02:20:00 3.490 2025/09/10 02:15:00 3.490 2025/09/10 02:10:00 3.470 2025/09/10 02:05:00 3.460 2025/09/10 02:00:00 3.510 12.800 2025/09/10 01:55:00 3.510 2025/09/10 01:50:00 3.510 2025/09/10 01:45:00 3.530 2025/09/10 01:40:00 3.530 2025/09/10 01:35:00 3.470 2025/09/10 01:30:00 3.470 2025/09/10 01:25:00 3.460 2025/09/10 01:20:00 3.500 2025/09/10 01:15:00 3.500 2025/09/10 01:10:00 3.510 2025/09/10 01:05:00 3.460 2025/09/10 01:00:00 3.530 13.000 2025/09/10 00:55:00 3.430 2025/09/10 00:50:00 3.400 2025/09/10 00:45:00 3.500 2025/09/10 00:40:00 3.450 2025/09/10 00:35:00 3.420 2025/09/10 00:30:00 3.430 2025/09/10 00:25:00 3.430 2025/09/10 00:20:00 3.400 2025/09/10 00:15:00 3.420 2025/09/10 00:10:00 3.390 2025/09/10 00:05:00 3.450 2025/09/10 00:00:00 3.390 13.200