** BC HYDRO - GENERATION AND HYDROMETEOROLOGIC INFORMATION ** CLIMATE, SNOW AND/OR SURFACE WATER STATION: Peace R nr Taylor 2 - operated by: ECCC Water Survey of Canada (07FDX02) (ptr2) Note: Data are provided for information only. BC Hydro does not guarantee their accuracy. Data are based on automated readings which are from time to time inaccurate. Date Time Water level Discharge (yyyy/mm/dd) (PST) (m) (cms) 2025/12/16 07:00:00 2.337 617.000 2025/12/16 06:55:00 2.330 609.000 2025/12/16 06:50:00 2.322 601.000 2025/12/16 06:45:00 2.315 594.000 2025/12/16 06:40:00 2.310 589.000 2025/12/16 06:35:00 2.307 586.000 2025/12/16 06:30:00 2.305 584.000 2025/12/16 06:25:00 2.305 584.000 2025/12/16 06:20:00 2.305 584.000 2025/12/16 06:15:00 2.306 585.000 2025/12/16 06:10:00 2.308 587.000 2025/12/16 06:05:00 2.313 592.000 2025/12/16 06:00:00 2.318 597.000 2025/12/16 05:55:00 2.323 602.000 2025/12/16 05:50:00 2.330 609.000 2025/12/16 05:45:00 2.336 615.000 2025/12/16 05:40:00 2.343 623.000 2025/12/16 05:35:00 2.351 631.000 2025/12/16 05:30:00 2.357 638.000 2025/12/16 05:25:00 2.364 645.000 2025/12/16 05:20:00 2.372 654.000 2025/12/16 05:15:00 2.382 665.000 2025/12/16 05:10:00 2.393 677.000 2025/12/16 05:05:00 2.400 685.000 2025/12/16 05:00:00 2.411 698.000 2025/12/16 04:55:00 2.421 709.000 2025/12/16 04:50:00 2.431 721.000 2025/12/16 04:45:00 2.442 734.000 2025/12/16 04:40:00 2.453 747.000 2025/12/16 04:35:00 2.463 759.000 2025/12/16 04:30:00 2.474 773.000 2025/12/16 04:25:00 2.486 788.000 2025/12/16 04:20:00 2.498 803.000 2025/12/16 04:15:00 2.510 819.000 2025/12/16 04:10:00 2.523 836.000 2025/12/16 04:05:00 2.540 858.000 2025/12/16 04:00:00 2.554 877.000 2025/12/16 03:55:00 2.572 902.000 2025/12/16 03:50:00 2.587 923.000 2025/12/16 03:45:00 2.606 950.000 2025/12/16 03:40:00 2.625 978.000 2025/12/16 03:35:00 2.645 1010.000 2025/12/16 03:30:00 2.666 1040.000 2025/12/16 03:25:00 2.692 1080.000 2025/12/16 03:20:00 2.715 1120.000 2025/12/16 03:15:00 2.738 1160.000 2025/12/16 03:10:00 2.763 1200.000 2025/12/16 03:05:00 2.787 1230.000 2025/12/16 03:00:00 2.810 1250.000 2025/12/16 02:55:00 2.842 1290.000 2025/12/16 02:50:00 2.867 1310.000 2025/12/16 02:45:00 2.887 1330.000 2025/12/16 02:40:00 2.911 1350.000 2025/12/16 02:35:00 2.936 1380.000 2025/12/16 02:30:00 2.959 1400.000 2025/12/16 02:25:00 2.983 1430.000 2025/12/16 02:20:00 3.005 1450.000 2025/12/16 02:15:00 3.026 1470.000 2025/12/16 02:10:00 3.049 1500.000 2025/12/16 02:05:00 3.071 1520.000 2025/12/16 02:00:00 3.091 1540.000 2025/12/16 01:55:00 3.113 1570.000 2025/12/16 01:50:00 3.132 1590.000 2025/12/16 01:45:00 3.152 1610.000 2025/12/16 01:40:00 3.171 1630.000 2025/12/16 01:35:00 3.191 1650.000 2025/12/16 01:30:00 3.210 1670.000 2025/12/16 01:25:00 3.230 1700.000 2025/12/16 01:20:00 3.250 1720.000 2025/12/16 01:15:00 3.275 1750.000 2025/12/16 01:10:00 3.287 1760.000 2025/12/16 01:05:00 3.299 1770.000 2025/12/16 01:00:00 3.320 1800.000 2025/12/16 00:55:00 3.338 1820.000 2025/12/16 00:50:00 3.355 1840.000 2025/12/16 00:45:00 3.370 1860.000 2025/12/16 00:40:00 3.386 1880.000 2025/12/16 00:35:00 3.404 1900.000 2025/12/16 00:30:00 3.421 1920.000 2025/12/16 00:25:00 3.439 1940.000 2025/12/16 00:20:00 3.457 1960.000 2025/12/16 00:15:00 3.477 1990.000 2025/12/16 00:10:00 3.493 2010.000 2025/12/16 00:05:00 3.507 2020.000 2025/12/16 00:00:00 3.524 2050.000 2025/12/15 23:55:00 3.541 2070.000 2025/12/15 23:50:00 3.559 2090.000 2025/12/15 23:45:00 3.576 2110.000 2025/12/15 23:40:00 3.591 2130.000 2025/12/15 23:35:00 3.606 2150.000 2025/12/15 23:30:00 3.622 2170.000 2025/12/15 23:25:00 3.638 2190.000 2025/12/15 23:20:00 3.656 2210.000 2025/12/15 23:15:00 3.673 2240.000 2025/12/15 23:10:00 3.693 2260.000 2025/12/15 23:05:00 3.709 2280.000 2025/12/15 23:00:00 3.723 2300.000 2025/12/15 22:55:00 3.744 2330.000 2025/12/15 22:50:00 3.764 2360.000 2025/12/15 22:45:00 3.784 2380.000 2025/12/15 22:40:00 3.805 2410.000 2025/12/15 22:35:00 3.823 2440.000 2025/12/15 22:30:00 3.843 2460.000 2025/12/15 22:25:00 3.859 2490.000 2025/12/15 22:20:00 3.877 2510.000 2025/12/15 22:15:00 3.897 2540.000 2025/12/15 22:10:00 3.915 2570.000 2025/12/15 22:05:00 3.931 2590.000 2025/12/15 22:00:00 3.941 2600.000 2025/12/15 21:55:00 3.956 2620.000 2025/12/15 21:50:00 3.965 2640.000 2025/12/15 21:45:00 3.972 2650.000 2025/12/15 21:40:00 3.984 2660.000 2025/12/15 21:35:00 3.992 2670.000 2025/12/15 21:30:00 4.000 2690.000 2025/12/15 21:25:00 4.003 2690.000 2025/12/15 21:20:00 4.009 2700.000 2025/12/15 21:15:00 4.012 2700.000 2025/12/15 21:10:00 4.013 2710.000 2025/12/15 21:05:00 4.015 2710.000 2025/12/15 21:00:00 4.015 2710.000 2025/12/15 20:55:00 4.015 2710.000 2025/12/15 20:50:00 4.015 2710.000 2025/12/15 20:45:00 4.015 2710.000 2025/12/15 20:40:00 4.014 2710.000 2025/12/15 20:35:00 4.011 2700.000 2025/12/15 20:30:00 4.007 2700.000 2025/12/15 20:25:00 4.002 2690.000 2025/12/15 20:20:00 3.995 2680.000 2025/12/15 20:15:00 3.989 2670.000 2025/12/15 20:10:00 3.984 2660.000 2025/12/15 20:05:00 3.977 2650.000 2025/12/15 20:00:00 3.973 2650.000 2025/12/15 19:55:00 3.969 2640.000 2025/12/15 19:50:00 3.963 2630.000 2025/12/15 19:45:00 3.954 2620.000 2025/12/15 19:40:00 3.946 2610.000 2025/12/15 19:35:00 3.940 2600.000 2025/12/15 19:30:00 3.930 2590.000 2025/12/15 19:25:00 3.918 2570.000 2025/12/15 19:20:00 3.906 2550.000 2025/12/15 19:15:00 3.887 2530.000 2025/12/15 19:10:00 3.873 2510.000 2025/12/15 19:05:00 3.856 2480.000 2025/12/15 19:00:00 3.841 2460.000 2025/12/15 18:55:00 3.825 2440.000 2025/12/15 18:50:00 3.806 2410.000 2025/12/15 18:45:00 3.787 2390.000 2025/12/15 18:40:00 3.760 2350.000 2025/12/15 18:35:00 3.736 2320.000 2025/12/15 18:30:00 3.716 2290.000 2025/12/15 18:25:00 3.694 2260.000 2025/12/15 18:20:00 3.669 2230.000 2025/12/15 18:15:00 3.640 2190.000 2025/12/15 18:10:00 3.612 2160.000 2025/12/15 18:05:00 3.584 2120.000 2025/12/15 18:00:00 3.555 2080.000 2025/12/15 17:55:00 3.524 2050.000 2025/12/15 17:50:00 3.493 2010.000 2025/12/15 17:45:00 3.456 1960.000 2025/12/15 17:40:00 3.423 1920.000 2025/12/15 17:35:00 3.389 1880.000 2025/12/15 17:30:00 3.353 1840.000 2025/12/15 17:25:00 3.317 1800.000 2025/12/15 17:20:00 3.281 1750.000 2025/12/15 17:15:00 3.249 1720.000 2025/12/15 17:10:00 3.211 1670.000 2025/12/15 17:05:00 3.174 1630.000 2025/12/15 17:00:00 3.139 1590.000 2025/12/15 16:55:00 3.102 1550.000 2025/12/15 16:50:00 3.012 1460.000 2025/12/15 16:45:00 3.012 1460.000 2025/12/15 16:40:00 3.012 1460.000 2025/12/15 16:35:00 3.012 1460.000 2025/12/15 16:30:00 3.012 1460.000 2025/12/15 16:25:00 3.012 1460.000 2025/12/15 16:20:00 3.012 1460.000 2025/12/15 16:15:00 3.012 1460.000 2025/12/15 16:10:00 3.012 1460.000 2025/12/15 16:05:00 3.012 1460.000 2025/12/15 16:00:00 3.012 1460.000 2025/12/15 15:55:00 3.012 1460.000 2025/12/15 15:50:00 3.012 1460.000 2025/12/15 15:45:00 3.012 1460.000 2025/12/15 15:40:00 3.012 1460.000 2025/12/15 15:35:00 3.012 1460.000 2025/12/15 15:30:00 3.012 1460.000 2025/12/15 15:25:00 3.012 1460.000 2025/12/15 15:20:00 3.012 1460.000 2025/12/15 15:15:00 3.012 1460.000 2025/12/15 15:10:00 3.012 1460.000 2025/12/15 15:05:00 3.012 1460.000 2025/12/15 15:00:00 3.012 1460.000 2025/12/15 14:55:00 3.012 1460.000 2025/12/15 14:50:00 3.012 1460.000 2025/12/15 14:45:00 3.012 1460.000 2025/12/15 14:40:00 3.012 1460.000 2025/12/15 14:35:00 3.012 1460.000 2025/12/15 14:30:00 3.012 1460.000 2025/12/15 14:25:00 3.012 1460.000 2025/12/15 14:20:00 3.012 1460.000 2025/12/15 14:15:00 3.012 1460.000 2025/12/15 14:10:00 3.012 1460.000 2025/12/15 14:05:00 3.012 1460.000 2025/12/15 14:00:00 3.012 1460.000 2025/12/15 13:55:00 3.012 1460.000 2025/12/15 13:50:00 3.012 1460.000 2025/12/15 13:45:00 3.012 1460.000 2025/12/15 13:40:00 3.012 1460.000 2025/12/15 13:35:00 3.012 1460.000 2025/12/15 13:30:00 3.012 1460.000 2025/12/15 13:25:00 3.012 1460.000 2025/12/15 13:20:00 3.012 1460.000 2025/12/15 13:15:00 3.012 1460.000 2025/12/15 13:10:00 3.012 1460.000 2025/12/15 13:05:00 3.012 1460.000 2025/12/15 13:00:00 3.012 1460.000 2025/12/15 12:55:00 3.012 1460.000 2025/12/15 12:50:00 3.012 1460.000 2025/12/15 12:45:00 3.012 1460.000 2025/12/15 12:40:00 3.012 1460.000 2025/12/15 12:35:00 3.012 1460.000 2025/12/15 12:30:00 3.012 1460.000 2025/12/15 12:25:00 3.012 1460.000 2025/12/15 12:20:00 3.012 1460.000 2025/12/15 12:15:00 3.012 1460.000 2025/12/15 12:10:00 3.012 1460.000 2025/12/15 12:05:00 3.012 1460.000 2025/12/15 12:00:00 3.012 1460.000 2025/12/15 11:55:00 3.012 1460.000 2025/12/15 11:50:00 3.012 1460.000 2025/12/15 11:45:00 3.012 1460.000 2025/12/15 11:40:00 3.012 1460.000 2025/12/15 11:35:00 3.012 1460.000 2025/12/15 11:30:00 3.012 1460.000 2025/12/15 11:25:00 3.012 1460.000 2025/12/15 11:20:00 3.012 1460.000 2025/12/15 11:15:00 3.012 1460.000 2025/12/15 11:10:00 3.012 1460.000 2025/12/15 11:05:00 3.012 1460.000 2025/12/15 11:00:00 3.012 1460.000 2025/12/15 10:55:00 3.012 1460.000 2025/12/15 10:50:00 3.012 1460.000 2025/12/15 10:45:00 3.012 1460.000 2025/12/15 10:40:00 3.012 1460.000 2025/12/15 10:35:00 3.012 1460.000 2025/12/15 10:30:00 3.012 1460.000 2025/12/15 10:25:00 3.012 1460.000 2025/12/15 10:20:00 3.012 1460.000 2025/12/15 10:15:00 3.012 1460.000 2025/12/15 10:10:00 3.012 1460.000 2025/12/15 10:05:00 3.012 1460.000 2025/12/15 10:00:00 3.012 1460.000 2025/12/15 09:55:00 3.012 1460.000 2025/12/15 09:50:00 3.012 1460.000 2025/12/15 09:45:00 3.012 1460.000 2025/12/15 09:40:00 3.012 1460.000 2025/12/15 09:35:00 3.012 1460.000 2025/12/15 09:30:00 3.012 1460.000 2025/12/15 09:25:00 3.012 1460.000 2025/12/15 09:20:00 3.012 1460.000 2025/12/15 09:15:00 3.012 1460.000 2025/12/15 09:10:00 3.012 1460.000 2025/12/15 09:05:00 3.012 1460.000 2025/12/15 09:00:00 3.012 1460.000 2025/12/15 08:55:00 3.012 1460.000 2025/12/15 08:50:00 3.012 1460.000 2025/12/15 08:45:00 3.012 1460.000 2025/12/15 08:40:00 3.012 1460.000 2025/12/15 08:35:00 3.012 1460.000 2025/12/15 08:30:00 3.013 1460.000 2025/12/15 08:25:00 3.013 1460.000 2025/12/15 08:20:00 3.013 1460.000 2025/12/15 08:15:00 3.012 1460.000 2025/12/15 08:10:00 3.012 1460.000 2025/12/15 08:05:00 3.012 1460.000 2025/12/15 08:00:00 3.013 1460.000 2025/12/15 07:55:00 3.013 1460.000 2025/12/15 07:50:00 3.013 1460.000 2025/12/15 07:45:00 3.013 1460.000 2025/12/15 07:40:00 3.013 1460.000 2025/12/15 07:35:00 3.013 1460.000 2025/12/15 07:30:00 3.013 1460.000 2025/12/15 07:25:00 3.013 1460.000 2025/12/15 07:20:00 3.013 1460.000 2025/12/15 07:15:00 3.013 1460.000 2025/12/15 07:10:00 3.013 1460.000 2025/12/15 07:05:00 3.013 1460.000 2025/12/15 07:00:00 3.013 1460.000 2025/12/15 06:55:00 3.013 1460.000 2025/12/15 06:50:00 3.013 1460.000 2025/12/15 06:45:00 3.013 1460.000 2025/12/15 06:40:00 3.013 1460.000 2025/12/15 06:35:00 3.013 1460.000 2025/12/15 06:30:00 3.013 1460.000 2025/12/15 06:25:00 3.013 1460.000 2025/12/15 06:20:00 3.013 1460.000 2025/12/15 06:15:00 3.013 1460.000 2025/12/15 06:10:00 3.013 1460.000 2025/12/15 06:05:00 3.013 1460.000 2025/12/15 06:00:00 3.013 1460.000 2025/12/15 05:55:00 3.013 1460.000 2025/12/15 05:50:00 3.013 1460.000 2025/12/15 05:45:00 3.013 1460.000 2025/12/15 05:40:00 3.013 1460.000 2025/12/15 05:35:00 3.013 1460.000 2025/12/15 05:30:00 3.013 1460.000 2025/12/15 05:25:00 3.013 1460.000 2025/12/15 05:20:00 3.013 1460.000 2025/12/15 05:15:00 3.013 1460.000 2025/12/15 05:10:00 3.013 1460.000 2025/12/15 05:05:00 3.013 1460.000 2025/12/15 05:00:00 3.013 1460.000 2025/12/15 04:55:00 3.013 1460.000 2025/12/15 04:50:00 3.013 1460.000 2025/12/15 04:45:00 3.013 1460.000 2025/12/15 04:40:00 3.013 1460.000 2025/12/15 04:35:00 3.013 1460.000 2025/12/15 04:30:00 3.013 1460.000 2025/12/15 04:25:00 3.013 1460.000 2025/12/15 04:20:00 3.013 1460.000 2025/12/15 04:15:00 3.013 1460.000 2025/12/15 04:10:00 3.013 1460.000 2025/12/15 04:05:00 3.013 1460.000 2025/12/15 04:00:00 3.013 1460.000 2025/12/15 03:55:00 3.013 1460.000 2025/12/15 03:50:00 3.013 1460.000 2025/12/15 03:45:00 3.013 1460.000 2025/12/15 03:40:00 3.013 1460.000 2025/12/15 03:35:00 3.013 1460.000 2025/12/15 03:30:00 3.013 1460.000 2025/12/15 03:25:00 3.013 1460.000 2025/12/15 03:20:00 3.013 1460.000 2025/12/15 03:15:00 3.013 1460.000 2025/12/15 03:10:00 3.013 1460.000 2025/12/15 03:05:00 3.013 1460.000 2025/12/15 03:00:00 3.013 1460.000 2025/12/15 02:55:00 3.013 1460.000 2025/12/15 02:50:00 3.013 1460.000 2025/12/15 02:45:00 3.013 1460.000 2025/12/15 02:40:00 3.013 1460.000 2025/12/15 02:35:00 3.013 1460.000 2025/12/15 02:30:00 3.013 1460.000 2025/12/15 02:25:00 3.013 1460.000 2025/12/15 02:20:00 3.013 1460.000 2025/12/15 02:15:00 3.013 1460.000 2025/12/15 02:10:00 3.013 1460.000 2025/12/15 02:05:00 3.013 1460.000 2025/12/15 02:00:00 3.013 1460.000 2025/12/15 01:55:00 3.013 1460.000 2025/12/15 01:50:00 3.013 1460.000 2025/12/15 01:45:00 3.013 1460.000 2025/12/15 01:40:00 3.013 1460.000 2025/12/15 01:35:00 3.013 1460.000 2025/12/15 01:30:00 3.013 1460.000 2025/12/15 01:25:00 3.013 1460.000 2025/12/15 01:20:00 3.013 1460.000 2025/12/15 01:15:00 3.013 1460.000 2025/12/15 01:10:00 3.013 1460.000 2025/12/15 01:05:00 3.013 1460.000 2025/12/15 01:00:00 3.013 1460.000 2025/12/15 00:55:00 3.013 1460.000 2025/12/15 00:50:00 3.013 1460.000 2025/12/15 00:45:00 3.013 1460.000 2025/12/15 00:40:00 3.013 1460.000 2025/12/15 00:35:00 3.013 1460.000 2025/12/15 00:30:00 3.013 1460.000 2025/12/15 00:25:00 3.013 1460.000 2025/12/15 00:20:00 3.013 1460.000 2025/12/15 00:15:00 3.013 1460.000 2025/12/15 00:10:00 3.013 1460.000 2025/12/15 00:05:00 3.013 1460.000 2025/12/15 00:00:00 3.013 1460.000 2025/12/14 23:55:00 3.013 1460.000 2025/12/14 23:50:00 3.013 1460.000 2025/12/14 23:45:00 3.013 1460.000 2025/12/14 23:40:00 3.013 1460.000 2025/12/14 23:35:00 3.013 1460.000 2025/12/14 23:30:00 3.013 1460.000 2025/12/14 23:25:00 3.013 1460.000 2025/12/14 23:20:00 3.013 1460.000 2025/12/14 23:15:00 3.013 1460.000 2025/12/14 23:10:00 3.013 1460.000 2025/12/14 23:05:00 3.013 1460.000 2025/12/14 23:00:00 3.013 1460.000 2025/12/14 22:55:00 3.013 1460.000 2025/12/14 22:50:00 3.013 1460.000 2025/12/14 22:45:00 3.013 1460.000 2025/12/14 22:40:00 3.013 1460.000 2025/12/14 22:35:00 3.013 1460.000 2025/12/14 22:30:00 3.013 1460.000 2025/12/14 22:25:00 3.013 1460.000 2025/12/14 22:20:00 3.013 1460.000 2025/12/14 22:15:00 3.013 1460.000 2025/12/14 22:10:00 3.013 1460.000 2025/12/14 22:05:00 3.013 1460.000 2025/12/14 22:00:00 3.013 1460.000 2025/12/14 21:55:00 3.013 1460.000 2025/12/14 21:50:00 3.013 1460.000 2025/12/14 21:45:00 3.013 1460.000 2025/12/14 21:40:00 3.013 1460.000 2025/12/14 21:35:00 3.013 1460.000 2025/12/14 21:30:00 3.013 1460.000 2025/12/14 21:25:00 3.013 1460.000 2025/12/14 21:20:00 3.013 1460.000 2025/12/14 21:15:00 3.013 1460.000 2025/12/14 21:10:00 3.013 1460.000 2025/12/14 21:05:00 3.013 1460.000 2025/12/14 21:00:00 3.013 1460.000 2025/12/14 20:55:00 3.013 1460.000 2025/12/14 20:50:00 3.013 1460.000 2025/12/14 20:45:00 3.013 1460.000 2025/12/14 20:40:00 3.013 1460.000 2025/12/14 20:35:00 3.013 1460.000 2025/12/14 20:30:00 3.013 1460.000 2025/12/14 20:25:00 3.013 1460.000 2025/12/14 20:20:00 3.013 1460.000 2025/12/14 20:15:00 3.013 1460.000 2025/12/14 20:10:00 3.013 1460.000 2025/12/14 20:05:00 3.013 1460.000 2025/12/14 20:00:00 3.013 1460.000 2025/12/14 19:55:00 3.013 1460.000 2025/12/14 19:50:00 3.013 1460.000 2025/12/14 19:45:00 3.013 1460.000 2025/12/14 19:40:00 3.013 1460.000 2025/12/14 19:35:00 3.013 1460.000 2025/12/14 19:30:00 3.013 1460.000 2025/12/14 19:25:00 3.013 1460.000 2025/12/14 19:20:00 3.013 1460.000 2025/12/14 19:15:00 3.013 1460.000 2025/12/14 19:10:00 3.013 1460.000 2025/12/14 19:05:00 3.013 1460.000 2025/12/14 19:00:00 3.013 1460.000 2025/12/14 18:55:00 3.013 1460.000 2025/12/14 18:50:00 3.013 1460.000 2025/12/14 18:45:00 3.013 1460.000 2025/12/14 18:40:00 3.013 1460.000 2025/12/14 18:35:00 3.013 1460.000 2025/12/14 18:30:00 3.013 1460.000 2025/12/14 18:25:00 3.013 1460.000 2025/12/14 18:20:00 3.013 1460.000 2025/12/14 18:15:00 3.013 1460.000 2025/12/14 18:10:00 3.013 1460.000 2025/12/14 18:05:00 3.013 1460.000 2025/12/14 18:00:00 3.013 1460.000 2025/12/14 17:55:00 3.013 1460.000 2025/12/14 17:50:00 3.013 1460.000 2025/12/14 17:45:00 3.013 1460.000 2025/12/14 17:40:00 3.013 1460.000 2025/12/14 17:35:00 3.013 1460.000 2025/12/14 17:30:00 3.013 1460.000 2025/12/14 17:25:00 3.013 1460.000 2025/12/14 17:20:00 3.013 1460.000 2025/12/14 17:15:00 3.013 1460.000 2025/12/14 17:10:00 3.013 1460.000 2025/12/14 17:05:00 3.013 1460.000 2025/12/14 17:00:00 3.013 1460.000 2025/12/14 16:55:00 3.013 1460.000 2025/12/14 16:50:00 3.013 1460.000 2025/12/14 16:45:00 3.013 1460.000 2025/12/14 16:40:00 3.013 1460.000 2025/12/14 16:35:00 3.013 1460.000 2025/12/14 16:30:00 3.013 1460.000 2025/12/14 16:25:00 3.013 1460.000 2025/12/14 16:20:00 3.013 1460.000 2025/12/14 16:15:00 3.013 1460.000 2025/12/14 16:10:00 3.013 1460.000 2025/12/14 16:05:00 3.013 1460.000 2025/12/14 16:00:00 3.013 1460.000 2025/12/14 15:55:00 3.013 1460.000 2025/12/14 15:50:00 3.013 1460.000 2025/12/14 15:45:00 3.013 1460.000 2025/12/14 15:40:00 3.013 1460.000 2025/12/14 15:35:00 3.013 1460.000 2025/12/14 15:30:00 3.013 1460.000 2025/12/14 15:25:00 3.013 1460.000 2025/12/14 15:20:00 3.013 1460.000 2025/12/14 15:15:00 3.013 1460.000 2025/12/14 15:10:00 3.013 1460.000 2025/12/14 15:05:00 3.013 1460.000 2025/12/14 15:00:00 3.013 1460.000 2025/12/14 14:55:00 3.013 1460.000 2025/12/14 14:50:00 3.013 1460.000 2025/12/14 14:45:00 3.013 1460.000 2025/12/14 14:40:00 3.013 1460.000 2025/12/14 14:35:00 3.013 1460.000 2025/12/14 14:30:00 3.013 1460.000 2025/12/14 14:25:00 3.013 1460.000 2025/12/14 14:20:00 3.013 1460.000 2025/12/14 14:15:00 3.013 1460.000 2025/12/14 14:10:00 3.013 1460.000 2025/12/14 14:05:00 3.013 1460.000 2025/12/14 14:00:00 3.013 1460.000 2025/12/14 13:55:00 3.013 1460.000 2025/12/14 13:50:00 3.013 1460.000 2025/12/14 13:45:00 3.013 1460.000 2025/12/14 13:40:00 3.013 1460.000 2025/12/14 13:35:00 3.013 1460.000 2025/12/14 13:30:00 3.013 1460.000 2025/12/14 13:25:00 3.013 1460.000 2025/12/14 13:20:00 3.013 1460.000 2025/12/14 13:15:00 3.013 1460.000 2025/12/14 13:10:00 3.013 1460.000 2025/12/14 13:05:00 3.013 1460.000 2025/12/14 13:00:00 3.013 1460.000 2025/12/14 12:55:00 3.013 1460.000 2025/12/14 12:50:00 3.013 1460.000 2025/12/14 12:45:00 3.014 1460.000 2025/12/14 12:40:00 3.014 1460.000 2025/12/14 12:35:00 3.014 1460.000 2025/12/14 12:30:00 3.014 1460.000 2025/12/14 12:25:00 3.014 1460.000 2025/12/14 12:20:00 3.014 1460.000 2025/12/14 12:15:00 3.014 1460.000 2025/12/14 12:10:00 3.014 1460.000 2025/12/14 12:05:00 3.014 1460.000 2025/12/14 12:00:00 3.014 1460.000 2025/12/14 11:55:00 3.014 1460.000 2025/12/14 11:50:00 3.014 1460.000 2025/12/14 11:45:00 3.014 1460.000 2025/12/14 11:40:00 3.014 1460.000 2025/12/14 11:35:00 3.014 1460.000 2025/12/14 11:30:00 3.014 1460.000 2025/12/14 11:25:00 3.014 1460.000 2025/12/14 11:20:00 3.014 1460.000 2025/12/14 11:15:00 3.014 1460.000 2025/12/14 11:10:00 3.014 1460.000 2025/12/14 11:05:00 3.014 1460.000 2025/12/14 11:00:00 3.014 1460.000 2025/12/14 10:55:00 3.014 1460.000 2025/12/14 10:50:00 3.014 1460.000 2025/12/14 10:45:00 3.014 1460.000 2025/12/14 10:40:00 3.014 1460.000 2025/12/14 10:35:00 3.014 1460.000 2025/12/14 10:30:00 3.014 1460.000 2025/12/14 10:25:00 3.014 1460.000 2025/12/14 10:20:00 3.014 1460.000 2025/12/14 10:15:00 3.014 1460.000 2025/12/14 10:10:00 3.014 1460.000 2025/12/14 10:05:00 3.014 1460.000 2025/12/14 10:00:00 3.014 1460.000 2025/12/14 09:55:00 3.014 1460.000 2025/12/14 09:50:00 3.014 1460.000 2025/12/14 09:45:00 3.014 1460.000 2025/12/14 09:40:00 3.014 1460.000 2025/12/14 09:35:00 3.014 1460.000 2025/12/14 09:30:00 3.014 1460.000 2025/12/14 09:25:00 3.014 1460.000 2025/12/14 09:20:00 3.014 1460.000 2025/12/14 09:15:00 3.014 1460.000 2025/12/14 09:10:00 3.014 1460.000 2025/12/14 09:05:00 3.014 1460.000 2025/12/14 09:00:00 3.014 1460.000 2025/12/14 08:55:00 3.014 1460.000 2025/12/14 08:50:00 3.014 1460.000 2025/12/14 08:45:00 3.014 1460.000 2025/12/14 08:40:00 3.014 1460.000 2025/12/14 08:35:00 3.014 1460.000 2025/12/14 08:30:00 3.014 1460.000 2025/12/14 08:25:00 3.014 1460.000 2025/12/14 08:20:00 3.014 1460.000 2025/12/14 08:15:00 3.014 1460.000 2025/12/14 08:10:00 3.014 1460.000 2025/12/14 08:05:00 3.014 1460.000 2025/12/14 08:00:00 3.014 1460.000 2025/12/14 07:55:00 3.014 1460.000 2025/12/14 07:50:00 3.014 1460.000 2025/12/14 07:45:00 3.014 1460.000 2025/12/14 07:40:00 3.014 1460.000 2025/12/14 07:35:00 3.014 1460.000 2025/12/14 07:30:00 3.014 1460.000 2025/12/14 07:25:00 3.014 1460.000 2025/12/14 07:20:00 3.014 1460.000 2025/12/14 07:15:00 3.014 1460.000 2025/12/14 07:10:00 3.014 1460.000 2025/12/14 07:05:00 3.014 1460.000 2025/12/14 07:00:00 3.014 1460.000 2025/12/14 06:55:00 3.014 1460.000 2025/12/14 06:50:00 3.014 1460.000 2025/12/14 06:45:00 3.014 1460.000 2025/12/14 06:40:00 3.014 1460.000 2025/12/14 06:35:00 3.014 1460.000 2025/12/14 06:30:00 3.014 1460.000 2025/12/14 06:25:00 3.014 1460.000 2025/12/14 06:20:00 3.014 1460.000 2025/12/14 06:15:00 3.014 1460.000 2025/12/14 06:10:00 3.014 1460.000 2025/12/14 06:05:00 3.014 1460.000 2025/12/14 06:00:00 3.014 1460.000 2025/12/14 05:55:00 3.014 1460.000 2025/12/14 05:50:00 3.014 1460.000 2025/12/14 05:45:00 3.014 1460.000 2025/12/14 05:40:00 3.014 1460.000 2025/12/14 05:35:00 3.014 1460.000 2025/12/14 05:30:00 3.014 1460.000 2025/12/14 05:25:00 3.014 1460.000 2025/12/14 05:20:00 3.014 1460.000 2025/12/14 05:15:00 3.014 1460.000 2025/12/14 05:10:00 3.014 1460.000 2025/12/14 05:05:00 3.014 1460.000 2025/12/14 05:00:00 3.014 1460.000 2025/12/14 04:55:00 3.014 1460.000 2025/12/14 04:50:00 3.014 1460.000 2025/12/14 04:45:00 3.014 1460.000 2025/12/14 04:40:00 3.014 1460.000 2025/12/14 04:35:00 3.014 1460.000 2025/12/14 04:30:00 3.014 1460.000 2025/12/14 04:25:00 3.014 1460.000 2025/12/14 04:20:00 3.014 1460.000 2025/12/14 04:15:00 3.014 1460.000 2025/12/14 04:10:00 3.015 1460.000 2025/12/14 04:05:00 3.014 1460.000 2025/12/14 04:00:00 3.015 1460.000 2025/12/14 03:55:00 3.015 1460.000 2025/12/14 03:50:00 3.015 1460.000 2025/12/14 03:45:00 3.015 1460.000 2025/12/14 03:40:00 3.015 1460.000 2025/12/14 03:35:00 3.015 1460.000 2025/12/14 03:30:00 3.015 1460.000 2025/12/14 03:25:00 3.015 1460.000 2025/12/14 03:20:00 3.015 1460.000 2025/12/14 03:15:00 3.015 1460.000 2025/12/14 03:10:00 3.015 1460.000 2025/12/14 03:05:00 3.015 1460.000 2025/12/14 03:00:00 3.015 1460.000 2025/12/14 02:55:00 3.015 1460.000 2025/12/14 02:50:00 3.015 1460.000 2025/12/14 02:45:00 3.015 1460.000 2025/12/14 02:40:00 3.015 1460.000 2025/12/14 02:35:00 3.015 1460.000 2025/12/14 02:30:00 3.015 1460.000 2025/12/14 02:25:00 3.015 1460.000 2025/12/14 02:20:00 3.015 1460.000 2025/12/14 02:15:00 3.015 1460.000 2025/12/14 02:10:00 3.015 1460.000 2025/12/14 02:05:00 3.015 1460.000 2025/12/14 02:00:00 3.015 1460.000 2025/12/14 01:55:00 3.015 1460.000 2025/12/14 01:50:00 3.015 1460.000 2025/12/14 01:45:00 3.015 1460.000 2025/12/14 01:40:00 3.015 1460.000 2025/12/14 01:35:00 3.015 1460.000 2025/12/14 01:30:00 3.015 1460.000 2025/12/14 01:25:00 3.015 1460.000 2025/12/14 01:20:00 3.015 1460.000 2025/12/14 01:15:00 3.015 1460.000 2025/12/14 01:10:00 3.015 1460.000 2025/12/14 01:05:00 3.015 1460.000 2025/12/14 01:00:00 3.015 1460.000 2025/12/14 00:55:00 3.015 1460.000 2025/12/14 00:50:00 3.015 1460.000 2025/12/14 00:45:00 3.015 1460.000 2025/12/14 00:40:00 3.015 1460.000 2025/12/14 00:35:00 3.015 1460.000 2025/12/14 00:30:00 3.015 1460.000 2025/12/14 00:25:00 3.015 1460.000 2025/12/14 00:20:00 3.015 1460.000 2025/12/14 00:15:00 3.015 1460.000 2025/12/14 00:10:00 3.015 1460.000 2025/12/14 00:05:00 3.015 1460.000 2025/12/14 00:00:00 3.015 1460.000 2025/12/13 23:55:00 3.015 1460.000 2025/12/13 23:50:00 3.015 1460.000 2025/12/13 23:45:00 3.015 1460.000 2025/12/13 23:40:00 3.015 1460.000 2025/12/13 23:35:00 3.015 1460.000 2025/12/13 23:30:00 3.015 1460.000 2025/12/13 23:25:00 3.015 1460.000 2025/12/13 23:20:00 3.015 1460.000 2025/12/13 23:15:00 3.015 1460.000 2025/12/13 23:10:00 3.015 1460.000 2025/12/13 23:05:00 3.015 1460.000 2025/12/13 23:00:00 3.015 1460.000 2025/12/13 22:55:00 3.015 1460.000 2025/12/13 22:50:00 3.015 1460.000 2025/12/13 22:45:00 3.015 1460.000 2025/12/13 22:40:00 3.015 1460.000 2025/12/13 22:35:00 3.015 1460.000 2025/12/13 22:30:00 3.015 1460.000 2025/12/13 22:25:00 3.015 1460.000 2025/12/13 22:20:00 3.015 1460.000 2025/12/13 22:15:00 3.015 1460.000 2025/12/13 22:10:00 3.015 1460.000 2025/12/13 22:05:00 3.015 1460.000 2025/12/13 22:00:00 3.015 1460.000 2025/12/13 21:55:00 3.015 1460.000 2025/12/13 21:50:00 3.015 1460.000 2025/12/13 21:45:00 3.015 1460.000 2025/12/13 21:40:00 3.015 1460.000 2025/12/13 21:35:00 3.015 1460.000 2025/12/13 21:30:00 3.015 1460.000 2025/12/13 21:25:00 3.016 1460.000 2025/12/13 21:20:00 3.016 1460.000 2025/12/13 21:15:00 3.016 1460.000 2025/12/13 21:10:00 3.016 1460.000 2025/12/13 21:05:00 3.016 1460.000 2025/12/13 21:00:00 3.016 1460.000 2025/12/13 20:55:00 3.016 1460.000 2025/12/13 20:50:00 3.016 1460.000 2025/12/13 20:45:00 3.016 1460.000 2025/12/13 20:40:00 3.016 1460.000 2025/12/13 20:35:00 3.016 1460.000 2025/12/13 20:30:00 3.016 1460.000 2025/12/13 20:25:00 3.016 1460.000 2025/12/13 20:20:00 3.016 1460.000 2025/12/13 20:15:00 3.016 1460.000 2025/12/13 20:10:00 3.016 1460.000 2025/12/13 20:05:00 3.016 1460.000 2025/12/13 20:00:00 3.016 1460.000 2025/12/13 19:55:00 3.016 1460.000 2025/12/13 19:50:00 3.016 1460.000 2025/12/13 19:45:00 3.016 1460.000 2025/12/13 19:40:00 3.016 1460.000 2025/12/13 19:35:00 3.016 1460.000 2025/12/13 19:30:00 3.016 1460.000 2025/12/13 19:25:00 3.016 1460.000 2025/12/13 19:20:00 3.016 1460.000 2025/12/13 19:15:00 3.016 1460.000 2025/12/13 19:10:00 3.016 1460.000 2025/12/13 19:05:00 3.016 1460.000 2025/12/13 19:00:00 3.016 1460.000 2025/12/13 18:55:00 3.016 1460.000 2025/12/13 18:50:00 3.016 1460.000 2025/12/13 18:45:00 3.016 1460.000 2025/12/13 18:40:00 3.016 1460.000 2025/12/13 18:35:00 3.016 1460.000 2025/12/13 18:30:00 3.016 1460.000 2025/12/13 18:25:00 3.016 1460.000 2025/12/13 18:20:00 3.016 1460.000 2025/12/13 18:15:00 3.016 1460.000 2025/12/13 18:10:00 3.016 1460.000 2025/12/13 18:05:00 3.016 1460.000 2025/12/13 18:00:00 3.016 1460.000 2025/12/13 17:55:00 3.016 1460.000 2025/12/13 17:50:00 3.016 1460.000 2025/12/13 17:45:00 3.016 1460.000 2025/12/13 17:40:00 3.016 1460.000 2025/12/13 17:35:00 3.016 1460.000 2025/12/13 17:30:00 3.016 1460.000 2025/12/13 17:25:00 3.016 1460.000 2025/12/13 17:20:00 3.016 1460.000 2025/12/13 17:15:00 3.016 1460.000 2025/12/13 17:10:00 3.016 1460.000 2025/12/13 17:05:00 3.016 1460.000 2025/12/13 17:00:00 3.016 1460.000 2025/12/13 16:55:00 3.016 1460.000 2025/12/13 16:50:00 3.016 1460.000 2025/12/13 16:45:00 3.016 1460.000 2025/12/13 16:40:00 3.016 1460.000 2025/12/13 16:35:00 3.016 1460.000 2025/12/13 16:30:00 3.016 1460.000 2025/12/13 16:25:00 3.016 1460.000 2025/12/13 16:20:00 3.016 1460.000 2025/12/13 16:15:00 3.016 1460.000 2025/12/13 16:10:00 3.016 1460.000 2025/12/13 16:05:00 3.016 1460.000 2025/12/13 16:00:00 3.016 1460.000 2025/12/13 15:55:00 3.016 1460.000 2025/12/13 15:50:00 3.016 1460.000 2025/12/13 15:45:00 3.016 1460.000 2025/12/13 15:40:00 3.016 1460.000 2025/12/13 15:35:00 3.016 1460.000 2025/12/13 15:30:00 3.016 1460.000 2025/12/13 15:25:00 3.016 1460.000 2025/12/13 15:20:00 3.016 1460.000 2025/12/13 15:15:00 3.016 1460.000 2025/12/13 15:10:00 3.016 1460.000 2025/12/13 15:05:00 3.016 1460.000 2025/12/13 15:00:00 3.016 1460.000 2025/12/13 14:55:00 3.016 1460.000 2025/12/13 14:50:00 3.016 1460.000 2025/12/13 14:45:00 3.016 1460.000 2025/12/13 14:40:00 3.016 1460.000 2025/12/13 14:35:00 3.016 1460.000 2025/12/13 14:30:00 3.016 1460.000 2025/12/13 14:25:00 3.016 1460.000 2025/12/13 14:20:00 3.016 1460.000 2025/12/13 14:15:00 3.016 1460.000 2025/12/13 14:10:00 3.016 1460.000 2025/12/13 14:05:00 3.016 1460.000 2025/12/13 14:00:00 3.016 1460.000 2025/12/13 13:55:00 3.016 1460.000 2025/12/13 13:50:00 3.016 1460.000 2025/12/13 13:45:00 3.016 1460.000 2025/12/13 13:40:00 3.016 1460.000 2025/12/13 13:35:00 3.016 1460.000 2025/12/13 13:30:00 3.016 1460.000 2025/12/13 13:25:00 3.016 1460.000 2025/12/13 13:20:00 3.016 1460.000 2025/12/13 13:15:00 3.016 1460.000 2025/12/13 13:10:00 3.016 1460.000 2025/12/13 13:05:00 3.016 1460.000 2025/12/13 13:00:00 3.016 1460.000 2025/12/13 12:55:00 3.016 1460.000 2025/12/13 12:50:00 3.016 1460.000 2025/12/13 12:45:00 3.016 1460.000 2025/12/13 12:40:00 3.016 1460.000 2025/12/13 12:35:00 3.016 1460.000 2025/12/13 12:30:00 3.016 1460.000 2025/12/13 12:25:00 3.016 1460.000 2025/12/13 12:20:00 3.016 1460.000 2025/12/13 12:15:00 3.016 1460.000 2025/12/13 12:10:00 3.016 1460.000 2025/12/13 12:05:00 3.016 1460.000 2025/12/13 12:00:00 3.016 1460.000 2025/12/13 11:55:00 3.016 1460.000 2025/12/13 11:50:00 3.016 1460.000 2025/12/13 11:45:00 3.016 1460.000 2025/12/13 11:40:00 3.016 1460.000 2025/12/13 11:35:00 3.016 1460.000 2025/12/13 11:30:00 3.016 1460.000 2025/12/13 11:25:00 3.016 1460.000 2025/12/13 11:20:00 3.016 1460.000 2025/12/13 11:15:00 3.016 1460.000 2025/12/13 11:10:00 3.016 1460.000 2025/12/13 11:05:00 3.016 1460.000 2025/12/13 11:00:00 3.016 1460.000 2025/12/13 10:55:00 3.016 1460.000 2025/12/13 10:50:00 3.016 1460.000 2025/12/13 10:45:00 3.016 1460.000 2025/12/13 10:40:00 3.016 1460.000 2025/12/13 10:35:00 3.016 1460.000 2025/12/13 10:30:00 3.016 1460.000 2025/12/13 10:25:00 3.016 1460.000 2025/12/13 10:20:00 3.016 1460.000 2025/12/13 10:15:00 3.016 1460.000 2025/12/13 10:10:00 3.016 1460.000 2025/12/13 10:05:00 3.016 1460.000 2025/12/13 10:00:00 3.016 1460.000 2025/12/13 09:55:00 3.016 1460.000 2025/12/13 09:50:00 3.016 1460.000 2025/12/13 09:45:00 3.016 1460.000 2025/12/13 09:40:00 3.016 1460.000 2025/12/13 09:35:00 3.016 1460.000 2025/12/13 09:30:00 3.016 1460.000 2025/12/13 09:25:00 3.016 1460.000 2025/12/13 09:20:00 3.016 1460.000 2025/12/13 09:15:00 3.016 1460.000 2025/12/13 09:10:00 3.016 1460.000 2025/12/13 09:05:00 3.016 1460.000 2025/12/13 09:00:00 3.016 1460.000 2025/12/13 08:55:00 3.016 1460.000 2025/12/13 08:50:00 3.016 1460.000 2025/12/13 08:45:00 3.016 1460.000 2025/12/13 08:40:00 3.016 1460.000 2025/12/13 08:35:00 3.016 1460.000 2025/12/13 08:30:00 3.016 1460.000 2025/12/13 08:25:00 3.016 1460.000 2025/12/13 08:20:00 3.016 1460.000 2025/12/13 08:15:00 3.016 1460.000 2025/12/13 08:10:00 3.016 1460.000 2025/12/13 08:05:00 3.016 1460.000 2025/12/13 08:00:00 3.016 1460.000 2025/12/13 07:55:00 3.016 1460.000 2025/12/13 07:50:00 3.016 1460.000 2025/12/13 07:45:00 3.016 1460.000 2025/12/13 07:40:00 3.016 1460.000 2025/12/13 07:35:00 3.016 1460.000 2025/12/13 07:30:00 3.016 1460.000 2025/12/13 07:25:00 3.017 1460.000 2025/12/13 07:20:00 3.017 1460.000 2025/12/13 07:15:00 3.017 1460.000 2025/12/13 07:10:00 3.017 1460.000 2025/12/13 07:05:00 3.016 1460.000 2025/12/13 07:00:00 3.017 1460.000 2025/12/13 06:55:00 3.017 1460.000 2025/12/13 06:50:00 3.016 1460.000 2025/12/13 06:45:00 3.016 1460.000 2025/12/13 06:40:00 3.017 1460.000 2025/12/13 06:35:00 3.017 1460.000 2025/12/13 06:30:00 3.017 1460.000 2025/12/13 06:25:00 3.017 1460.000 2025/12/13 06:20:00 3.017 1460.000 2025/12/13 06:15:00 3.017 1460.000 2025/12/13 06:10:00 3.017 1460.000 2025/12/13 06:05:00 3.017 1460.000 2025/12/13 06:00:00 3.017 1460.000 2025/12/13 05:55:00 3.017 1460.000 2025/12/13 05:50:00 3.017 1460.000 2025/12/13 05:45:00 3.017 1460.000 2025/12/13 05:40:00 3.017 1460.000 2025/12/13 05:35:00 3.017 1460.000 2025/12/13 05:30:00 3.017 1460.000 2025/12/13 05:25:00 3.017 1460.000 2025/12/13 05:20:00 3.017 1460.000 2025/12/13 05:15:00 3.017 1460.000 2025/12/13 05:10:00 3.017 1460.000 2025/12/13 05:05:00 3.017 1460.000 2025/12/13 05:00:00 3.017 1460.000 2025/12/13 04:55:00 3.017 1460.000 2025/12/13 04:50:00 3.017 1460.000 2025/12/13 04:45:00 3.017 1460.000 2025/12/13 04:40:00 3.017 1460.000 2025/12/13 04:35:00 3.017 1460.000 2025/12/13 04:30:00 3.017 1460.000 2025/12/13 04:25:00 3.017 1460.000 2025/12/13 04:20:00 3.017 1460.000 2025/12/13 04:15:00 3.017 1460.000 2025/12/13 04:10:00 3.017 1460.000 2025/12/13 04:05:00 3.017 1460.000 2025/12/13 04:00:00 3.017 1460.000 2025/12/13 03:55:00 3.017 1460.000 2025/12/13 03:50:00 3.017 1460.000 2025/12/13 03:45:00 3.017 1460.000 2025/12/13 03:40:00 3.017 1460.000 2025/12/13 03:35:00 3.017 1460.000 2025/12/13 03:30:00 3.017 1460.000 2025/12/13 03:25:00 3.017 1460.000 2025/12/13 03:20:00 3.017 1460.000 2025/12/13 03:15:00 3.017 1460.000 2025/12/13 03:10:00 3.017 1460.000 2025/12/13 03:05:00 3.017 1460.000 2025/12/13 03:00:00 3.017 1460.000 2025/12/13 02:55:00 3.017 1460.000 2025/12/13 02:50:00 3.017 1460.000 2025/12/13 02:45:00 3.017 1460.000 2025/12/13 02:40:00 3.017 1460.000 2025/12/13 02:35:00 3.017 1460.000 2025/12/13 02:30:00 3.017 1460.000 2025/12/13 02:25:00 3.017 1460.000 2025/12/13 02:20:00 3.017 1460.000 2025/12/13 02:15:00 3.017 1460.000 2025/12/13 02:10:00 3.017 1460.000 2025/12/13 02:05:00 3.017 1460.000 2025/12/13 02:00:00 3.017 1460.000 2025/12/13 01:55:00 3.017 1460.000 2025/12/13 01:50:00 3.017 1460.000 2025/12/13 01:45:00 3.017 1460.000 2025/12/13 01:40:00 3.017 1460.000 2025/12/13 01:35:00 3.017 1460.000 2025/12/13 01:30:00 3.017 1460.000 2025/12/13 01:25:00 3.017 1460.000 2025/12/13 01:20:00 3.017 1460.000 2025/12/13 01:15:00 3.017 1460.000 2025/12/13 01:10:00 3.017 1460.000 2025/12/13 01:05:00 3.017 1460.000 2025/12/13 01:00:00 3.017 1460.000 2025/12/13 00:55:00 3.017 1460.000 2025/12/13 00:50:00 3.017 1460.000 2025/12/13 00:45:00 3.017 1460.000 2025/12/13 00:40:00 3.017 1460.000 2025/12/13 00:35:00 3.017 1460.000 2025/12/13 00:30:00 3.017 1460.000 2025/12/13 00:25:00 3.017 1460.000 2025/12/13 00:20:00 3.017 1460.000 2025/12/13 00:15:00 3.017 1460.000 2025/12/13 00:10:00 3.017 1460.000 2025/12/13 00:05:00 3.017 1460.000 2025/12/13 00:00:00 3.017 1460.000 2025/12/12 23:55:00 3.017 1460.000 2025/12/12 23:50:00 3.017 1460.000 2025/12/12 23:45:00 3.017 1460.000 2025/12/12 23:40:00 3.017 1460.000 2025/12/12 23:35:00 3.017 1460.000 2025/12/12 23:30:00 3.017 1460.000 2025/12/12 23:25:00 3.017 1460.000 2025/12/12 23:20:00 3.017 1460.000 2025/12/12 23:15:00 3.017 1460.000 2025/12/12 23:10:00 3.017 1460.000 2025/12/12 23:05:00 3.017 1460.000 2025/12/12 23:00:00 3.017 1460.000 2025/12/12 22:55:00 3.017 1460.000 2025/12/12 22:50:00 3.017 1460.000 2025/12/12 22:45:00 3.017 1460.000 2025/12/12 22:40:00 3.017 1460.000 2025/12/12 22:35:00 3.017 1460.000 2025/12/12 22:30:00 3.017 1460.000 2025/12/12 22:25:00 3.017 1460.000 2025/12/12 22:20:00 3.017 1460.000 2025/12/12 22:15:00 3.017 1460.000 2025/12/12 22:10:00 3.017 1460.000 2025/12/12 22:05:00 3.017 1460.000 2025/12/12 22:00:00 3.017 1460.000 2025/12/12 21:55:00 3.017 1460.000 2025/12/12 21:50:00 3.017 1460.000 2025/12/12 21:45:00 3.017 1460.000 2025/12/12 21:40:00 3.017 1460.000 2025/12/12 21:35:00 3.017 1460.000 2025/12/12 21:30:00 3.017 1460.000 2025/12/12 21:25:00 3.017 1460.000 2025/12/12 21:20:00 3.017 1460.000 2025/12/12 21:15:00 3.017 1460.000 2025/12/12 21:10:00 3.017 1460.000 2025/12/12 21:05:00 3.017 1460.000 2025/12/12 21:00:00 3.017 1460.000 2025/12/12 20:55:00 3.017 1460.000 2025/12/12 20:50:00 3.017 1460.000 2025/12/12 20:45:00 3.017 1460.000 2025/12/12 20:40:00 3.017 1460.000 2025/12/12 20:35:00 3.017 1460.000 2025/12/12 20:30:00 3.017 1460.000 2025/12/12 20:25:00 3.017 1460.000 2025/12/12 20:20:00 3.017 1460.000 2025/12/12 20:15:00 3.017 1460.000 2025/12/12 20:10:00 3.017 1460.000 2025/12/12 20:05:00 3.017 1460.000 2025/12/12 20:00:00 3.017 1460.000 2025/12/12 19:55:00 3.017 1460.000 2025/12/12 19:50:00 3.017 1460.000 2025/12/12 19:45:00 3.017 1460.000 2025/12/12 19:40:00 3.017 1460.000 2025/12/12 19:35:00 3.017 1460.000 2025/12/12 19:30:00 3.017 1460.000 2025/12/12 19:25:00 3.017 1460.000 2025/12/12 19:20:00 3.017 1460.000 2025/12/12 19:15:00 3.017 1460.000 2025/12/12 19:10:00 3.017 1460.000 2025/12/12 19:05:00 3.017 1460.000 2025/12/12 19:00:00 3.017 1460.000 2025/12/12 18:55:00 3.017 1460.000 2025/12/12 18:50:00 3.017 1460.000 2025/12/12 18:45:00 3.017 1460.000 2025/12/12 18:40:00 3.017 1460.000 2025/12/12 18:35:00 3.017 1460.000 2025/12/12 18:30:00 3.017 1460.000 2025/12/12 18:25:00 3.017 1460.000 2025/12/12 18:20:00 3.017 1460.000 2025/12/12 18:15:00 3.017 1460.000 2025/12/12 18:10:00 3.017 1460.000 2025/12/12 18:05:00 3.017 1460.000 2025/12/12 18:00:00 3.017 1460.000 2025/12/12 17:55:00 3.017 1460.000 2025/12/12 17:50:00 3.017 1460.000 2025/12/12 17:45:00 3.017 1460.000 2025/12/12 17:40:00 3.017 1460.000 2025/12/12 17:35:00 3.017 1460.000 2025/12/12 17:30:00 3.017 1460.000 2025/12/12 17:25:00 3.017 1460.000 2025/12/12 17:20:00 3.017 1460.000 2025/12/12 17:15:00 3.017 1460.000 2025/12/12 17:10:00 3.017 1460.000 2025/12/12 17:05:00 3.017 1460.000 2025/12/12 17:00:00 3.017 1460.000 2025/12/12 16:55:00 3.017 1460.000 2025/12/12 16:50:00 3.017 1460.000 2025/12/12 16:45:00 3.017 1460.000 2025/12/12 16:40:00 3.017 1460.000 2025/12/12 16:35:00 3.017 1460.000 2025/12/12 16:30:00 3.017 1460.000 2025/12/12 16:25:00 3.017 1460.000 2025/12/12 16:20:00 3.017 1460.000 2025/12/12 16:15:00 3.017 1460.000 2025/12/12 16:10:00 3.017 1460.000 2025/12/12 16:05:00 3.017 1460.000 2025/12/12 16:00:00 3.017 1460.000 2025/12/12 15:55:00 3.017 1460.000 2025/12/12 15:50:00 3.017 1460.000 2025/12/12 15:45:00 3.017 1460.000 2025/12/12 15:40:00 3.017 1460.000 2025/12/12 15:35:00 3.017 1460.000 2025/12/12 15:30:00 3.017 1460.000 2025/12/12 15:25:00 3.017 1460.000 2025/12/12 15:20:00 3.017 1460.000 2025/12/12 15:15:00 3.017 1460.000 2025/12/12 15:10:00 3.017 1460.000 2025/12/12 15:05:00 3.017 1460.000 2025/12/12 15:00:00 3.017 1460.000 2025/12/12 14:55:00 3.017 1460.000 2025/12/12 14:50:00 3.017 1460.000 2025/12/12 14:45:00 3.017 1460.000 2025/12/12 14:40:00 3.017 1460.000 2025/12/12 14:35:00 3.017 1460.000 2025/12/12 14:30:00 3.017 1460.000 2025/12/12 14:25:00 3.017 1460.000 2025/12/12 14:20:00 3.017 1460.000 2025/12/12 14:15:00 3.017 1460.000 2025/12/12 14:10:00 3.017 1460.000 2025/12/12 14:05:00 3.017 1460.000 2025/12/12 14:00:00 3.017 1460.000 2025/12/12 13:55:00 3.017 1460.000 2025/12/12 13:50:00 3.017 1460.000 2025/12/12 13:45:00 3.017 1460.000 2025/12/12 13:40:00 3.017 1460.000 2025/12/12 13:35:00 3.017 1460.000 2025/12/12 13:30:00 3.017 1460.000 2025/12/12 13:25:00 3.017 1460.000 2025/12/12 13:20:00 3.017 1460.000 2025/12/12 13:15:00 3.017 1460.000 2025/12/12 13:10:00 3.017 1460.000 2025/12/12 13:05:00 3.017 1460.000 2025/12/12 13:00:00 3.017 1460.000 2025/12/12 12:55:00 3.017 1460.000 2025/12/12 12:50:00 3.017 1460.000 2025/12/12 12:45:00 3.017 1460.000 2025/12/12 12:40:00 3.017 1460.000 2025/12/12 12:35:00 3.016 1460.000 2025/12/12 12:30:00 3.017 1460.000 2025/12/12 12:25:00 3.016 1460.000 2025/12/12 12:20:00 3.016 1460.000 2025/12/12 12:15:00 3.016 1460.000 2025/12/12 12:10:00 3.016 1460.000 2025/12/12 12:05:00 3.016 1460.000 2025/12/12 12:00:00 3.016 1460.000 2025/12/12 11:55:00 3.016 1460.000 2025/12/12 11:50:00 3.016 1460.000 2025/12/12 11:45:00 3.016 1460.000 2025/12/12 11:40:00 3.016 1460.000 2025/12/12 11:35:00 3.016 1460.000 2025/12/12 11:30:00 3.016 1460.000 2025/12/12 11:25:00 3.016 1460.000 2025/12/12 11:20:00 3.016 1460.000 2025/12/12 11:15:00 3.016 1460.000 2025/12/12 11:10:00 3.016 1460.000 2025/12/12 11:05:00 3.016 1460.000 2025/12/12 11:00:00 3.016 1460.000 2025/12/12 10:55:00 3.016 1460.000 2025/12/12 10:50:00 3.016 1460.000 2025/12/12 10:45:00 3.016 1460.000 2025/12/12 10:40:00 3.016 1460.000 2025/12/12 10:35:00 3.016 1460.000 2025/12/12 10:30:00 3.016 1460.000 2025/12/12 10:25:00 3.016 1460.000 2025/12/12 10:20:00 3.016 1460.000 2025/12/12 10:15:00 3.016 1460.000 2025/12/12 10:10:00 3.016 1460.000 2025/12/12 10:05:00 3.016 1460.000 2025/12/12 10:00:00 3.016 1460.000 2025/12/12 09:55:00 3.016 1460.000 2025/12/12 09:50:00 3.016 1460.000 2025/12/12 09:45:00 3.016 1460.000 2025/12/12 09:40:00 3.016 1460.000 2025/12/12 09:35:00 3.016 1460.000 2025/12/12 09:30:00 3.016 1460.000 2025/12/12 09:25:00 3.016 1460.000 2025/12/12 09:20:00 3.016 1460.000 2025/12/12 09:15:00 3.016 1460.000 2025/12/12 09:10:00 3.016 1460.000 2025/12/12 09:05:00 3.016 1460.000 2025/12/12 09:00:00 3.016 1460.000 2025/12/12 08:55:00 3.016 1460.000 2025/12/12 08:50:00 3.016 1460.000 2025/12/12 08:45:00 3.016 1460.000 2025/12/12 08:40:00 3.016 1460.000 2025/12/12 08:35:00 3.016 1460.000 2025/12/12 08:30:00 3.016 1460.000 2025/12/12 08:25:00 3.016 1460.000 2025/12/12 08:20:00 3.016 1460.000 2025/12/12 08:15:00 3.016 1460.000 2025/12/12 08:10:00 3.016 1460.000 2025/12/12 08:05:00 3.016 1460.000 2025/12/12 08:00:00 3.016 1460.000 2025/12/12 07:55:00 3.016 1460.000 2025/12/12 07:50:00 3.016 1460.000 2025/12/12 07:45:00 3.016 1460.000 2025/12/12 07:40:00 3.016 1460.000 2025/12/12 07:35:00 3.016 1460.000 2025/12/12 07:30:00 3.016 1460.000 2025/12/12 07:25:00 3.016 1460.000 2025/12/12 07:20:00 3.016 1460.000 2025/12/12 07:15:00 3.016 1460.000 2025/12/12 07:10:00 3.016 1460.000 2025/12/12 07:05:00 3.016 1460.000 2025/12/12 07:00:00 3.016 1460.000 2025/12/12 06:55:00 3.016 1460.000 2025/12/12 06:50:00 3.016 1460.000 2025/12/12 06:45:00 3.016 1460.000 2025/12/12 06:40:00 3.016 1460.000 2025/12/12 06:35:00 3.016 1460.000 2025/12/12 06:30:00 3.016 1460.000 2025/12/12 06:25:00 3.016 1460.000 2025/12/12 06:20:00 3.016 1460.000 2025/12/12 06:15:00 3.016 1460.000 2025/12/12 06:10:00 3.016 1460.000 2025/12/12 06:05:00 3.016 1460.000 2025/12/12 06:00:00 3.016 1460.000 2025/12/12 05:55:00 3.016 1460.000 2025/12/12 05:50:00 3.016 1460.000 2025/12/12 05:45:00 3.016 1460.000 2025/12/12 05:40:00 3.016 1460.000 2025/12/12 05:35:00 3.016 1460.000 2025/12/12 05:30:00 3.016 1460.000 2025/12/12 05:25:00 3.016 1460.000 2025/12/12 05:20:00 3.016 1460.000 2025/12/12 05:15:00 3.016 1460.000 2025/12/12 05:10:00 3.016 1460.000 2025/12/12 05:05:00 3.016 1460.000 2025/12/12 05:00:00 3.016 1460.000 2025/12/12 04:55:00 3.016 1460.000 2025/12/12 04:50:00 3.016 1460.000 2025/12/12 04:45:00 3.016 1460.000 2025/12/12 04:40:00 3.016 1460.000 2025/12/12 04:35:00 3.016 1460.000 2025/12/12 04:30:00 3.016 1460.000 2025/12/12 04:25:00 3.016 1460.000 2025/12/12 04:20:00 3.016 1460.000 2025/12/12 04:15:00 3.016 1460.000 2025/12/12 04:10:00 3.016 1460.000 2025/12/12 04:05:00 3.016 1460.000 2025/12/12 04:00:00 3.016 1460.000 2025/12/12 03:55:00 3.016 1460.000 2025/12/12 03:50:00 3.016 1460.000 2025/12/12 03:45:00 3.016 1460.000 2025/12/12 03:40:00 3.016 1460.000 2025/12/12 03:35:00 3.016 1460.000 2025/12/12 03:30:00 3.016 1460.000 2025/12/12 03:25:00 3.016 1460.000 2025/12/12 03:20:00 3.016 1460.000 2025/12/12 03:15:00 3.016 1460.000 2025/12/12 03:10:00 3.016 1460.000 2025/12/12 03:05:00 3.016 1460.000 2025/12/12 03:00:00 3.016 1460.000 2025/12/12 02:55:00 3.016 1460.000 2025/12/12 02:50:00 3.016 1460.000 2025/12/12 02:45:00 3.016 1460.000 2025/12/12 02:40:00 3.016 1460.000 2025/12/12 02:35:00 3.016 1460.000 2025/12/12 02:30:00 3.016 1460.000 2025/12/12 02:25:00 3.016 1460.000 2025/12/12 02:20:00 3.016 1460.000 2025/12/12 02:15:00 3.016 1460.000 2025/12/12 02:10:00 3.016 1460.000 2025/12/12 02:05:00 3.016 1460.000 2025/12/12 02:00:00 3.016 1460.000 2025/12/12 01:55:00 3.016 1460.000 2025/12/12 01:50:00 3.016 1460.000 2025/12/12 01:45:00 3.016 1460.000 2025/12/12 01:40:00 3.016 1460.000 2025/12/12 01:35:00 3.015 1460.000 2025/12/12 01:30:00 3.015 1460.000 2025/12/12 01:25:00 3.015 1460.000 2025/12/12 01:20:00 3.015 1460.000 2025/12/12 01:15:00 3.015 1460.000 2025/12/12 01:10:00 3.015 1460.000 2025/12/12 01:05:00 3.015 1460.000 2025/12/12 01:00:00 3.015 1460.000 2025/12/12 00:55:00 3.015 1460.000 2025/12/12 00:50:00 3.015 1460.000 2025/12/12 00:45:00 3.015 1460.000 2025/12/12 00:40:00 3.015 1460.000 2025/12/12 00:35:00 3.015 1460.000 2025/12/12 00:30:00 3.015 1460.000 2025/12/12 00:25:00 3.015 1460.000 2025/12/12 00:20:00 3.015 1460.000 2025/12/12 00:15:00 3.015 1460.000 2025/12/12 00:10:00 3.015 1460.000 2025/12/12 00:05:00 3.015 1460.000 2025/12/12 00:00:00 3.015 1460.000 2025/12/11 23:55:00 3.015 1460.000 2025/12/11 23:50:00 3.015 1460.000 2025/12/11 23:45:00 3.015 1460.000 2025/12/11 23:40:00 3.015 1460.000 2025/12/11 23:35:00 3.015 1460.000 2025/12/11 23:30:00 3.015 1460.000 2025/12/11 23:25:00 3.015 1460.000 2025/12/11 23:20:00 3.015 1460.000 2025/12/11 23:15:00 3.015 1460.000 2025/12/11 23:10:00 3.015 1460.000 2025/12/11 23:05:00 3.015 1460.000 2025/12/11 23:00:00 3.015 1460.000 2025/12/11 22:55:00 3.015 1460.000 2025/12/11 22:50:00 3.015 1460.000 2025/12/11 22:45:00 3.015 1460.000 2025/12/11 22:40:00 3.015 1460.000 2025/12/11 22:35:00 3.015 1460.000 2025/12/11 22:30:00 3.015 1460.000 2025/12/11 22:25:00 3.015 1460.000 2025/12/11 22:20:00 3.015 1460.000 2025/12/11 22:15:00 3.015 1460.000 2025/12/11 22:10:00 3.015 1460.000 2025/12/11 22:05:00 3.015 1460.000 2025/12/11 22:00:00 3.015 1460.000 2025/12/11 21:55:00 3.015 1460.000 2025/12/11 21:50:00 3.015 1460.000 2025/12/11 21:45:00 3.015 1460.000 2025/12/11 21:40:00 3.015 1460.000 2025/12/11 21:35:00 3.015 1460.000 2025/12/11 21:30:00 3.015 1460.000 2025/12/11 21:25:00 3.015 1460.000 2025/12/11 21:20:00 3.015 1460.000 2025/12/11 21:15:00 3.015 1460.000 2025/12/11 21:10:00 3.015 1460.000 2025/12/11 21:05:00 3.015 1460.000 2025/12/11 21:00:00 3.015 1460.000 2025/12/11 20:55:00 3.015 1460.000 2025/12/11 20:50:00 3.015 1460.000 2025/12/11 20:45:00 3.015 1460.000 2025/12/11 20:40:00 3.015 1460.000 2025/12/11 20:35:00 3.015 1460.000 2025/12/11 20:30:00 3.015 1460.000 2025/12/11 20:25:00 3.015 1460.000 2025/12/11 20:20:00 3.015 1460.000 2025/12/11 20:15:00 3.015 1460.000 2025/12/11 20:10:00 3.015 1460.000 2025/12/11 20:05:00 3.015 1460.000 2025/12/11 20:00:00 3.015 1460.000 2025/12/11 19:55:00 3.015 1460.000 2025/12/11 19:50:00 3.015 1460.000 2025/12/11 19:45:00 3.015 1460.000 2025/12/11 19:40:00 3.015 1460.000 2025/12/11 19:35:00 3.015 1460.000 2025/12/11 19:30:00 3.015 1460.000 2025/12/11 19:25:00 3.015 1460.000 2025/12/11 19:20:00 3.015 1460.000 2025/12/11 19:15:00 3.015 1460.000 2025/12/11 19:10:00 3.015 1460.000 2025/12/11 19:05:00 3.015 1460.000 2025/12/11 19:00:00 3.015 1460.000 2025/12/11 18:55:00 3.015 1460.000 2025/12/11 18:50:00 3.015 1460.000 2025/12/11 18:45:00 3.015 1460.000 2025/12/11 18:40:00 3.015 1460.000 2025/12/11 18:35:00 3.014 1460.000 2025/12/11 18:30:00 3.014 1460.000 2025/12/11 18:25:00 3.014 1460.000 2025/12/11 18:20:00 3.014 1460.000 2025/12/11 18:15:00 3.014 1460.000 2025/12/11 18:10:00 3.014 1460.000 2025/12/11 18:05:00 3.014 1460.000 2025/12/11 18:00:00 3.014 1460.000 2025/12/11 17:55:00 3.014 1460.000 2025/12/11 17:50:00 3.014 1460.000 2025/12/11 17:45:00 3.014 1460.000 2025/12/11 17:40:00 3.014 1460.000 2025/12/11 17:35:00 3.014 1460.000 2025/12/11 17:30:00 3.014 1460.000 2025/12/11 17:25:00 3.014 1460.000 2025/12/11 17:20:00 3.014 1460.000 2025/12/11 17:15:00 3.014 1460.000 2025/12/11 17:10:00 3.014 1460.000 2025/12/11 17:05:00 3.014 1460.000 2025/12/11 17:00:00 3.014 1460.000 2025/12/11 16:55:00 3.014 1460.000 2025/12/11 16:50:00 3.014 1460.000 2025/12/11 16:45:00 3.014 1460.000 2025/12/11 16:40:00 3.014 1460.000 2025/12/11 16:35:00 3.014 1460.000 2025/12/11 16:30:00 3.014 1460.000 2025/12/11 16:25:00 3.014 1460.000 2025/12/11 16:20:00 3.014 1460.000 2025/12/11 16:15:00 3.014 1460.000 2025/12/11 16:10:00 3.014 1460.000 2025/12/11 16:05:00 3.014 1460.000 2025/12/11 16:00:00 3.014 1460.000 2025/12/11 15:55:00 3.014 1460.000 2025/12/11 15:50:00 3.014 1460.000 2025/12/11 15:45:00 3.014 1460.000 2025/12/11 15:40:00 3.014 1460.000 2025/12/11 15:35:00 3.014 1460.000 2025/12/11 15:30:00 3.014 1460.000 2025/12/11 15:25:00 3.014 1460.000 2025/12/11 15:20:00 3.014 1460.000 2025/12/11 15:15:00 3.014 1460.000 2025/12/11 15:10:00 3.014 1460.000 2025/12/11 15:05:00 3.014 1460.000 2025/12/11 15:00:00 3.014 1460.000 2025/12/11 14:55:00 3.014 1460.000 2025/12/11 14:50:00 3.014 1460.000 2025/12/11 14:45:00 3.014 1460.000 2025/12/11 14:40:00 3.014 1460.000 2025/12/11 14:35:00 3.014 1460.000 2025/12/11 14:30:00 3.014 1460.000 2025/12/11 14:25:00 3.014 1460.000 2025/12/11 14:20:00 3.014 1460.000 2025/12/11 14:15:00 3.014 1460.000 2025/12/11 14:10:00 3.014 1460.000 2025/12/11 14:05:00 3.014 1460.000 2025/12/11 14:00:00 3.014 1460.000 2025/12/11 13:55:00 3.014 1460.000 2025/12/11 13:50:00 3.014 1460.000 2025/12/11 13:45:00 3.014 1460.000 2025/12/11 13:40:00 3.014 1460.000 2025/12/11 13:35:00 3.014 1460.000 2025/12/11 13:30:00 3.014 1460.000 2025/12/11 13:25:00 3.014 1460.000 2025/12/11 13:20:00 3.014 1460.000 2025/12/11 13:15:00 3.014 1460.000 2025/12/11 13:10:00 3.014 1460.000 2025/12/11 13:05:00 3.014 1460.000 2025/12/11 13:00:00 3.014 1460.000 2025/12/11 12:55:00 3.014 1460.000 2025/12/11 12:50:00 3.014 1460.000 2025/12/11 12:45:00 3.014 1460.000 2025/12/11 12:40:00 3.014 1460.000 2025/12/11 12:35:00 3.014 1460.000 2025/12/11 12:30:00 3.014 1460.000 2025/12/11 12:25:00 3.014 1460.000 2025/12/11 12:20:00 3.014 1460.000 2025/12/11 12:15:00 3.014 1460.000 2025/12/11 12:10:00 3.014 1460.000 2025/12/11 12:05:00 3.014 1460.000 2025/12/11 12:00:00 3.014 1460.000 2025/12/11 11:55:00 3.014 1460.000 2025/12/11 11:50:00 3.014 1460.000 2025/12/11 11:45:00 3.014 1460.000 2025/12/11 11:40:00 3.014 1460.000 2025/12/11 11:35:00 3.014 1460.000 2025/12/11 11:30:00 3.014 1460.000 2025/12/11 11:25:00 3.014 1460.000 2025/12/11 11:20:00 3.014 1460.000 2025/12/11 11:15:00 3.014 1460.000 2025/12/11 11:10:00 3.014 1460.000 2025/12/11 11:05:00 3.014 1460.000 2025/12/11 11:00:00 3.014 1460.000 2025/12/11 10:55:00 3.014 1460.000 2025/12/11 10:50:00 3.014 1460.000 2025/12/11 10:45:00 3.014 1460.000 2025/12/11 10:40:00 3.014 1460.000 2025/12/11 10:35:00 3.014 1460.000 2025/12/11 10:30:00 3.014 1460.000 2025/12/11 10:25:00 3.014 1460.000 2025/12/11 10:20:00 3.014 1460.000 2025/12/11 10:15:00 3.014 1460.000 2025/12/11 10:10:00 3.014 1460.000 2025/12/11 10:05:00 3.014 1460.000 2025/12/11 10:00:00 3.014 1460.000 2025/12/11 09:55:00 3.014 1460.000 2025/12/11 09:50:00 3.014 1460.000 2025/12/11 09:45:00 3.014 1460.000 2025/12/11 09:40:00 3.014 1460.000 2025/12/11 09:35:00 3.014 1460.000 2025/12/11 09:30:00 3.014 1460.000 2025/12/11 09:25:00 3.014 1460.000 2025/12/11 09:20:00 3.014 1460.000 2025/12/11 09:15:00 3.014 1460.000 2025/12/11 09:10:00 3.014 1460.000 2025/12/11 09:05:00 3.013 1460.000 2025/12/11 09:00:00 3.013 1460.000 2025/12/11 08:55:00 3.013 1460.000 2025/12/11 08:50:00 3.013 1460.000 2025/12/11 08:45:00 3.013 1460.000 2025/12/11 08:40:00 3.013 1460.000 2025/12/11 08:35:00 3.013 1460.000 2025/12/11 08:30:00 3.013 1460.000 2025/12/11 08:25:00 3.013 1460.000 2025/12/11 08:20:00 3.013 1460.000 2025/12/11 08:15:00 3.013 1460.000 2025/12/11 08:10:00 3.013 1460.000 2025/12/11 08:05:00 3.013 1460.000 2025/12/11 08:00:00 3.013 1460.000 2025/12/11 07:55:00 3.013 1460.000 2025/12/11 07:50:00 3.013 1460.000 2025/12/11 07:45:00 3.013 1460.000 2025/12/11 07:40:00 3.013 1460.000 2025/12/11 07:35:00 3.013 1460.000 2025/12/11 07:30:00 3.013 1460.000 2025/12/11 07:25:00 3.013 1460.000 2025/12/11 07:20:00 3.013 1460.000 2025/12/11 07:15:00 3.013 1460.000 2025/12/11 07:10:00 3.013 1460.000 2025/12/11 07:05:00 3.013 1460.000 2025/12/11 07:00:00 3.013 1460.000 2025/12/11 06:55:00 3.013 1460.000 2025/12/11 06:50:00 3.013 1460.000 2025/12/11 06:45:00 3.013 1460.000 2025/12/11 06:40:00 3.013 1460.000 2025/12/11 06:35:00 3.013 1460.000 2025/12/11 06:30:00 3.013 1460.000 2025/12/11 06:25:00 3.013 1460.000 2025/12/11 06:20:00 3.013 1460.000 2025/12/11 06:15:00 3.013 1460.000 2025/12/11 06:10:00 3.013 1460.000 2025/12/11 06:05:00 3.013 1460.000 2025/12/11 06:00:00 3.013 1460.000 2025/12/11 05:55:00 3.013 1460.000 2025/12/11 05:50:00 3.013 1460.000 2025/12/11 05:45:00 3.013 1460.000 2025/12/11 05:40:00 3.013 1460.000 2025/12/11 05:35:00 3.013 1460.000 2025/12/11 05:30:00 3.013 1460.000 2025/12/11 05:25:00 3.013 1460.000 2025/12/11 05:20:00 3.013 1460.000 2025/12/11 05:15:00 3.013 1460.000 2025/12/11 05:10:00 3.013 1460.000 2025/12/11 05:05:00 3.013 1460.000 2025/12/11 05:00:00 3.013 1460.000 2025/12/11 04:55:00 3.013 1460.000 2025/12/11 04:50:00 3.013 1460.000 2025/12/11 04:45:00 3.013 1460.000 2025/12/11 04:40:00 3.013 1460.000 2025/12/11 04:35:00 3.013 1460.000 2025/12/11 04:30:00 3.013 1460.000 2025/12/11 04:25:00 3.013 1460.000 2025/12/11 04:20:00 3.013 1460.000 2025/12/11 04:15:00 3.013 1460.000 2025/12/11 04:10:00 3.013 1460.000 2025/12/11 04:05:00 3.013 1460.000 2025/12/11 04:00:00 3.013 1460.000 2025/12/11 03:55:00 3.013 1460.000 2025/12/11 03:50:00 3.013 1460.000 2025/12/11 03:45:00 3.013 1460.000 2025/12/11 03:40:00 3.013 1460.000 2025/12/11 03:35:00 3.013 1460.000 2025/12/11 03:30:00 3.013 1460.000 2025/12/11 03:25:00 3.013 1460.000 2025/12/11 03:20:00 3.013 1460.000 2025/12/11 03:15:00 3.013 1460.000 2025/12/11 03:10:00 3.013 1460.000 2025/12/11 03:05:00 3.013 1460.000 2025/12/11 03:00:00 3.013 1460.000 2025/12/11 02:55:00 3.013 1460.000 2025/12/11 02:50:00 3.013 1460.000 2025/12/11 02:45:00 3.013 1460.000 2025/12/11 02:40:00 3.013 1460.000 2025/12/11 02:35:00 3.013 1460.000 2025/12/11 02:30:00 3.013 1460.000 2025/12/11 02:25:00 3.013 1460.000 2025/12/11 02:20:00 3.013 1460.000 2025/12/11 02:15:00 3.013 1460.000 2025/12/11 02:10:00 3.013 1460.000 2025/12/11 02:05:00 3.013 1460.000 2025/12/11 02:00:00 3.013 1460.000 2025/12/11 01:55:00 3.013 1460.000 2025/12/11 01:50:00 3.013 1460.000 2025/12/11 01:45:00 3.013 1460.000 2025/12/11 01:40:00 3.013 1460.000 2025/12/11 01:35:00 3.013 1460.000 2025/12/11 01:30:00 3.013 1460.000 2025/12/11 01:25:00 3.013 1460.000 2025/12/11 01:20:00 3.013 1460.000 2025/12/11 01:15:00 3.013 1460.000 2025/12/11 01:10:00 3.013 1460.000 2025/12/11 01:05:00 3.013 1460.000 2025/12/11 01:00:00 3.013 1460.000 2025/12/11 00:55:00 3.013 1460.000 2025/12/11 00:50:00 3.013 1460.000 2025/12/11 00:45:00 3.013 1460.000 2025/12/11 00:40:00 3.013 1460.000 2025/12/11 00:35:00 3.013 1460.000 2025/12/11 00:30:00 3.013 1460.000 2025/12/11 00:25:00 3.013 1460.000 2025/12/11 00:20:00 3.013 1460.000 2025/12/11 00:15:00 3.013 1460.000 2025/12/11 00:10:00 3.013 1460.000 2025/12/11 00:05:00 3.013 1460.000 2025/12/11 00:00:00 3.013 1460.000 2025/12/10 23:55:00 3.013 1460.000 2025/12/10 23:50:00 3.013 1460.000 2025/12/10 23:45:00 3.013 1460.000 2025/12/10 23:40:00 3.013 1460.000 2025/12/10 23:35:00 3.013 1460.000 2025/12/10 23:30:00 3.013 1460.000 2025/12/10 23:25:00 3.013 1460.000 2025/12/10 23:20:00 3.013 1460.000 2025/12/10 23:15:00 3.013 1460.000 2025/12/10 23:10:00 3.013 1460.000 2025/12/10 23:05:00 3.013 1460.000 2025/12/10 23:00:00 3.013 1460.000 2025/12/10 22:55:00 3.013 1460.000 2025/12/10 22:50:00 3.013 1460.000 2025/12/10 22:45:00 3.013 1460.000 2025/12/10 22:40:00 3.013 1460.000 2025/12/10 22:35:00 3.013 1460.000 2025/12/10 22:30:00 3.013 1460.000 2025/12/10 22:25:00 3.013 1460.000 2025/12/10 22:20:00 3.013 1460.000 2025/12/10 22:15:00 3.013 1460.000 2025/12/10 22:10:00 3.013 1460.000 2025/12/10 22:05:00 3.013 1460.000 2025/12/10 22:00:00 3.013 1460.000 2025/12/10 21:55:00 3.013 1460.000 2025/12/10 21:50:00 3.013 1460.000 2025/12/10 21:45:00 3.013 1460.000 2025/12/10 21:40:00 3.011 1460.000 2025/12/10 21:35:00 3.011 1460.000 2025/12/10 21:30:00 3.011 1460.000 2025/12/10 21:25:00 3.011 1460.000 2025/12/10 21:20:00 3.011 1460.000 2025/12/10 21:15:00 3.011 1460.000 2025/12/10 21:10:00 3.010 1460.000 2025/12/10 21:05:00 3.010 1460.000 2025/12/10 21:00:00 3.010 1460.000 2025/12/10 20:55:00 3.010 1460.000 2025/12/10 20:50:00 3.010 1460.000 2025/12/10 20:45:00 3.009 1450.000 2025/12/10 20:40:00 3.009 1450.000 2025/12/10 20:35:00 3.009 1450.000 2025/12/10 20:30:00 3.007 1450.000 2025/12/10 20:25:00 3.007 1450.000 2025/12/10 20:20:00 3.006 1450.000 2025/12/10 20:15:00 3.006 1450.000 2025/12/10 20:10:00 3.005 1450.000 2025/12/10 20:05:00 3.004 1450.000 2025/12/10 20:00:00 3.003 1450.000 2025/12/10 19:55:00 3.003 1450.000 2025/12/10 19:50:00 3.001 1450.000 2025/12/10 19:45:00 3.000 1450.000 2025/12/10 19:40:00 3.000 1450.000 2025/12/10 19:35:00 2.999 1440.000 2025/12/10 19:30:00 2.997 1440.000 2025/12/10 19:25:00 2.996 1440.000 2025/12/10 19:20:00 2.994 1440.000 2025/12/10 19:15:00 2.992 1440.000 2025/12/10 19:10:00 2.991 1440.000 2025/12/10 19:05:00 2.987 1430.000 2025/12/10 19:00:00 2.984 1430.000 2025/12/10 18:55:00 2.981 1430.000 2025/12/10 18:50:00 2.979 1420.000 2025/12/10 18:45:00 2.975 1420.000 2025/12/10 18:40:00 2.972 1420.000 2025/12/10 18:35:00 2.968 1410.000 2025/12/10 18:30:00 2.965 1410.000 2025/12/10 18:25:00 2.960 1400.000 2025/12/10 18:20:00 2.955 1400.000 2025/12/10 18:15:00 2.951 1390.000 2025/12/10 18:10:00 2.946 1390.000 2025/12/10 18:05:00 2.940 1380.000 2025/12/10 18:00:00 2.934 1380.000 2025/12/10 17:55:00 2.928 1370.000 2025/12/10 17:50:00 2.921 1360.000 2025/12/10 17:45:00 2.914 1360.000 2025/12/10 17:40:00 2.905 1350.000 2025/12/10 17:35:00 2.896 1340.000 2025/12/10 17:30:00 2.886 1330.000 2025/12/10 17:25:00 2.876 1320.000 2025/12/10 17:20:00 2.867 1310.000 2025/12/10 17:15:00 2.855 1300.000 2025/12/10 17:10:00 2.846 1290.000 2025/12/10 17:05:00 2.831 1270.000 2025/12/10 17:00:00 2.825 1270.000 2025/12/10 16:55:00 2.815 1260.000 2025/12/10 16:50:00 2.804 1250.000 2025/12/10 16:45:00 2.793 1240.000 2025/12/10 16:40:00 2.784 1230.000 2025/12/10 16:35:00 2.776 1220.000 2025/12/10 16:30:00 2.767 1210.000 2025/12/10 16:25:00 2.758 1190.000 2025/12/10 16:20:00 2.751 1180.000 2025/12/10 16:15:00 2.743 1160.000 2025/12/10 16:10:00 2.738 1160.000 2025/12/10 16:05:00 2.728 1140.000 2025/12/10 16:00:00 2.728 1140.000 2025/12/10 15:55:00 2.728 1140.000 2025/12/10 15:50:00 2.728 1140.000 2025/12/10 15:45:00 2.728 1140.000 2025/12/10 15:40:00 2.728 1140.000 2025/12/10 15:35:00 2.728 1140.000 2025/12/10 15:30:00 2.728 1140.000 2025/12/10 15:25:00 2.728 1140.000 2025/12/10 15:20:00 2.728 1140.000 2025/12/10 15:15:00 2.728 1140.000 2025/12/10 15:10:00 2.728 1140.000 2025/12/10 15:05:00 2.728 1140.000 2025/12/10 15:00:00 2.728 1140.000 2025/12/10 14:55:00 2.728 1140.000 2025/12/10 14:50:00 2.728 1140.000 2025/12/10 14:45:00 2.728 1140.000 2025/12/10 14:40:00 2.728 1140.000 2025/12/10 14:35:00 2.728 1140.000 2025/12/10 14:30:00 2.728 1140.000 2025/12/10 14:25:00 2.728 1140.000 2025/12/10 14:20:00 2.728 1140.000 2025/12/10 14:15:00 2.728 1140.000 2025/12/10 14:10:00 2.728 1140.000 2025/12/10 14:05:00 2.728 1140.000 2025/12/10 14:00:00 2.728 1140.000 2025/12/10 13:55:00 2.728 1140.000 2025/12/10 13:50:00 2.728 1140.000 2025/12/10 13:45:00 2.728 1140.000 2025/12/10 13:40:00 2.728 1140.000 2025/12/10 13:35:00 2.736 1150.000 2025/12/10 13:30:00 2.736 1150.000 2025/12/10 13:25:00 2.736 1150.000 2025/12/10 13:20:00 2.736 1150.000 2025/12/10 13:15:00 2.736 1150.000 2025/12/10 13:10:00 2.737 1150.000 2025/12/10 13:05:00 2.737 1150.000 2025/12/10 13:00:00 2.737 1150.000 2025/12/10 12:55:00 2.737 1150.000 2025/12/10 12:50:00 2.737 1150.000 2025/12/10 12:45:00 2.737 1150.000 2025/12/10 12:40:00 2.737 1150.000 2025/12/10 12:35:00 2.737 1150.000 2025/12/10 12:30:00 2.737 1150.000 2025/12/10 12:25:00 2.737 1150.000 2025/12/10 12:20:00 2.737 1150.000 2025/12/10 12:15:00 2.737 1150.000 2025/12/10 12:10:00 2.736 1150.000 2025/12/10 12:05:00 2.736 1150.000 2025/12/10 12:00:00 2.736 1150.000 2025/12/10 11:55:00 2.736 1150.000 2025/12/10 11:50:00 2.736 1150.000 2025/12/10 11:45:00 2.736 1150.000 2025/12/10 11:40:00 2.736 1150.000 2025/12/10 11:35:00 2.736 1150.000 2025/12/10 11:30:00 2.736 1150.000 2025/12/10 11:25:00 2.736 1150.000 2025/12/10 11:20:00 2.736 1150.000 2025/12/10 11:15:00 2.725 1130.000 2025/12/10 11:10:00 2.725 1130.000 2025/12/10 11:05:00 2.725 1130.000 2025/12/10 11:00:00 2.725 1130.000 2025/12/10 10:55:00 2.725 1130.000 2025/12/10 10:50:00 2.725 1130.000 2025/12/10 10:45:00 2.725 1130.000 2025/12/10 10:40:00 2.725 1130.000 2025/12/10 10:35:00 2.725 1130.000 2025/12/10 10:30:00 2.725 1130.000 2025/12/10 10:25:00 2.725 1130.000 2025/12/10 10:20:00 2.725 1130.000 2025/12/10 10:15:00 2.725 1130.000 2025/12/10 10:10:00 2.725 1130.000 2025/12/10 10:05:00 2.725 1130.000 2025/12/10 10:00:00 2.725 1130.000 2025/12/10 09:55:00 2.725 1130.000 2025/12/10 09:50:00 2.725 1130.000 2025/12/10 09:45:00 2.725 1130.000 2025/12/10 09:40:00 2.725 1130.000 2025/12/10 09:35:00 2.725 1130.000 2025/12/10 09:30:00 2.725 1130.000 2025/12/10 09:25:00 2.725 1130.000 2025/12/10 09:20:00 2.725 1130.000 2025/12/10 09:15:00 2.725 1130.000 2025/12/10 09:10:00 2.725 1130.000 2025/12/10 09:05:00 2.725 1130.000 2025/12/10 09:00:00 2.725 1130.000 2025/12/10 08:55:00 2.725 1130.000 2025/12/10 08:50:00 2.725 1130.000 2025/12/10 08:45:00 2.725 1130.000 2025/12/10 08:40:00 2.725 1130.000 2025/12/10 08:35:00 2.725 1130.000 2025/12/10 08:30:00 2.725 1130.000 2025/12/10 08:25:00 2.725 1130.000 2025/12/10 08:20:00 2.725 1130.000 2025/12/10 08:15:00 2.725 1130.000 2025/12/10 08:10:00 2.725 1130.000 2025/12/10 08:05:00 2.725 1130.000 2025/12/10 08:00:00 2.725 1130.000 2025/12/10 07:55:00 2.725 1130.000 2025/12/10 07:50:00 2.725 1130.000 2025/12/10 07:45:00 2.725 1130.000 2025/12/10 07:40:00 2.725 1130.000 2025/12/10 07:35:00 2.725 1130.000 2025/12/10 07:30:00 2.725 1130.000 2025/12/10 07:25:00 2.725 1130.000 2025/12/10 07:20:00 2.725 1130.000 2025/12/10 07:15:00 2.725 1130.000 2025/12/10 07:10:00 2.725 1130.000 2025/12/10 07:05:00 2.725 1130.000 2025/12/10 07:00:00 2.725 1130.000 2025/12/10 06:55:00 2.725 1130.000 2025/12/10 06:50:00 2.725 1130.000 2025/12/10 06:45:00 2.725 1130.000 2025/12/10 06:40:00 2.725 1130.000 2025/12/10 06:35:00 2.725 1130.000 2025/12/10 06:30:00 2.725 1130.000 2025/12/10 06:25:00 2.725 1130.000 2025/12/10 06:20:00 2.725 1130.000 2025/12/10 06:15:00 2.725 1130.000 2025/12/10 06:10:00 2.725 1130.000 2025/12/10 06:05:00 2.725 1130.000 2025/12/10 06:00:00 2.725 1130.000 2025/12/10 05:55:00 2.725 1130.000 2025/12/10 05:50:00 2.725 1130.000 2025/12/10 05:45:00 2.725 1130.000 2025/12/10 05:40:00 2.725 1130.000 2025/12/10 05:35:00 2.725 1130.000 2025/12/10 05:30:00 2.725 1130.000 2025/12/10 05:25:00 2.725 1130.000 2025/12/10 05:20:00 2.725 1130.000 2025/12/10 05:15:00 2.725 1130.000 2025/12/10 05:10:00 2.725 1130.000 2025/12/10 05:05:00 2.725 1130.000 2025/12/10 05:00:00 2.725 1130.000 2025/12/10 04:55:00 2.725 1130.000 2025/12/10 04:50:00 2.725 1130.000 2025/12/10 04:45:00 2.725 1130.000 2025/12/10 04:40:00 2.725 1130.000 2025/12/10 04:35:00 2.725 1130.000 2025/12/10 04:30:00 2.725 1130.000 2025/12/10 04:25:00 2.725 1130.000 2025/12/10 04:20:00 2.725 1130.000 2025/12/10 04:15:00 2.725 1130.000 2025/12/10 04:10:00 2.725 1130.000 2025/12/10 04:05:00 2.725 1130.000 2025/12/10 04:00:00 2.725 1130.000 2025/12/10 03:55:00 2.725 1130.000 2025/12/10 03:50:00 2.725 1130.000 2025/12/10 03:45:00 2.725 1130.000 2025/12/10 03:40:00 2.725 1130.000 2025/12/10 03:35:00 2.725 1130.000 2025/12/10 03:30:00 2.725 1130.000 2025/12/10 03:25:00 2.726 1140.000 2025/12/10 03:20:00 2.726 1140.000 2025/12/10 03:15:00 2.726 1140.000 2025/12/10 03:10:00 2.726 1140.000 2025/12/10 03:05:00 2.726 1140.000 2025/12/10 03:00:00 2.726 1140.000 2025/12/10 02:55:00 2.726 1140.000 2025/12/10 02:50:00 2.727 1140.000 2025/12/10 02:45:00 2.727 1140.000 2025/12/10 02:40:00 2.727 1140.000 2025/12/10 02:35:00 2.727 1140.000 2025/12/10 02:30:00 2.727 1140.000 2025/12/10 02:25:00 2.728 1140.000 2025/12/10 02:20:00 2.728 1140.000 2025/12/10 02:15:00 2.729 1140.000 2025/12/10 02:10:00 2.730 1140.000 2025/12/10 02:05:00 2.730 1140.000 2025/12/10 02:00:00 2.731 1140.000 2025/12/10 01:55:00 2.732 1150.000 2025/12/10 01:50:00 2.732 1150.000 2025/12/10 01:45:00 2.732 1150.000 2025/12/10 01:40:00 2.733 1150.000 2025/12/10 01:35:00 2.734 1150.000 2025/12/10 01:30:00 2.735 1150.000 2025/12/10 01:25:00 2.735 1150.000 2025/12/10 01:20:00 2.736 1150.000 2025/12/10 01:15:00 2.737 1150.000 2025/12/10 01:10:00 2.739 1160.000 2025/12/10 01:05:00 2.739 1160.000 2025/12/10 01:00:00 2.741 1160.000 2025/12/10 00:55:00 2.741 1160.000 2025/12/10 00:50:00 2.743 1160.000 2025/12/10 00:45:00 2.744 1170.000 2025/12/10 00:40:00 2.745 1170.000 2025/12/10 00:35:00 2.748 1170.000 2025/12/10 00:30:00 2.750 1180.000 2025/12/10 00:25:00 2.752 1180.000 2025/12/10 00:20:00 2.755 1180.000 2025/12/10 00:15:00 2.757 1190.000 2025/12/10 00:10:00 2.760 1190.000 2025/12/10 00:05:00 2.763 1200.000 2025/12/10 00:00:00 2.767 1210.000 2025/12/09 23:55:00 2.771 1210.000 2025/12/09 23:50:00 2.774 1220.000 2025/12/09 23:45:00 2.780 1220.000 2025/12/09 23:40:00 2.784 1230.000 2025/12/09 23:35:00 2.788 1230.000 2025/12/09 23:30:00 2.793 1240.000 2025/12/09 23:25:00 2.798 1240.000 2025/12/09 23:20:00 2.803 1250.000 2025/12/09 23:15:00 2.809 1250.000 2025/12/09 23:10:00 2.815 1260.000 2025/12/09 23:05:00 2.819 1260.000 2025/12/09 23:00:00 2.841 1280.000 2025/12/09 22:55:00 2.843 1290.000 2025/12/09 22:50:00 2.844 1290.000 2025/12/09 22:45:00 2.847 1290.000 2025/12/09 22:40:00 2.854 1300.000 2025/12/09 22:35:00 2.861 1300.000 2025/12/09 22:30:00 2.873 1320.000 2025/12/09 22:25:00 2.880 1320.000 2025/12/09 22:20:00 2.889 1330.000 2025/12/09 22:15:00 2.898 1340.000 2025/12/09 22:10:00 2.907 1350.000 2025/12/09 22:05:00 2.917 1360.000 2025/12/09 22:00:00 2.926 1370.000 2025/12/09 21:55:00 2.936 1380.000 2025/12/09 21:50:00 2.945 1390.000 2025/12/09 21:45:00 2.952 1400.000 2025/12/09 21:40:00 2.961 1410.000 2025/12/09 21:35:00 2.968 1410.000 2025/12/09 21:30:00 2.975 1420.000 2025/12/09 21:25:00 2.982 1430.000 2025/12/09 21:20:00 2.990 1430.000 2025/12/09 21:15:00 2.997 1440.000 2025/12/09 21:10:00 3.001 1450.000 2025/12/09 21:05:00 3.006 1450.000 2025/12/09 21:00:00 3.010 1460.000 2025/12/09 20:55:00 3.011 1460.000 2025/12/09 20:50:00 3.013 1460.000 2025/12/09 20:45:00 3.013 1460.000 2025/12/09 20:40:00 3.013 1460.000 2025/12/09 20:35:00 3.013 1460.000 2025/12/09 20:30:00 3.012 1460.000 2025/12/09 20:25:00 3.011 1460.000 2025/12/09 20:20:00 3.011 1460.000 2025/12/09 20:15:00 3.011 1460.000 2025/12/09 20:10:00 3.011 1460.000 2025/12/09 20:05:00 3.011 1460.000 2025/12/09 20:00:00 3.011 1460.000 2025/12/09 19:55:00 3.011 1460.000 2025/12/09 19:50:00 3.011 1460.000 2025/12/09 19:45:00 3.011 1460.000 2025/12/09 19:40:00 3.011 1460.000 2025/12/09 19:35:00 3.011 1460.000 2025/12/09 19:30:00 3.011 1460.000 2025/12/09 19:25:00 3.011 1460.000 2025/12/09 19:20:00 3.011 1460.000 2025/12/09 19:15:00 3.011 1460.000 2025/12/09 19:10:00 3.011 1460.000 2025/12/09 19:05:00 3.011 1460.000 2025/12/09 19:00:00 3.011 1460.000 2025/12/09 18:55:00 3.011 1460.000 2025/12/09 18:50:00 3.011 1460.000 2025/12/09 18:45:00 3.011 1460.000 2025/12/09 18:40:00 3.011 1460.000 2025/12/09 18:35:00 3.011 1460.000 2025/12/09 18:30:00 3.011 1460.000 2025/12/09 18:25:00 3.011 1460.000 2025/12/09 18:20:00 3.011 1460.000 2025/12/09 18:15:00 3.011 1460.000 2025/12/09 18:10:00 3.011 1460.000 2025/12/09 18:05:00 3.011 1460.000 2025/12/09 18:00:00 3.011 1460.000 2025/12/09 17:55:00 3.011 1460.000 2025/12/09 17:50:00 3.011 1460.000 2025/12/09 17:45:00 3.011 1460.000 2025/12/09 17:40:00 3.011 1460.000 2025/12/09 17:35:00 3.011 1460.000 2025/12/09 17:30:00 3.010 1460.000 2025/12/09 17:25:00 3.010 1460.000 2025/12/09 17:20:00 3.010 1460.000 2025/12/09 17:15:00 3.010 1460.000 2025/12/09 17:10:00 3.010 1460.000 2025/12/09 17:05:00 3.010 1460.000 2025/12/09 17:00:00 3.010 1460.000 2025/12/09 16:55:00 3.010 1460.000 2025/12/09 16:50:00 3.010 1460.000 2025/12/09 16:45:00 3.010 1460.000 2025/12/09 16:40:00 3.009 1450.000 2025/12/09 16:35:00 3.009 1450.000 2025/12/09 16:30:00 3.009 1450.000 2025/12/09 16:25:00 3.009 1450.000 2025/12/09 16:20:00 3.009 1450.000 2025/12/09 16:15:00 3.008 1450.000 2025/12/09 16:10:00 3.008 1450.000 2025/12/09 16:05:00 3.008 1450.000 2025/12/09 16:00:00 3.008 1450.000 2025/12/09 15:55:00 3.008 1450.000 2025/12/09 15:50:00 3.008 1450.000 2025/12/09 15:45:00 3.007 1450.000 2025/12/09 15:40:00 3.007 1450.000 2025/12/09 15:35:00 3.007 1450.000 2025/12/09 15:30:00 3.007 1450.000 2025/12/09 15:25:00 3.007 1450.000 2025/12/09 15:20:00 3.007 1450.000 2025/12/09 15:15:00 3.007 1450.000 2025/12/09 15:10:00 3.007 1450.000 2025/12/09 15:05:00 3.007 1450.000 2025/12/09 15:00:00 3.007 1450.000 2025/12/09 14:55:00 3.006 1450.000 2025/12/09 14:50:00 3.006 1450.000 2025/12/09 14:45:00 3.006 1450.000 2025/12/09 14:40:00 3.006 1450.000 2025/12/09 14:35:00 3.006 1450.000 2025/12/09 14:30:00 3.005 1450.000 2025/12/09 14:25:00 3.005 1450.000 2025/12/09 14:20:00 3.005 1450.000 2025/12/09 14:15:00 3.004 1450.000 2025/12/09 14:10:00 3.003 1450.000 2025/12/09 14:05:00 3.003 1450.000 2025/12/09 14:00:00 3.002 1450.000 2025/12/09 13:55:00 3.002 1450.000 2025/12/09 13:50:00 3.001 1450.000 2025/12/09 13:45:00 3.000 1450.000 2025/12/09 13:40:00 2.999 1440.000 2025/12/09 13:35:00 2.998 1440.000 2025/12/09 13:30:00 2.997 1440.000 2025/12/09 13:25:00 2.996 1440.000 2025/12/09 13:20:00 2.995 1440.000 2025/12/09 13:15:00 2.993 1440.000 2025/12/09 13:10:00 2.992 1440.000 2025/12/09 13:05:00 2.990 1430.000 2025/12/09 13:00:00 2.989 1430.000 2025/12/09 12:55:00 2.987 1430.000 2025/12/09 12:50:00 2.985 1430.000 2025/12/09 12:45:00 2.984 1430.000 2025/12/09 12:40:00 2.982 1430.000 2025/12/09 12:35:00 2.981 1430.000 2025/12/09 12:30:00 2.980 1420.000 2025/12/09 12:25:00 2.978 1420.000 2025/12/09 12:20:00 2.976 1420.000 2025/12/09 12:15:00 2.974 1420.000 2025/12/09 12:10:00 2.971 1420.000 2025/12/09 12:05:00 2.968 1410.000 2025/12/09 12:00:00 2.965 1410.000 2025/12/09 11:55:00 2.962 1410.000 2025/12/09 11:50:00 2.958 1400.000 2025/12/09 11:45:00 2.953 1400.000 2025/12/09 11:40:00 2.949 1390.000 2025/12/09 11:35:00 2.944 1390.000 2025/12/09 11:30:00 2.938 1380.000 2025/12/09 11:25:00 2.934 1380.000 2025/12/09 11:20:00 2.927 1370.000 2025/12/09 11:15:00 2.921 1360.000 2025/12/09 11:10:00 2.914 1360.000 2025/12/09 11:05:00 2.907 1350.000 2025/12/09 11:00:00 2.899 1340.000 2025/12/09 10:55:00 2.891 1330.000 2025/12/09 10:50:00 2.883 1330.000 2025/12/09 10:45:00 2.874 1320.000 2025/12/09 10:40:00 2.862 1310.000 2025/12/09 10:35:00 2.853 1300.000 2025/12/09 10:30:00 2.846 1290.000 2025/12/09 10:25:00 2.834 1280.000 2025/12/09 10:20:00 2.825 1270.000 2025/12/09 10:15:00 2.814 1260.000 2025/12/09 10:10:00 2.803 1250.000 2025/12/09 10:05:00 2.792 1230.000 2025/12/09 10:00:00 2.784 1230.000 2025/12/09 09:55:00 2.774 1220.000 2025/12/09 09:50:00 2.765 1200.000 2025/12/09 09:45:00 2.756 1190.000 2025/12/09 09:40:00 2.748 1170.000 2025/12/09 09:35:00 2.741 1160.000 2025/12/09 09:30:00 2.733 1150.000 2025/12/09 09:25:00 2.726 1140.000 2025/12/09 09:20:00 2.722 1130.000 2025/12/09 09:15:00 2.717 1120.000 2025/12/09 09:10:00 2.713 1110.000 2025/12/09 09:05:00 2.711 1110.000 2025/12/09 09:00:00 2.711 1110.000 2025/12/09 08:55:00 2.710 1110.000 2025/12/09 08:50:00 2.710 1110.000 2025/12/09 08:45:00 2.710 1110.000 2025/12/09 08:40:00 2.710 1110.000 2025/12/09 08:35:00 2.710 1110.000 2025/12/09 08:30:00 2.710 1110.000 2025/12/09 08:25:00 2.710 1110.000 2025/12/09 08:20:00 2.710 1110.000 2025/12/09 08:15:00 2.710 1110.000 2025/12/09 08:10:00 2.710 1110.000 2025/12/09 08:05:00 2.709 1110.000 2025/12/09 08:00:00 2.709 1110.000 2025/12/09 07:55:00 2.709 1110.000 2025/12/09 07:50:00 2.709 1110.000 2025/12/09 07:45:00 2.709 1110.000 2025/12/09 07:40:00 2.709 1110.000 2025/12/09 07:35:00 2.709 1110.000 2025/12/09 07:30:00 2.708 1110.000 2025/12/09 07:25:00 2.708 1110.000 2025/12/09 07:20:00 2.708 1110.000 2025/12/09 07:15:00 2.708 1110.000 2025/12/09 07:10:00 2.708 1110.000 2025/12/09 07:05:00 2.708 1110.000 2025/12/09 07:00:00 2.708 1110.000 2025/12/09 06:55:00 2.707 1100.000 2025/12/09 06:50:00 2.707 1100.000 2025/12/09 06:45:00 2.707 1100.000 2025/12/09 06:40:00 2.706 1100.000 2025/12/09 06:35:00 2.706 1100.000 2025/12/09 06:30:00 2.706 1100.000 2025/12/09 06:25:00 2.705 1100.000 2025/12/09 06:20:00 2.704 1100.000 2025/12/09 06:15:00 2.704 1100.000 2025/12/09 06:10:00 2.704 1100.000 2025/12/09 06:05:00 2.704 1100.000 2025/12/09 06:00:00 2.703 1100.000 2025/12/09 05:55:00 2.702 1100.000 2025/12/09 05:50:00 2.701 1100.000 2025/12/09 05:45:00 2.700 1090.000 2025/12/09 05:40:00 2.699 1090.000 2025/12/09 05:35:00 2.697 1090.000 2025/12/09 05:30:00 2.696 1090.000 2025/12/09 05:25:00 2.696 1090.000 2025/12/09 05:20:00 2.695 1090.000 2025/12/09 05:15:00 2.693 1080.000 2025/12/09 05:10:00 2.692 1080.000 2025/12/09 05:05:00 2.690 1080.000 2025/12/09 05:00:00 2.688 1070.000 2025/12/09 04:55:00 2.686 1070.000 2025/12/09 04:50:00 2.685 1070.000 2025/12/09 04:45:00 2.683 1070.000 2025/12/09 04:40:00 2.681 1060.000 2025/12/09 04:35:00 2.680 1060.000 2025/12/09 04:30:00 2.677 1060.000 2025/12/09 04:25:00 2.674 1050.000 2025/12/09 04:20:00 2.670 1050.000 2025/12/09 04:15:00 2.666 1040.000 2025/12/09 04:10:00 2.662 1030.000 2025/12/09 04:05:00 2.658 1030.000 2025/12/09 04:00:00 2.654 1020.000 2025/12/09 03:55:00 2.650 1020.000 2025/12/09 03:50:00 2.645 1010.000 2025/12/09 03:45:00 2.640 1000.000 2025/12/09 03:40:00 2.634 991.000 2025/12/09 03:35:00 2.628 982.000 2025/12/09 03:30:00 2.621 972.000 2025/12/09 03:25:00 2.614 962.000 2025/12/09 03:20:00 2.606 950.000 2025/12/09 03:15:00 2.600 941.000 2025/12/09 03:10:00 2.592 930.000 2025/12/09 03:05:00 2.586 922.000 2025/12/09 03:00:00 2.577 909.000 2025/12/09 02:55:00 2.570 899.000 2025/12/09 02:50:00 2.561 887.000 2025/12/09 02:45:00 2.552 874.000 2025/12/09 02:40:00 2.544 864.000 2025/12/09 02:35:00 2.534 850.000 2025/12/09 02:30:00 2.525 838.000 2025/12/09 02:25:00 2.516 826.000 2025/12/09 02:20:00 2.506 813.000 2025/12/09 02:15:00 2.498 803.000 2025/12/09 02:10:00 2.486 788.000 2025/12/09 02:05:00 2.477 777.000 2025/12/09 02:00:00 2.469 767.000 2025/12/09 01:55:00 2.460 756.000 2025/12/09 01:50:00 2.453 747.000 2025/12/09 01:45:00 2.443 735.000 2025/12/09 01:40:00 2.436 727.000 2025/12/09 01:35:00 2.428 717.000 2025/12/09 01:30:00 2.422 710.000 2025/12/09 01:25:00 2.417 705.000 2025/12/09 01:20:00 2.414 701.000 2025/12/09 01:15:00 2.412 699.000 2025/12/09 01:10:00 2.411 698.000 2025/12/09 01:05:00 2.411 698.000 2025/12/09 01:00:00 2.411 698.000 2025/12/09 00:55:00 2.411 698.000 2025/12/09 00:50:00 2.412 699.000 2025/12/09 00:45:00 2.412 699.000 2025/12/09 00:40:00 2.412 699.000 2025/12/09 00:35:00 2.412 699.000 2025/12/09 00:30:00 2.412 699.000 2025/12/09 00:25:00 2.412 699.000 2025/12/09 00:20:00 2.412 699.000 2025/12/09 00:15:00 2.412 699.000 2025/12/09 00:10:00 2.412 699.000 2025/12/09 00:05:00 2.412 699.000 2025/12/09 00:00:00 2.412 699.000