** BC HYDRO - HYDROCLIMATE MONITORING AND DATA MANAGEMENT ** CLIMATE, SNOW AND/OR SURFACE WATER STATION: Parsnip R ab Misinchinka R - operated by: ECCC Water Survey of Canada (07EE007) (prs) Note: Data are provided for information only. BC Hydro does not guarantee their accuracy. Data are based on automated readings which are from time to time inaccurate. Date Time Precipitation Air Temperature Water level Discharge Water temperature (yyyy/mm/dd) (PST) (mm) (°C) (m) (cms) (°C) 2026/09/02 13:35:00 1.310 78.800 2026/09/02 13:30:00 204 18.8 1.312 79.200 2026/09/02 13:25:00 1.313 79.400 2026/09/02 13:20:00 1.313 79.400 2026/09/02 13:15:00 204 20.2 1.313 79.400 2026/09/02 13:10:00 1.314 79.600 2026/09/02 13:05:00 1.313 79.400 2026/09/02 13:00:00 204 20.4 1.314 79.600 2026/09/02 12:55:00 1.314 79.600 2026/09/02 12:50:00 1.311 79.000 2026/09/02 12:45:00 204 20.6 1.314 79.600 2026/09/02 12:40:00 1.313 79.400 2026/09/02 12:35:00 1.313 79.400 2026/09/02 12:30:00 204 20.6 1.313 79.400 2026/09/02 12:25:00 1.313 79.400 2026/09/02 12:20:00 1.312 79.200 2026/09/02 12:15:00 204 19.3 1.312 79.200 2026/09/02 12:10:00 1.313 79.400 2026/09/02 12:05:00 1.314 79.600 2026/09/02 12:00:00 204 19.4 1.311 79.000 2026/09/02 11:55:00 1.313 79.400 2026/09/02 11:50:00 1.312 79.200 2026/09/02 11:45:00 204 19.1 1.314 79.600 2026/09/02 11:40:00 1.312 79.200 2026/09/02 11:35:00 1.312 79.200 2026/09/02 11:30:00 204 19.3 1.313 79.400 2026/09/02 11:25:00 1.312 79.200 2026/09/02 11:20:00 1.312 79.200 2026/09/02 11:15:00 204 19.3 1.313 79.400 2026/09/02 11:10:00 1.315 79.900 2026/09/02 11:05:00 1.312 79.200 2026/09/02 11:00:00 204 19.3 1.311 79.000 2026/09/02 10:55:00 1.316 80.100 2026/09/02 10:50:00 1.312 79.200 2026/09/02 10:45:00 204 18.4 1.312 79.200 2026/09/02 10:40:00 1.314 79.600 2026/09/02 10:35:00 1.315 79.900 2026/09/02 10:30:00 204 17.3 1.313 79.400 2026/09/02 10:25:00 1.311 79.000 2026/09/02 10:20:00 1.313 79.400 2026/09/02 10:15:00 204 16.5 1.313 79.400 2026/09/02 10:10:00 1.313 79.400 2026/09/02 10:05:00 1.313 79.400 2026/09/02 10:00:00 204 15.6 1.314 79.600 2026/09/02 09:55:00 1.312 79.200 2026/09/02 09:50:00 1.313 79.400 2026/09/02 09:45:00 204 14.9 1.314 79.600 2026/09/02 09:40:00 1.314 79.600 2026/09/02 09:35:00 1.313 79.400 2026/09/02 09:30:00 204 13.8 1.312 79.200 2026/09/02 09:25:00 1.316 80.100 2026/09/02 09:20:00 1.314 79.600 2026/09/02 09:15:00 204 12.1 1.312 79.200 2026/09/02 09:10:00 1.312 79.200 2026/09/02 09:05:00 1.315 79.900 2026/09/02 09:00:00 204 11.5 1.314 79.600 2026/09/02 08:55:00 1.314 79.600 2026/09/02 08:50:00 1.313 79.400 2026/09/02 08:45:00 204 10.8 1.311 79.000 2026/09/02 08:40:00 1.312 79.200 2026/09/02 08:35:00 1.313 79.400 2026/09/02 08:30:00 204 10.2 1.311 79.000 2026/09/02 08:25:00 1.312 79.200 2026/09/02 08:20:00 1.314 79.600 2026/09/02 08:15:00 204 9.8 1.313 79.400 2026/09/02 08:10:00 1.313 79.400 2026/09/02 08:05:00 1.312 79.200 2026/09/02 08:00:00 204 9.6 1.311 79.000 2026/09/02 07:55:00 1.313 79.400 2026/09/02 07:50:00 1.313 79.400 2026/09/02 07:45:00 204 9.3 1.311 79.000 2026/09/02 07:40:00 1.313 79.400 2026/09/02 07:35:00 1.312 79.200 2026/09/02 07:30:00 204 9.0 1.311 79.000 2026/09/02 07:25:00 1.311 79.000 2026/09/02 07:20:00 1.311 79.000 2026/09/02 07:15:00 204 8.4 1.310 78.800 2026/09/02 07:10:00 1.310 78.800 2026/09/02 07:05:00 1.313 79.400 2026/09/02 07:00:00 204 8.2 1.312 79.200 2026/09/02 06:55:00 1.313 79.400 2026/09/02 06:50:00 1.311 79.000 2026/09/02 06:45:00 204 8.2 1.311 79.000 2026/09/02 06:40:00 1.310 78.800 2026/09/02 06:35:00 1.310 78.800 2026/09/02 06:30:00 204 8.0 1.312 79.200 2026/09/02 06:25:00 1.311 79.000 2026/09/02 06:20:00 1.311 79.000 2026/09/02 06:15:00 204 8.1 1.313 79.400 2026/09/02 06:10:00 1.311 79.000 2026/09/02 06:05:00 1.310 78.800 2026/09/02 06:00:00 204 8.2 1.313 79.400 2026/09/02 05:55:00 1.311 79.000 2026/09/02 05:50:00 1.311 79.000 2026/09/02 05:45:00 204 8.2 1.313 79.400 2026/09/02 05:40:00 1.310 78.800 2026/09/02 05:35:00 1.311 79.000 2026/09/02 05:30:00 204 8.2 1.310 78.800 2026/09/02 05:25:00 1.311 79.000 2026/09/02 05:20:00 1.313 79.400 2026/09/02 05:15:00 204 7.9 1.310 78.800 2026/09/02 05:10:00 1.309 78.600 2026/09/02 05:05:00 1.311 79.000 2026/09/02 05:00:00 204 7.7 1.312 79.200 2026/09/02 04:55:00 1.309 78.600 2026/09/02 04:50:00 1.310 78.800 2026/09/02 04:45:00 204 7.3 1.310 78.800 2026/09/02 04:40:00 1.309 78.600 2026/09/02 04:35:00 1.313 79.400 2026/09/02 04:30:00 204 6.9 1.310 78.800 2026/09/02 04:25:00 1.308 78.400 2026/09/02 04:20:00 1.309 78.600 2026/09/02 04:15:00 204 6.5 1.311 79.000 2026/09/02 04:10:00 1.309 78.600 2026/09/02 04:05:00 1.307 78.200 2026/09/02 04:00:00 204 5.9 1.309 78.600 2026/09/02 03:55:00 1.309 78.600 2026/09/02 03:50:00 1.309 78.600 2026/09/02 03:45:00 204 5.3 1.307 78.200 2026/09/02 03:40:00 1.308 78.400 2026/09/02 03:35:00 1.309 78.600 2026/09/02 03:30:00 204 5.3 1.309 78.600 2026/09/02 03:25:00 1.308 78.400 2026/09/02 03:20:00 1.307 78.200 2026/09/02 03:15:00 204 5.6 1.308 78.400 2026/09/02 03:10:00 1.310 78.800 2026/09/02 03:05:00 1.308 78.400 2026/09/02 03:00:00 204 5.9 1.304 77.500 2026/09/02 02:55:00 1.307 78.200 2026/09/02 02:50:00 1.308 78.400 2026/09/02 02:45:00 204 6.0 1.308 78.400 2026/09/02 02:40:00 1.308 78.400 2026/09/02 02:35:00 1.308 78.400 2026/09/02 02:30:00 204 6.2 1.310 78.800 2026/09/02 02:25:00 1.305 77.700 2026/09/02 02:20:00 1.308 78.400 2026/09/02 02:15:00 204 6.4 1.308 78.400 2026/09/02 02:10:00 1.306 77.900 2026/09/02 02:05:00 1.308 78.400 2026/09/02 02:00:00 204 6.5 1.309 78.600 2026/09/02 01:55:00 1.306 77.900 2026/09/02 01:50:00 1.307 78.200 2026/09/02 01:45:00 204 6.8 1.308 78.400 2026/09/02 01:40:00 1.306 77.900 2026/09/02 01:35:00 1.307 78.200 2026/09/02 01:30:00 204 7.2 1.305 77.700 2026/09/02 01:25:00 1.305 77.700 2026/09/02 01:20:00 1.307 78.200 2026/09/02 01:15:00 204 7.4 1.308 78.400 2026/09/02 01:10:00 1.307 78.200 2026/09/02 01:05:00 1.306 77.900 2026/09/02 01:00:00 204 7.9 1.306 77.900 2026/09/02 00:55:00 1.308 78.400 2026/09/02 00:50:00 1.305 77.700 2026/09/02 00:45:00 204 8.3 1.307 78.200 2026/09/02 00:40:00 1.306 77.900 2026/09/02 00:35:00 1.306 77.900 2026/09/02 00:30:00 204 8.5 1.306 77.900 2026/09/02 00:25:00 1.305 77.700 2026/09/02 00:20:00 1.304 77.500 2026/09/02 00:15:00 204 8.6 1.308 78.400 2026/09/02 00:10:00 1.305 77.700 2026/09/02 00:05:00 1.306 77.900 2026/09/02 00:00:00 204 8.8 1.305 77.700 2026/09/01 23:55:00 1.307 78.200 2026/09/01 23:50:00 1.307 78.200 2026/09/01 23:45:00 204 8.9 1.304 77.500 2026/09/01 23:40:00 1.306 77.900 2026/09/01 23:35:00 1.305 77.700 2026/09/01 23:30:00 204 8.9 1.306 77.900 2026/09/01 23:25:00 1.306 77.900 2026/09/01 23:20:00 1.303 77.300 2026/09/01 23:15:00 204 9.3 1.304 77.500 2026/09/01 23:10:00 1.304 77.500 2026/09/01 23:05:00 1.307 78.200 2026/09/01 23:00:00 204 9.6 1.306 77.900 2026/09/01 22:55:00 1.306 77.900 2026/09/01 22:50:00 1.305 77.700 2026/09/01 22:45:00 204 10.0 1.304 77.500 2026/09/01 22:40:00 1.304 77.500 2026/09/01 22:35:00 1.304 77.500 2026/09/01 22:30:00 204 10.4 1.303 77.300 2026/09/01 22:25:00 1.305 77.700 2026/09/01 22:20:00 1.302 77.100 2026/09/01 22:15:00 204 10.6 1.304 77.500 2026/09/01 22:10:00 1.304 77.500 2026/09/01 22:05:00 1.303 77.300 2026/09/01 22:00:00 204 10.9 1.304 77.500 2026/09/01 21:55:00 1.302 77.100 2026/09/01 21:50:00 1.303 77.300 2026/09/01 21:45:00 204 10.8 1.303 77.300 2026/09/01 21:40:00 1.303 77.300 2026/09/01 21:35:00 1.303 77.300 2026/09/01 21:30:00 204 11.0 1.304 77.500 2026/09/01 21:25:00 1.304 77.500 2026/09/01 21:20:00 1.303 77.300 2026/09/01 21:15:00 204 11.5 1.302 77.100 2026/09/01 21:10:00 1.302 77.100 2026/09/01 21:05:00 1.302 77.100 2026/09/01 21:00:00 204 11.9 1.299 76.500 2026/09/01 20:55:00 1.302 77.100 2026/09/01 20:50:00 1.303 77.300 2026/09/01 20:45:00 204 12.5 1.301 76.900 2026/09/01 20:40:00 1.303 77.300 2026/09/01 20:35:00 1.301 76.900 2026/09/01 20:30:00 204 12.9 1.301 76.900 2026/09/01 20:25:00 1.300 76.700 2026/09/01 20:20:00 1.299 76.500 2026/09/01 20:15:00 204 13.2 1.300 76.700 2026/09/01 20:10:00 1.304 77.500 2026/09/01 20:05:00 1.302 77.100 2026/09/01 20:00:00 204 13.4 1.300 76.700 2026/09/01 19:55:00 1.300 76.700 2026/09/01 19:50:00 1.300 76.700 2026/09/01 19:45:00 204 13.7 1.299 76.500 2026/09/01 19:40:00 1.297 76.000 2026/09/01 19:35:00 1.299 76.500 2026/09/01 19:30:00 204 14.0 1.297 76.000 2026/09/01 19:25:00 1.296 75.800 2026/09/01 19:20:00 1.299 76.500 2026/09/01 19:15:00 204 14.4 1.298 76.300 2026/09/01 19:10:00 1.295 75.600 2026/09/01 19:05:00 1.297 76.000 2026/09/01 19:00:00 204 14.7 1.300 76.700 2026/09/01 18:55:00 1.296 75.800 2026/09/01 18:50:00 1.296 75.800 2026/09/01 18:45:00 204 15.1 1.297 76.000 2026/09/01 18:40:00 1.295 75.600 2026/09/01 18:35:00 1.295 75.600 2026/09/01 18:30:00 204 15.5 1.293 75.200 2026/09/01 18:25:00 1.294 75.400 2026/09/01 18:20:00 1.294 75.400 2026/09/01 18:15:00 204 15.9 1.294 75.400 2026/09/01 18:10:00 1.295 75.600 2026/09/01 18:05:00 1.294 75.400 2026/09/01 18:00:00 204 16.3 1.292 75.000 2026/09/01 17:55:00 1.295 75.600 2026/09/01 17:50:00 1.292 75.000 2026/09/01 17:45:00 204 16.7 1.292 75.000 2026/09/01 17:40:00 1.293 75.200 2026/09/01 17:35:00 1.292 75.000 2026/09/01 17:30:00 204 17.1 1.294 75.400 2026/09/01 17:25:00 1.291 74.800 2026/09/01 17:20:00 1.291 74.800 2026/09/01 17:15:00 204 17.5 1.292 75.000 2026/09/01 17:10:00 1.292 75.000 2026/09/01 17:05:00 1.290 74.600 2026/09/01 17:00:00 204 17.7 1.290 74.600 2026/09/01 16:55:00 1.291 74.800 2026/09/01 16:50:00 1.288 74.200 2026/09/01 16:45:00 204 17.7 1.290 74.600 2026/09/01 16:40:00 1.290 74.600 2026/09/01 16:35:00 1.288 74.200 2026/09/01 16:30:00 204 17.9 1.289 74.400 2026/09/01 16:25:00 1.290 74.600 2026/09/01 16:20:00 1.288 74.200 2026/09/01 16:15:00 204 18.4 1.290 74.600 2026/09/01 16:10:00 1.289 74.400 2026/09/01 16:05:00 1.289 74.400 2026/09/01 16:00:00 204 18.9 1.288 74.200 2026/09/01 15:55:00 1.285 73.500 2026/09/01 15:50:00 1.286 73.700 2026/09/01 15:45:00 204 18.8 1.286 73.700 2026/09/01 15:40:00 1.285 73.500 2026/09/01 15:35:00 1.288 74.200 2026/09/01 15:30:00 204 18.7 1.284 73.300 2026/09/01 15:25:00 1.286 73.700 2026/09/01 15:20:00 1.284 73.300 2026/09/01 15:15:00 204 19.1 1.284 73.300 2026/09/01 15:10:00 1.284 73.300 2026/09/01 15:05:00 1.284 73.300 2026/09/01 15:00:00 204 19.2 1.285 73.500 2026/09/01 14:55:00 1.285 73.500 2026/09/01 14:50:00 1.282 72.900 2026/09/01 14:45:00 204 19.3 1.282 72.900 2026/09/01 14:40:00 1.283 73.100 2026/09/01 14:35:00 1.284 73.300 2026/09/01 14:30:00 204 19.9 1.283 73.100 2026/09/01 14:25:00 1.282 72.900 2026/09/01 14:20:00 1.279 72.300 2026/09/01 14:15:00 204 20.1 1.282 72.900 2026/09/01 14:10:00 1.281 72.700 2026/09/01 14:05:00 1.282 72.900 2026/09/01 14:00:00 204 19.6 1.281 72.700 2026/09/01 13:55:00 1.281 72.700 2026/09/01 13:50:00 1.281 72.700 2026/09/01 13:45:00 204 19.1 1.279 72.300 2026/09/01 13:40:00 1.279 72.300 2026/09/01 13:35:00 1.278 72.100 2026/09/01 13:30:00 204 19.4 1.278 72.100 2026/09/01 13:25:00 1.278 72.100 2026/09/01 13:20:00 1.276 71.700 2026/09/01 13:15:00 204 19.2 1.277 71.900 2026/09/01 13:10:00 1.278 72.100 2026/09/01 13:05:00 1.277 71.900 2026/09/01 13:00:00 204 18.8 1.276 71.700 2026/09/01 12:55:00 1.274 71.300 2026/09/01 12:50:00 1.276 71.700 2026/09/01 12:45:00 204 19.0 1.276 71.700 2026/09/01 12:40:00 1.273 71.100 2026/09/01 12:35:00 1.272 70.900 2026/09/01 12:30:00 204 18.8 1.275 71.500 2026/09/01 12:25:00 1.274 71.300 2026/09/01 12:20:00 1.274 71.300 2026/09/01 12:15:00 204 18.3 1.273 71.100 2026/09/01 12:10:00 1.273 71.100 2026/09/01 12:05:00 1.273 71.100 2026/09/01 12:00:00 204 17.8 1.273 71.100 2026/09/01 11:55:00 1.271 70.600 2026/09/01 11:50:00 1.272 70.900 2026/09/01 11:45:00 204 17.7 1.272 70.900 2026/09/01 11:40:00 1.272 70.900 2026/09/01 11:35:00 1.273 71.100 2026/09/01 11:30:00 204 18.6 1.271 70.600 2026/09/01 11:25:00 1.271 70.600 2026/09/01 11:20:00 1.269 70.200 2026/09/01 11:15:00 204 18.0 1.270 70.400 2026/09/01 11:10:00 1.268 70.000 2026/09/01 11:05:00 1.269 70.200 2026/09/01 11:00:00 204 16.8 1.267 69.800 2026/09/01 10:55:00 1.267 69.800 2026/09/01 10:50:00 1.268 70.000 2026/09/01 10:45:00 204 15.8 1.267 69.800 2026/09/01 10:40:00 1.268 70.000 2026/09/01 10:35:00 1.265 69.400 2026/09/01 10:30:00 204 15.7 1.266 69.600 2026/09/01 10:25:00 1.268 70.000 2026/09/01 10:20:00 1.266 69.600 2026/09/01 10:15:00 204 16.2 1.266 69.600 2026/09/01 10:10:00 1.265 69.400 2026/09/01 10:05:00 1.264 69.200 2026/09/01 10:00:00 204 16.3 1.265 69.400 2026/09/01 09:55:00 1.265 69.400 2026/09/01 09:50:00 1.262 68.800 2026/09/01 09:45:00 204 16.3 1.266 69.600 2026/09/01 09:40:00 1.264 69.200 2026/09/01 09:35:00 1.265 69.400 2026/09/01 09:30:00 204 15.9 1.264 69.200 2026/09/01 09:25:00 1.260 68.400 2026/09/01 09:20:00 1.262 68.800 2026/09/01 09:15:00 204 15.3 1.261 68.600 2026/09/01 09:10:00 1.261 68.600 2026/09/01 09:05:00 1.262 68.800 2026/09/01 09:00:00 204 14.8 1.262 68.800 2026/09/01 08:55:00 1.259 68.200 2026/09/01 08:50:00 1.261 68.600 2026/09/01 08:45:00 204 14.5 1.259 68.200 2026/09/01 08:40:00 1.261 68.600 2026/09/01 08:35:00 1.260 68.400 2026/09/01 08:30:00 204 14.3 1.260 68.400 2026/09/01 08:25:00 1.258 68.000 2026/09/01 08:20:00 1.255 67.400 2026/09/01 08:15:00 204 13.8 1.257 67.800 2026/09/01 08:10:00 1.257 67.800 2026/09/01 08:05:00 1.256 67.600 2026/09/01 08:00:00 204 13.6 1.255 67.400 2026/09/01 07:55:00 1.256 67.600 2026/09/01 07:50:00 1.255 67.400 2026/09/01 07:45:00 204 13.0 1.255 67.400 2026/09/01 07:40:00 1.256 67.600 2026/09/01 07:35:00 1.253 67.000 2026/09/01 07:30:00 204 12.6 1.253 67.000 2026/09/01 07:25:00 1.252 66.800 2026/09/01 07:20:00 1.250 66.400 2026/09/01 07:15:00 204 12.1 1.251 66.600 2026/09/01 07:10:00 1.250 66.400 2026/09/01 07:05:00 1.251 66.600 2026/09/01 07:00:00 204 11.8 1.249 66.200 2026/09/01 06:55:00 1.249 66.200 2026/09/01 06:50:00 1.250 66.400 2026/09/01 06:45:00 204 11.6 1.247 65.800 2026/09/01 06:40:00 1.246 65.600 2026/09/01 06:35:00 1.245 65.400 2026/09/01 06:30:00 204 11.2 1.246 65.600 2026/09/01 06:25:00 1.244 65.200 2026/09/01 06:20:00 1.243 65.000 2026/09/01 06:15:00 204 10.7 1.243 65.000 2026/09/01 06:10:00 1.241 64.600 2026/09/01 06:05:00 1.242 64.800 2026/09/01 06:00:00 204 10.3 1.239 64.200 2026/09/01 05:55:00 1.241 64.600 2026/09/01 05:50:00 1.239 64.200 2026/09/01 05:45:00 204 10.2 1.239 64.200 2026/09/01 05:40:00 1.238 64.000 2026/09/01 05:35:00 1.237 63.800 2026/09/01 05:30:00 204 10.1 1.236 63.600 2026/09/01 05:25:00 1.237 63.800 2026/09/01 05:20:00 1.236 63.600 2026/09/01 05:15:00 204 10.3 1.236 63.600 2026/09/01 05:10:00 1.235 63.400 2026/09/01 05:05:00 1.235 63.400 2026/09/01 05:00:00 204 10.4 1.236 63.600 2026/09/01 04:55:00 1.234 63.200 2026/09/01 04:50:00 1.236 63.600 2026/09/01 04:45:00 204 10.5 1.233 63.000 2026/09/01 04:40:00 1.235 63.400 2026/09/01 04:35:00 1.235 63.400 2026/09/01 04:30:00 204 10.6 1.232 62.800 2026/09/01 04:25:00 1.234 63.200 2026/09/01 04:20:00 1.235 63.400 2026/09/01 04:15:00 204 10.9 1.233 63.000 2026/09/01 04:10:00 1.233 63.000 2026/09/01 04:05:00 1.234 63.200 2026/09/01 04:00:00 204 11.1 1.233 63.000 2026/09/01 03:55:00 1.233 63.000 2026/09/01 03:50:00 1.234 63.200 2026/09/01 03:45:00 204 11.0 1.233 63.000 2026/09/01 03:40:00 1.234 63.200 2026/09/01 03:35:00 1.234 63.200 2026/09/01 03:30:00 204 10.6 1.232 62.800 2026/09/01 03:25:00 1.231 62.600 2026/09/01 03:20:00 1.233 63.000 2026/09/01 03:15:00 204 10.9 1.233 63.000 2026/09/01 03:10:00 1.231 62.600 2026/09/01 03:05:00 1.234 63.200 2026/09/01 03:00:00 204 10.2 1.233 63.000 2026/09/01 02:55:00 1.233 63.000 2026/09/01 02:50:00 1.232 62.800 2026/09/01 02:45:00 204 10.2 1.233 63.000 2026/09/01 02:40:00 1.234 63.200 2026/09/01 02:35:00 1.233 63.000 2026/09/01 02:30:00 204 10.1 1.232 62.800 2026/09/01 02:25:00 1.232 62.800 2026/09/01 02:20:00 1.232 62.800 2026/09/01 02:15:00 204 10.1 1.230 62.400 2026/09/01 02:10:00 1.230 62.400 2026/09/01 02:05:00 1.230 62.400 2026/09/01 02:00:00 204 10.2 1.230 62.400 2026/09/01 01:55:00 1.229 62.200 2026/09/01 01:50:00 1.230 62.400 2026/09/01 01:45:00 204 10.2 1.227 61.800 2026/09/01 01:40:00 1.228 62.000 2026/09/01 01:35:00 1.227 61.800 2026/09/01 01:30:00 204 10.2 1.225 61.400 2026/09/01 01:25:00 1.225 61.400 2026/09/01 01:20:00 1.222 60.800 2026/09/01 01:15:00 204 10.3 1.220 60.500 2026/09/01 01:10:00 1.220 60.500 2026/09/01 01:05:00 1.217 59.900 2026/09/01 01:00:00 204 10.5 1.217 59.900 2026/09/01 00:55:00 1.216 59.700 2026/09/01 00:50:00 1.216 59.700 2026/09/01 00:45:00 204 10.5 1.212 58.900 2026/09/01 00:40:00 1.213 59.100 2026/09/01 00:35:00 1.213 59.100 2026/09/01 00:30:00 203 10.6 1.212 58.900 2026/09/01 00:25:00 1.213 59.100 2026/09/01 00:20:00 1.213 59.100 2026/09/01 00:15:00 203 10.7 1.211 58.700 2026/09/01 00:10:00 1.211 58.700 2026/09/01 00:05:00 1.211 58.700 2026/09/01 00:00:00 203 10.7 1.212 58.900 2026/08/31 23:55:00 1.210 58.500 2026/08/31 23:50:00 1.209 58.300 2026/08/31 23:45:00 203 10.6 1.211 58.700 2026/08/31 23:40:00 1.211 58.700 2026/08/31 23:35:00 1.210 58.500 2026/08/31 23:30:00 203 10.6 1.211 58.700 2026/08/31 23:25:00 1.210 58.500 2026/08/31 23:20:00 1.209 58.300 2026/08/31 23:15:00 203 10.3 1.210 58.500 2026/08/31 23:10:00 1.210 58.500 2026/08/31 23:05:00 1.211 58.700 2026/08/31 23:00:00 203 10.3 1.211 58.700 2026/08/31 22:55:00 1.210 58.500 2026/08/31 22:50:00 1.208 58.100 2026/08/31 22:45:00 203 10.0 1.210 58.500 2026/08/31 22:40:00 1.208 58.100 2026/08/31 22:35:00 1.210 58.500 2026/08/31 22:30:00 203 9.9 1.210 58.500 2026/08/31 22:25:00 1.210 58.500 2026/08/31 22:20:00 1.209 58.300 2026/08/31 22:15:00 203 9.7 1.209 58.300 2026/08/31 22:10:00 1.207 57.900 2026/08/31 22:05:00 1.209 58.300 2026/08/31 22:00:00 203 9.5 1.209 58.300 2026/08/31 21:55:00 1.209 58.300 2026/08/31 21:50:00 1.208 58.100 2026/08/31 21:45:00 203 9.6 1.209 58.300 2026/08/31 21:40:00 1.208 58.100 2026/08/31 21:35:00 1.210 58.500 2026/08/31 21:30:00 203 9.8 1.209 58.300 2026/08/31 21:25:00 1.208 58.100 2026/08/31 21:20:00 1.209 58.300 2026/08/31 21:15:00 203 10.0 1.209 58.300 2026/08/31 21:10:00 1.208 58.100 2026/08/31 21:05:00 1.209 58.300 2026/08/31 21:00:00 203 10.4 1.207 57.900 2026/08/31 20:55:00 1.209 58.300 2026/08/31 20:50:00 1.208 58.100 2026/08/31 20:45:00 203 10.7 1.207 57.900 2026/08/31 20:40:00 1.210 58.500 2026/08/31 20:35:00 1.206 57.700 2026/08/31 20:30:00 203 10.7 1.206 57.700 2026/08/31 20:25:00 1.208 58.100 2026/08/31 20:20:00 1.208 58.100 2026/08/31 20:15:00 203 11.0 1.208 58.100 2026/08/31 20:10:00 1.208 58.100 2026/08/31 20:05:00 1.208 58.100 2026/08/31 20:00:00 203 11.2 1.208 58.100 2026/08/31 19:55:00 1.208 58.100 2026/08/31 19:50:00 1.208 58.100 2026/08/31 19:45:00 203 11.4 1.208 58.100 2026/08/31 19:40:00 1.209 58.300 2026/08/31 19:35:00 1.209 58.300 2026/08/31 19:30:00 203 11.7 1.210 58.500 2026/08/31 19:25:00 1.209 58.300 2026/08/31 19:20:00 1.208 58.100 2026/08/31 19:15:00 203 11.9 1.209 58.300 2026/08/31 19:10:00 1.211 58.700 2026/08/31 19:05:00 1.210 58.500 2026/08/31 19:00:00 203 12.2 1.211 58.700 2026/08/31 18:55:00 1.213 59.100 2026/08/31 18:50:00 1.211 58.700 2026/08/31 18:45:00 203 12.4 1.212 58.900 2026/08/31 18:40:00 1.213 59.100 2026/08/31 18:35:00 1.213 59.100 2026/08/31 18:30:00 203 12.4 1.213 59.100 2026/08/31 18:25:00 1.211 58.700 2026/08/31 18:20:00 1.210 58.500 2026/08/31 18:15:00 203 12.5 1.210 58.500 2026/08/31 18:10:00 1.212 58.900 2026/08/31 18:05:00 1.211 58.700 2026/08/31 18:00:00 203 12.8 1.212 58.900 2026/08/31 17:55:00 1.211 58.700 2026/08/31 17:50:00 1.210 58.500 2026/08/31 17:45:00 203 13.0 1.211 58.700 2026/08/31 17:40:00 1.209 58.300 2026/08/31 17:35:00 1.208 58.100 2026/08/31 17:30:00 203 13.1 1.206 57.700 2026/08/31 17:25:00 1.207 57.900 2026/08/31 17:20:00 1.209 58.300 2026/08/31 17:15:00 202 13.0 1.206 57.700 2026/08/31 17:10:00 1.206 57.700 2026/08/31 17:05:00 1.205 57.600 2026/08/31 17:00:00 201 13.2 1.205 57.600 2026/08/31 16:55:00 1.206 57.700 2026/08/31 16:50:00 1.204 57.400 2026/08/31 16:45:00 199 13.8 1.203 57.200 2026/08/31 16:40:00 1.203 57.200 2026/08/31 16:35:00 1.203 57.200 2026/08/31 16:30:00 199 14.5 1.203 57.200 2026/08/31 16:25:00 1.203 57.200 2026/08/31 16:20:00 1.202 57.000 2026/08/31 16:15:00 199 14.6 1.203 57.200 2026/08/31 16:10:00 1.202 57.000 2026/08/31 16:05:00 1.202 57.000 2026/08/31 16:00:00 199 14.7 1.202 57.000 2026/08/31 15:55:00 1.202 57.000 2026/08/31 15:50:00 1.202 57.000 2026/08/31 15:45:00 199 14.6 1.201 56.800 2026/08/31 15:40:00 1.202 57.000 2026/08/31 15:35:00 1.201 56.800 2026/08/31 15:30:00 199 14.4 1.201 56.800 2026/08/31 15:25:00 1.202 57.000 2026/08/31 15:20:00 1.201 56.800 2026/08/31 15:15:00 199 14.2 1.200 56.600 2026/08/31 15:10:00 1.202 57.000 2026/08/31 15:05:00 1.201 56.800 2026/08/31 15:00:00 199 14.3 1.201 56.800 2026/08/31 14:55:00 1.200 56.600 2026/08/31 14:50:00 1.201 56.800 2026/08/31 14:45:00 199 14.5 1.201 56.800 2026/08/31 14:40:00 1.201 56.800 2026/08/31 14:35:00 1.201 56.800 2026/08/31 14:30:00 199 14.9 1.200 56.600 2026/08/31 14:25:00 1.200 56.600 2026/08/31 14:20:00 1.201 56.800 2026/08/31 14:15:00 199 15.5 1.199 56.400 2026/08/31 14:10:00 1.201 56.800 2026/08/31 14:05:00 1.200 56.600 2026/08/31 14:00:00 199 15.6 1.200 56.600 2026/08/31 13:55:00 1.200 56.600 2026/08/31 13:50:00 1.200 56.600 2026/08/31 13:45:00 199 15.6 1.200 56.600 2026/08/31 13:40:00 1.198 56.200 2026/08/31 13:35:00 1.201 56.800 2026/08/31 13:30:00 199 15.3 1.200 56.600 2026/08/31 13:25:00 1.199 56.400 2026/08/31 13:20:00 1.199 56.400 2026/08/31 13:15:00 199 15.4 1.200 56.600 2026/08/31 13:10:00 1.199 56.400 2026/08/31 13:05:00 1.199 56.400 2026/08/31 13:00:00 199 15.3 1.199 56.400 2026/08/31 12:55:00 1.201 56.800 2026/08/31 12:50:00 1.200 56.600 2026/08/31 12:45:00 199 14.7 1.198 56.200 2026/08/31 12:40:00 1.197 56.000 2026/08/31 12:35:00 1.201 56.800 2026/08/31 12:30:00 198 14.5 1.200 56.600 2026/08/31 12:25:00 1.198 56.200 2026/08/31 12:20:00 1.199 56.400 2026/08/31 12:15:00 198 15.2 1.200 56.600 2026/08/31 12:10:00 1.198 56.200 2026/08/31 12:05:00 1.199 56.400 2026/08/31 12:00:00 198 15.5 1.198 56.200 2026/08/31 11:55:00 1.199 56.400 2026/08/31 11:50:00 1.199 56.400 2026/08/31 11:45:00 198 15.8 1.198 56.200 2026/08/31 11:40:00 1.198 56.200 2026/08/31 11:35:00 1.198 56.200 2026/08/31 11:30:00 198 15.7 1.198 56.200 2026/08/31 11:25:00 1.199 56.400 2026/08/31 11:20:00 1.198 56.200 2026/08/31 11:15:00 198 16.1 1.198 56.200 2026/08/31 11:10:00 1.199 56.400 2026/08/31 11:05:00 1.199 56.400 2026/08/31 11:00:00 198 15.7 1.199 56.400 2026/08/31 10:55:00 1.199 56.400 2026/08/31 10:50:00 1.199 56.400 2026/08/31 10:45:00 198 15.0 1.199 56.400 2026/08/31 10:40:00 1.197 56.000 2026/08/31 10:35:00 1.198 56.200 2026/08/31 10:30:00 198 15.1 1.198 56.200 2026/08/31 10:25:00 1.200 56.600 2026/08/31 10:20:00 1.198 56.200 2026/08/31 10:15:00 198 14.8 1.198 56.200 2026/08/31 10:10:00 1.199 56.400 2026/08/31 10:05:00 1.198 56.200 2026/08/31 10:00:00 198 14.5 1.197 56.000 2026/08/31 09:55:00 1.199 56.400 2026/08/31 09:50:00 1.198 56.200 2026/08/31 09:45:00 198 13.6 1.198 56.200 2026/08/31 09:40:00 1.198 56.200 2026/08/31 09:35:00 1.199 56.400 2026/08/31 09:30:00 198 12.3 1.197 56.000 2026/08/31 09:25:00 1.198 56.200 2026/08/31 09:20:00 1.198 56.200 2026/08/31 09:15:00 198 12.4 1.198 56.200 2026/08/31 09:10:00 1.197 56.000 2026/08/31 09:05:00 1.198 56.200 2026/08/31 09:00:00 198 12.2 1.197 56.000 2026/08/31 08:55:00 1.198 56.200 2026/08/31 08:50:00 1.198 56.200 2026/08/31 08:45:00 198 12.0 1.197 56.000 2026/08/31 08:40:00 1.197 56.000 2026/08/31 08:35:00 1.196 55.800 2026/08/31 08:30:00 198 11.8 1.197 56.000 2026/08/31 08:25:00 1.198 56.200 2026/08/31 08:20:00 1.199 56.400 2026/08/31 08:15:00 198 11.6 1.197 56.000 2026/08/31 08:10:00 1.197 56.000 2026/08/31 08:05:00 1.198 56.200 2026/08/31 08:00:00 198 11.5 1.198 56.200 2026/08/31 07:55:00 1.197 56.000 2026/08/31 07:50:00 1.197 56.000 2026/08/31 07:45:00 198 11.6 1.197 56.000 2026/08/31 07:40:00 1.196 55.800 2026/08/31 07:35:00 1.198 56.200 2026/08/31 07:30:00 198 11.5 1.197 56.000 2026/08/31 07:25:00 1.198 56.200 2026/08/31 07:20:00 1.197 56.000 2026/08/31 07:15:00 198 11.3 1.194 55.500 2026/08/31 07:10:00 1.197 56.000 2026/08/31 07:05:00 1.198 56.200 2026/08/31 07:00:00 198 10.9 1.197 56.000 2026/08/31 06:55:00 1.198 56.200 2026/08/31 06:50:00 1.197 56.000 2026/08/31 06:45:00 198 10.7 1.197 56.000 2026/08/31 06:40:00 1.198 56.200 2026/08/31 06:35:00 1.197 56.000 2026/08/31 06:30:00 198 10.5 1.197 56.000 2026/08/31 06:25:00 1.197 56.000 2026/08/31 06:20:00 1.196 55.800 2026/08/31 06:15:00 198 10.2 1.199 56.400 2026/08/31 06:10:00 1.198 56.200 2026/08/31 06:05:00 1.198 56.200 2026/08/31 06:00:00 198 10.1 1.197 56.000 2026/08/31 05:55:00 1.198 56.200 2026/08/31 05:50:00 1.198 56.200 2026/08/31 05:45:00 198 10.0 1.198 56.200 2026/08/31 05:40:00 1.198 56.200 2026/08/31 05:35:00 1.198 56.200 2026/08/31 05:30:00 198 10.0 1.200 56.600 2026/08/31 05:25:00 1.198 56.200 2026/08/31 05:20:00 1.198 56.200 2026/08/31 05:15:00 198 9.8 1.200 56.600 2026/08/31 05:10:00 1.198 56.200 2026/08/31 05:05:00 1.198 56.200 2026/08/31 05:00:00 198 9.8 1.197 56.000 2026/08/31 04:55:00 1.200 56.600 2026/08/31 04:50:00 1.199 56.400 2026/08/31 04:45:00 198 9.3 1.198 56.200 2026/08/31 04:40:00 1.200 56.600 2026/08/31 04:35:00 1.199 56.400 2026/08/31 04:30:00 198 8.8 1.198 56.200 2026/08/31 04:25:00 1.200 56.600 2026/08/31 04:20:00 1.199 56.400 2026/08/31 04:15:00 198 9.0 1.199 56.400 2026/08/31 04:10:00 1.199 56.400 2026/08/31 04:05:00 1.199 56.400 2026/08/31 04:00:00 198 9.1 1.199 56.400 2026/08/31 03:55:00 1.201 56.800 2026/08/31 03:50:00 1.200 56.600 2026/08/31 03:45:00 198 9.0 1.200 56.600 2026/08/31 03:40:00 1.199 56.400 2026/08/31 03:35:00 1.199 56.400 2026/08/31 03:30:00 198 8.7 1.199 56.400 2026/08/31 03:25:00 1.199 56.400 2026/08/31 03:20:00 1.200 56.600 2026/08/31 03:15:00 198 8.9 1.199 56.400 2026/08/31 03:10:00 1.199 56.400 2026/08/31 03:05:00 1.201 56.800 2026/08/31 03:00:00 198 9.0 1.200 56.600 2026/08/31 02:55:00 1.200 56.600 2026/08/31 02:50:00 1.200 56.600 2026/08/31 02:45:00 198 8.9 1.200 56.600 2026/08/31 02:40:00 1.200 56.600 2026/08/31 02:35:00 1.200 56.600 2026/08/31 02:30:00 198 9.1 1.199 56.400 2026/08/31 02:25:00 1.199 56.400 2026/08/31 02:20:00 1.199 56.400 2026/08/31 02:15:00 198 9.1 1.199 56.400 2026/08/31 02:10:00 1.200 56.600 2026/08/31 02:05:00 1.200 56.600 2026/08/31 02:00:00 198 9.1 1.201 56.800 2026/08/31 01:55:00 1.201 56.800 2026/08/31 01:50:00 1.201 56.800 2026/08/31 01:45:00 198 9.3 1.200 56.600 2026/08/31 01:40:00 1.201 56.800 2026/08/31 01:35:00 1.201 56.800 2026/08/31 01:30:00 198 9.3 1.201 56.800 2026/08/31 01:25:00 1.201 56.800 2026/08/31 01:20:00 1.202 57.000 2026/08/31 01:15:00 198 9.5 1.202 57.000 2026/08/31 01:10:00 1.202 57.000 2026/08/31 01:05:00 1.201 56.800 2026/08/31 01:00:00 198 9.7 1.201 56.800 2026/08/31 00:55:00 1.202 57.000 2026/08/31 00:50:00 1.200 56.600 2026/08/31 00:45:00 198 9.9 1.202 57.000 2026/08/31 00:40:00 1.202 57.000 2026/08/31 00:35:00 1.201 56.800 2026/08/31 00:30:00 198 10.0 1.202 57.000 2026/08/31 00:25:00 1.202 57.000 2026/08/31 00:20:00 1.203 57.200 2026/08/31 00:15:00 198 10.1 1.203 57.200 2026/08/31 00:10:00 1.203 57.200 2026/08/31 00:05:00 1.201 56.800 2026/08/31 00:00:00 198 10.3 1.203 57.200 2026/08/30 23:55:00 1.203 57.200 2026/08/30 23:50:00 1.205 57.600 2026/08/30 23:45:00 198 10.5 1.204 57.400 2026/08/30 23:40:00 1.203 57.200 2026/08/30 23:35:00 1.203 57.200 2026/08/30 23:30:00 198 10.5 1.204 57.400 2026/08/30 23:25:00 1.203 57.200 2026/08/30 23:20:00 1.203 57.200 2026/08/30 23:15:00 198 10.5 1.204 57.400 2026/08/30 23:10:00 1.203 57.200 2026/08/30 23:05:00 1.203 57.200 2026/08/30 23:00:00 198 10.7 1.204 57.400 2026/08/30 22:55:00 1.204 57.400 2026/08/30 22:50:00 1.205 57.600 2026/08/30 22:45:00 198 10.9 1.204 57.400 2026/08/30 22:40:00 1.202 57.000 2026/08/30 22:35:00 1.204 57.400 2026/08/30 22:30:00 198 11.0 1.205 57.600 2026/08/30 22:25:00 1.204 57.400 2026/08/30 22:20:00 1.204 57.400 2026/08/30 22:15:00 198 10.8 1.205 57.600 2026/08/30 22:10:00 1.203 57.200 2026/08/30 22:05:00 1.205 57.600 2026/08/30 22:00:00 198 10.7 1.205 57.600 2026/08/30 21:55:00 1.206 57.700 2026/08/30 21:50:00 1.206 57.700 2026/08/30 21:45:00 198 10.4 1.204 57.400 2026/08/30 21:40:00 1.205 57.600 2026/08/30 21:35:00 1.206 57.700 2026/08/30 21:30:00 198 9.8 1.206 57.700 2026/08/30 21:25:00 1.206 57.700 2026/08/30 21:20:00 1.205 57.600 2026/08/30 21:15:00 198 9.1 1.206 57.700 2026/08/30 21:10:00 1.206 57.700 2026/08/30 21:05:00 1.206 57.700 2026/08/30 21:00:00 198 8.7 1.206 57.700 2026/08/30 20:55:00 1.205 57.600 2026/08/30 20:50:00 1.207 57.900 2026/08/30 20:45:00 198 8.7 1.206 57.700 2026/08/30 20:40:00 1.207 57.900 2026/08/30 20:35:00 1.206 57.700 2026/08/30 20:30:00 198 9.1 1.205 57.600 2026/08/30 20:25:00 1.206 57.700 2026/08/30 20:20:00 1.206 57.700 2026/08/30 20:15:00 198 9.4 1.206 57.700 2026/08/30 20:10:00 1.207 57.900 2026/08/30 20:05:00 1.207 57.900 2026/08/30 20:00:00 198 9.8 1.206 57.700 2026/08/30 19:55:00 1.206 57.700 2026/08/30 19:50:00 1.206 57.700 2026/08/30 19:45:00 198 10.2 1.208 58.100 2026/08/30 19:40:00 1.208 58.100 2026/08/30 19:35:00 1.208 58.100 2026/08/30 19:30:00 198 10.8 1.208 58.100 2026/08/30 19:25:00 1.208 58.100 2026/08/30 19:20:00 1.208 58.100 2026/08/30 19:15:00 198 11.6 1.207 57.900 2026/08/30 19:10:00 1.208 58.100 2026/08/30 19:05:00 1.208 58.100 2026/08/30 19:00:00 198 12.4 1.209 58.300 2026/08/30 18:55:00 1.208 58.100 2026/08/30 18:50:00 1.209 58.300 2026/08/30 18:45:00 198 13.1 1.210 58.500 2026/08/30 18:40:00 1.209 58.300 2026/08/30 18:35:00 1.208 58.100 2026/08/30 18:30:00 198 13.4 1.210 58.500 2026/08/30 18:25:00 1.208 58.100 2026/08/30 18:20:00 1.210 58.500 2026/08/30 18:15:00 198 13.5 1.210 58.500 2026/08/30 18:10:00 1.208 58.100 2026/08/30 18:05:00 1.208 58.100 2026/08/30 18:00:00 198 13.6 1.211 58.700 2026/08/30 17:55:00 1.210 58.500 2026/08/30 17:50:00 1.211 58.700 2026/08/30 17:45:00 198 13.7 1.209 58.300 2026/08/30 17:40:00 1.209 58.300 2026/08/30 17:35:00 1.211 58.700 2026/08/30 17:30:00 198 13.7 1.211 58.700 2026/08/30 17:25:00 1.212 58.900 2026/08/30 17:20:00 1.210 58.500 2026/08/30 17:15:00 198 13.7 1.212 58.900 2026/08/30 17:10:00 1.209 58.300 2026/08/30 17:05:00 1.209 58.300 2026/08/30 17:00:00 198 14.0 1.212 58.900 2026/08/30 16:55:00 1.212 58.900 2026/08/30 16:50:00 1.209 58.300 2026/08/30 16:45:00 198 13.9 1.212 58.900 2026/08/30 16:40:00 1.212 58.900 2026/08/30 16:35:00 1.211 58.700 2026/08/30 16:30:00 198 13.9 1.212 58.900 2026/08/30 16:25:00 1.212 58.900 2026/08/30 16:20:00 1.214 59.300 2026/08/30 16:15:00 198 14.0 1.213 59.100 2026/08/30 16:10:00 1.213 59.100 2026/08/30 16:05:00 1.214 59.300 2026/08/30 16:00:00 198 14.1 1.213 59.100 2026/08/30 15:55:00 1.212 58.900 2026/08/30 15:50:00 1.212 58.900 2026/08/30 15:45:00 198 14.4 1.214 59.300 2026/08/30 15:40:00 1.211 58.700 2026/08/30 15:35:00 1.211 58.700 2026/08/30 15:30:00 197 14.9 1.212 58.900 2026/08/30 15:25:00 1.212 58.900 2026/08/30 15:20:00 1.210 58.500 2026/08/30 15:15:00 197 16.3 1.212 58.900 2026/08/30 15:10:00 1.212 58.900 2026/08/30 15:05:00 1.212 58.900 2026/08/30 15:00:00 197 17.2 1.212 58.900 2026/08/30 14:55:00 1.212 58.900 2026/08/30 14:50:00 1.210 58.500 2026/08/30 14:45:00 197 17.7 1.212 58.900 2026/08/30 14:40:00 1.213 59.100 2026/08/30 14:35:00 1.212 58.900 2026/08/30 14:30:00 197 17.4 1.213 59.100 2026/08/30 14:25:00 1.212 58.900 2026/08/30 14:20:00 1.211 58.700 2026/08/30 14:15:00 197 17.6 1.212 58.900 2026/08/30 14:10:00 1.214 59.300 2026/08/30 14:05:00 1.213 59.100 2026/08/30 14:00:00 197 17.5 1.214 59.300 2026/08/30 13:55:00 1.213 59.100 2026/08/30 13:50:00 1.213 59.100 2026/08/30 13:45:00 197 17.7 1.213 59.100 2026/08/30 13:40:00 1.214 59.300 2026/08/30 13:35:00 1.212 58.900 2026/08/30 13:30:00 197 17.3 1.214 59.300 2026/08/30 13:25:00 1.213 59.100 2026/08/30 13:20:00 1.215 59.500 2026/08/30 13:15:00 197 15.9 1.212 58.900 2026/08/30 13:10:00 1.211 58.700 2026/08/30 13:05:00 1.214 59.300 2026/08/30 13:00:00 197 16.6 1.215 59.500 2026/08/30 12:55:00 1.214 59.300 2026/08/30 12:50:00 1.212 58.900 2026/08/30 12:45:00 197 16.8 1.213 59.100 2026/08/30 12:40:00 1.214 59.300 2026/08/30 12:35:00 1.215 59.500 2026/08/30 12:30:00 197 17.4 1.214 59.300 2026/08/30 12:25:00 1.213 59.100 2026/08/30 12:20:00 1.214 59.300 2026/08/30 12:15:00 197 17.0 1.212 58.900 2026/08/30 12:10:00 1.213 59.100 2026/08/30 12:05:00 1.214 59.300 2026/08/30 12:00:00 197 16.4 1.212 58.900 2026/08/30 11:55:00 1.215 59.500 2026/08/30 11:50:00 1.214 59.300 2026/08/30 11:45:00 197 14.9 1.213 59.100 2026/08/30 11:40:00 1.213 59.100 2026/08/30 11:35:00 1.213 59.100 2026/08/30 11:30:00 197 13.9 1.214 59.300 2026/08/30 11:25:00 1.214 59.300 2026/08/30 11:20:00 1.212 58.900 2026/08/30 11:15:00 196 14.1 1.213 59.100 2026/08/30 11:10:00 1.212 58.900 2026/08/30 11:05:00 1.213 59.100 2026/08/30 11:00:00 196 14.8 1.214 59.300 2026/08/30 10:55:00 1.214 59.300 2026/08/30 10:50:00 1.213 59.100 2026/08/30 10:45:00 196 14.8 1.214 59.300 2026/08/30 10:40:00 1.213 59.100 2026/08/30 10:35:00 1.213 59.100 2026/08/30 10:30:00 196 14.4 1.211 58.700 2026/08/30 10:25:00 1.213 59.100 2026/08/30 10:20:00 1.213 59.100 2026/08/30 10:15:00 196 14.4 1.214 59.300 2026/08/30 10:10:00 1.213 59.100 2026/08/30 10:05:00 1.213 59.100 2026/08/30 10:00:00 196 14.3 1.212 58.900 2026/08/30 09:55:00 1.213 59.100 2026/08/30 09:50:00 1.213 59.100 2026/08/30 09:45:00 196 14.1 1.212 58.900 2026/08/30 09:40:00 1.213 59.100 2026/08/30 09:35:00 1.212 58.900 2026/08/30 09:30:00 196 13.5 1.213 59.100 2026/08/30 09:25:00 1.213 59.100 2026/08/30 09:20:00 1.214 59.300 2026/08/30 09:15:00 196 13.1 1.211 58.700 2026/08/30 09:10:00 1.214 59.300 2026/08/30 09:05:00 1.212 58.900 2026/08/30 09:00:00 196 12.8 1.214 59.300 2026/08/30 08:55:00 1.214 59.300 2026/08/30 08:50:00 1.212 58.900 2026/08/30 08:45:00 196 12.9 1.211 58.700 2026/08/30 08:40:00 1.213 59.100 2026/08/30 08:35:00 1.213 59.100 2026/08/30 08:30:00 196 12.7 1.214 59.300 2026/08/30 08:25:00 1.213 59.100 2026/08/30 08:20:00 1.212 58.900 2026/08/30 08:15:00 196 12.6 1.212 58.900 2026/08/30 08:10:00 1.214 59.300 2026/08/30 08:05:00 1.212 58.900 2026/08/30 08:00:00 196 12.4 1.209 58.300 2026/08/30 07:55:00 1.212 58.900 2026/08/30 07:50:00 1.213 59.100 2026/08/30 07:45:00 196 12.1 1.211 58.700 2026/08/30 07:40:00 1.213 59.100 2026/08/30 07:35:00 1.212 58.900 2026/08/30 07:30:00 196 11.8 1.212 58.900 2026/08/30 07:25:00 1.211 58.700 2026/08/30 07:20:00 1.212 58.900 2026/08/30 07:15:00 196 11.7 1.212 58.900 2026/08/30 07:10:00 1.211 58.700 2026/08/30 07:05:00 1.212 58.900 2026/08/30 07:00:00 196 11.6 1.212 58.900 2026/08/30 06:55:00 1.212 58.900 2026/08/30 06:50:00 1.212 58.900 2026/08/30 06:45:00 196 11.3 1.211 58.700 2026/08/30 06:40:00 1.212 58.900 2026/08/30 06:35:00 1.212 58.900 2026/08/30 06:30:00 196 10.8 1.211 58.700 2026/08/30 06:25:00 1.213 59.100 2026/08/30 06:20:00 1.213 59.100 2026/08/30 06:15:00 196 10.6 1.211 58.700 2026/08/30 06:10:00 1.212 58.900 2026/08/30 06:05:00 1.210 58.500 2026/08/30 06:00:00 196 10.5 1.211 58.700 2026/08/30 05:55:00 1.211 58.700 2026/08/30 05:50:00 1.210 58.500 2026/08/30 05:45:00 196 10.3 1.212 58.900 2026/08/30 05:40:00 1.212 58.900 2026/08/30 05:35:00 1.212 58.900 2026/08/30 05:30:00 196 10.3 1.209 58.300 2026/08/30 05:25:00 1.209 58.300 2026/08/30 05:20:00 1.210 58.500 2026/08/30 05:15:00 196 10.3 1.212 58.900 2026/08/30 05:10:00 1.210 58.500 2026/08/30 05:05:00 1.211 58.700 2026/08/30 05:00:00 196 10.4 1.209 58.300 2026/08/30 04:55:00 1.211 58.700 2026/08/30 04:50:00 1.209 58.300 2026/08/30 04:45:00 196 10.5 1.210 58.500 2026/08/30 04:40:00 1.210 58.500 2026/08/30 04:35:00 1.210 58.500 2026/08/30 04:30:00 196 10.5 1.208 58.100 2026/08/30 04:25:00 1.210 58.500 2026/08/30 04:20:00 1.210 58.500 2026/08/30 04:15:00 196 10.5 1.209 58.300 2026/08/30 04:10:00 1.210 58.500 2026/08/30 04:05:00 1.210 58.500 2026/08/30 04:00:00 196 10.5 1.209 58.300 2026/08/30 03:55:00 1.210 58.500 2026/08/30 03:50:00 1.210 58.500 2026/08/30 03:45:00 196 10.4 1.210 58.500 2026/08/30 03:40:00 1.208 58.100 2026/08/30 03:35:00 1.209 58.300 2026/08/30 03:30:00 196 10.3 1.209 58.300 2026/08/30 03:25:00 1.208 58.100 2026/08/30 03:20:00 1.208 58.100 2026/08/30 03:15:00 196 10.1 1.208 58.100 2026/08/30 03:10:00 1.209 58.300 2026/08/30 03:05:00 1.209 58.300 2026/08/30 03:00:00 196 9.9 1.207 57.900 2026/08/30 02:55:00 1.207 57.900 2026/08/30 02:50:00 1.208 58.100 2026/08/30 02:45:00 196 9.9 1.208 58.100 2026/08/30 02:40:00 1.208 58.100 2026/08/30 02:35:00 1.209 58.300 2026/08/30 02:30:00 196 9.6 1.207 57.900 2026/08/30 02:25:00 1.208 58.100 2026/08/30 02:20:00 1.208 58.100 2026/08/30 02:15:00 196 9.3 1.207 57.900 2026/08/30 02:10:00 1.209 58.300 2026/08/30 02:05:00 1.208 58.100 2026/08/30 02:00:00 196 9.2 1.207 57.900 2026/08/30 01:55:00 1.207 57.900 2026/08/30 01:50:00 1.206 57.700 2026/08/30 01:45:00 196 9.3 1.207 57.900 2026/08/30 01:40:00 1.208 58.100 2026/08/30 01:35:00 1.206 57.700 2026/08/30 01:30:00 196 9.5 1.206 57.700 2026/08/30 01:25:00 1.206 57.700 2026/08/30 01:20:00 1.205 57.600 2026/08/30 01:15:00 196 9.9 1.205 57.600 2026/08/30 01:10:00 1.206 57.700 2026/08/30 01:05:00 1.207 57.900 2026/08/30 01:00:00 196 10.3 1.206 57.700 2026/08/30 00:55:00 1.206 57.700 2026/08/30 00:50:00 1.207 57.900 2026/08/30 00:45:00 196 10.5 1.204 57.400 2026/08/30 00:40:00 1.206 57.700 2026/08/30 00:35:00 1.205 57.600 2026/08/30 00:30:00 196 10.6 1.204 57.400 2026/08/30 00:25:00 1.204 57.400 2026/08/30 00:20:00 1.204 57.400 2026/08/30 00:15:00 196 10.7 1.206 57.700 2026/08/30 00:10:00 1.203 57.200 2026/08/30 00:05:00 1.204 57.400 2026/08/30 00:00:00 196 10.7 1.203 57.200 2026/08/29 23:55:00 1.204 57.400 2026/08/29 23:50:00 1.204 57.400 2026/08/29 23:45:00 196 10.7 1.204 57.400 2026/08/29 23:40:00 1.202 57.000 2026/08/29 23:35:00 1.202 57.000 2026/08/29 23:30:00 196 10.6 1.202 57.000 2026/08/29 23:25:00 1.203 57.200 2026/08/29 23:20:00 1.204 57.400 2026/08/29 23:15:00 196 10.5 1.202 57.000 2026/08/29 23:10:00 1.202 57.000 2026/08/29 23:05:00 1.203 57.200 2026/08/29 23:00:00 196 10.4 1.203 57.200 2026/08/29 22:55:00 1.202 57.000 2026/08/29 22:50:00 1.202 57.000 2026/08/29 22:45:00 196 10.6 1.202 57.000 2026/08/29 22:40:00 1.203 57.200 2026/08/29 22:35:00 1.201 56.800 2026/08/29 22:30:00 196 10.8 1.201 56.800 2026/08/29 22:25:00 1.202 57.000 2026/08/29 22:20:00 1.200 56.600 2026/08/29 22:15:00 196 11.1 1.201 56.800 2026/08/29 22:10:00 1.202 57.000 2026/08/29 22:05:00 1.201 56.800 2026/08/29 22:00:00 196 11.0 1.199 56.400 2026/08/29 21:55:00 1.202 57.000 2026/08/29 21:50:00 1.201 56.800 2026/08/29 21:45:00 196 11.1 1.202 57.000 2026/08/29 21:40:00 1.200 56.600 2026/08/29 21:35:00 1.200 56.600 2026/08/29 21:30:00 196 11.2 1.201 56.800 2026/08/29 21:25:00 1.201 56.800 2026/08/29 21:20:00 1.200 56.600 2026/08/29 21:15:00 196 11.1 1.200 56.600 2026/08/29 21:10:00 1.199 56.400 2026/08/29 21:05:00 1.199 56.400 2026/08/29 21:00:00 196 11.1 1.200 56.600 2026/08/29 20:55:00 1.199 56.400 2026/08/29 20:50:00 1.200 56.600 2026/08/29 20:45:00 196 11.1 1.197 56.000 2026/08/29 20:40:00 1.200 56.600 2026/08/29 20:35:00 1.199 56.400 2026/08/29 20:30:00 196 11.2 1.199 56.400 2026/08/29 20:25:00 1.198 56.200 2026/08/29 20:20:00 1.199 56.400 2026/08/29 20:15:00 196 11.3 1.200 56.600 2026/08/29 20:10:00 1.199 56.400 2026/08/29 20:05:00 1.198 56.200 2026/08/29 20:00:00 196 11.4 1.197 56.000 2026/08/29 19:55:00 1.197 56.000 2026/08/29 19:50:00 1.197 56.000 2026/08/29 19:45:00 196 11.5 1.199 56.400 2026/08/29 19:40:00 1.197 56.000 2026/08/29 19:35:00 1.197 56.000 2026/08/29 19:30:00 196 11.6 1.196 55.800 2026/08/29 19:25:00 1.196 55.800 2026/08/29 19:20:00 1.196 55.800 2026/08/29 19:15:00 196 11.7 1.197 56.000 2026/08/29 19:10:00 1.197 56.000 2026/08/29 19:05:00 1.195 55.700 2026/08/29 19:00:00 196 12.1 1.197 56.000 2026/08/29 18:55:00 1.196 55.800 2026/08/29 18:50:00 1.194 55.500 2026/08/29 18:45:00 196 12.7 1.196 55.800 2026/08/29 18:40:00 1.195 55.700 2026/08/29 18:35:00 1.196 55.800 2026/08/29 18:30:00 196 13.3 1.194 55.500 2026/08/29 18:25:00 1.195 55.700 2026/08/29 18:20:00 1.194 55.500 2026/08/29 18:15:00 196 13.7 1.194 55.500 2026/08/29 18:10:00 1.195 55.700 2026/08/29 18:05:00 1.195 55.700 2026/08/29 18:00:00 196 14.1 1.193 55.300 2026/08/29 17:55:00 1.194 55.500 2026/08/29 17:50:00 1.194 55.500 2026/08/29 17:45:00 196 14.3 1.194 55.500 2026/08/29 17:40:00 1.194 55.500 2026/08/29 17:35:00 1.195 55.700 2026/08/29 17:30:00 196 14.5 1.194 55.500 2026/08/29 17:25:00 1.194 55.500 2026/08/29 17:20:00 1.194 55.500 2026/08/29 17:15:00 196 15.2 1.193 55.300 2026/08/29 17:10:00 1.194 55.500 2026/08/29 17:05:00 1.192 55.100 2026/08/29 17:00:00 196 16.2 1.193 55.300 2026/08/29 16:55:00 1.195 55.700 2026/08/29 16:50:00 1.195 55.700 2026/08/29 16:45:00 196 16.5 1.193 55.300 2026/08/29 16:40:00 1.194 55.500 2026/08/29 16:35:00 1.193 55.300 2026/08/29 16:30:00 196 16.9 1.193 55.300 2026/08/29 16:25:00 1.193 55.300 2026/08/29 16:20:00 1.193 55.300 2026/08/29 16:15:00 196 17.2 1.194 55.500 2026/08/29 16:10:00 1.193 55.300 2026/08/29 16:05:00 1.193 55.300 2026/08/29 16:00:00 196 17.5 1.194 55.500 2026/08/29 15:55:00 1.191 54.900 2026/08/29 15:50:00 1.193 55.300 2026/08/29 15:45:00 196 18.0 1.193 55.300 2026/08/29 15:40:00 1.192 55.100 2026/08/29 15:35:00 1.192 55.100 2026/08/29 15:30:00 196 18.3 1.190 54.700 2026/08/29 15:25:00 1.192 55.100 2026/08/29 15:20:00 1.192 55.100 2026/08/29 15:15:00 196 18.6 1.193 55.300 2026/08/29 15:10:00 1.192 55.100 2026/08/29 15:05:00 1.193 55.300 2026/08/29 15:00:00 196 18.3 1.191 54.900 2026/08/29 14:55:00 1.192 55.100 2026/08/29 14:50:00 1.192 55.100 2026/08/29 14:45:00 196 18.5 1.192 55.100 2026/08/29 14:40:00 1.191 54.900 2026/08/29 14:35:00 1.192 55.100 2026/08/29 14:30:00 196 19.1 1.193 55.300 2026/08/29 14:25:00 1.192 55.100 2026/08/29 14:20:00 1.192 55.100 2026/08/29 14:15:00 196 20.1 1.191 54.900 2026/08/29 14:10:00 1.191 54.900 2026/08/29 14:05:00 1.192 55.100 2026/08/29 14:00:00 196 20.0 1.191 54.900 2026/08/29 13:55:00 1.192 55.100 2026/08/29 13:50:00 1.191 54.900 2026/08/29 13:45:00 196 18.9 1.192 55.100 2026/08/29 13:40:00 1.192 55.100 2026/08/29 13:35:00 1.191 54.900 2026/08/29 13:30:00 196 18.8 1.190 54.700 2026/08/29 13:25:00 1.190 54.700 2026/08/29 13:20:00 1.191 54.900 2026/08/29 13:15:00 196 18.7 1.190 54.700 2026/08/29 13:10:00 1.191 54.900 2026/08/29 13:05:00 1.191 54.900 2026/08/29 13:00:00 196 18.3 1.192 55.100 2026/08/29 12:55:00 1.192 55.100 2026/08/29 12:50:00 1.191 54.900 2026/08/29 12:45:00 196 19.0 1.190 54.700 2026/08/29 12:40:00 1.191 54.900 2026/08/29 12:35:00 1.191 54.900 2026/08/29 12:30:00 196 19.9 1.190 54.700 2026/08/29 12:25:00 1.191 54.900 2026/08/29 12:20:00 1.193 55.300 2026/08/29 12:15:00 196 18.8 1.189 54.500 2026/08/29 12:10:00 1.190 54.700 2026/08/29 12:05:00 1.189 54.500 2026/08/29 12:00:00 196 17.4 1.191 54.900 2026/08/29 11:55:00 1.191 54.900 2026/08/29 11:50:00 1.191 54.900 2026/08/29 11:45:00 196 16.2 1.190 54.700 2026/08/29 11:40:00 1.190 54.700 2026/08/29 11:35:00 1.190 54.700 2026/08/29 11:30:00 196 16.0 1.191 54.900 2026/08/29 11:25:00 1.188 54.300 2026/08/29 11:20:00 1.191 54.900 2026/08/29 11:15:00 196 16.2 1.191 54.900 2026/08/29 11:10:00 1.190 54.700 2026/08/29 11:05:00 1.191 54.900 2026/08/29 11:00:00 196 15.1 1.188 54.300 2026/08/29 10:55:00 1.189 54.500 2026/08/29 10:50:00 1.189 54.500 2026/08/29 10:45:00 196 15.0 1.190 54.700 2026/08/29 10:40:00 1.189 54.500 2026/08/29 10:35:00 1.190 54.700 2026/08/29 10:30:00 196 14.3 1.189 54.500 2026/08/29 10:25:00 1.190 54.700 2026/08/29 10:20:00 1.190 54.700 2026/08/29 10:15:00 196 14.2 1.189 54.500 2026/08/29 10:10:00 1.189 54.500 2026/08/29 10:05:00 1.190 54.700 2026/08/29 10:00:00 196 13.1 1.190 54.700 2026/08/29 09:55:00 1.189 54.500 2026/08/29 09:50:00 1.189 54.500 2026/08/29 09:45:00 196 12.5 1.190 54.700 2026/08/29 09:40:00 1.189 54.500 2026/08/29 09:35:00 1.189 54.500 2026/08/29 09:30:00 196 12.5 1.190 54.700 2026/08/29 09:25:00 1.189 54.500 2026/08/29 09:20:00 1.190 54.700 2026/08/29 09:15:00 196 12.4 1.188 54.300 2026/08/29 09:10:00 1.189 54.500 2026/08/29 09:05:00 1.189 54.500 2026/08/29 09:00:00 196 12.3 1.188 54.300 2026/08/29 08:55:00 1.190 54.700 2026/08/29 08:50:00 1.189 54.500 2026/08/29 08:45:00 196 12.3 1.191 54.900 2026/08/29 08:40:00 1.188 54.300 2026/08/29 08:35:00 1.189 54.500 2026/08/29 08:30:00 196 12.0 1.187 54.100 2026/08/29 08:25:00 1.189 54.500 2026/08/29 08:20:00 1.189 54.500 2026/08/29 08:15:00 196 12.0 1.189 54.500 2026/08/29 08:10:00 1.188 54.300 2026/08/29 08:05:00 1.189 54.500 2026/08/29 08:00:00 196 11.7 1.189 54.500 2026/08/29 07:55:00 1.190 54.700 2026/08/29 07:50:00 1.189 54.500 2026/08/29 07:45:00 196 11.3 1.189 54.500 2026/08/29 07:40:00 1.188 54.300 2026/08/29 07:35:00 1.189 54.500 2026/08/29 07:30:00 196 11.1 1.189 54.500 2026/08/29 07:25:00 1.189 54.500 2026/08/29 07:20:00 1.189 54.500 2026/08/29 07:15:00 196 11.0 1.188 54.300 2026/08/29 07:10:00 1.188 54.300 2026/08/29 07:05:00 1.188 54.300 2026/08/29 07:00:00 196 10.9 1.188 54.300 2026/08/29 06:55:00 1.188 54.300 2026/08/29 06:50:00 1.189 54.500 2026/08/29 06:45:00 196 10.9 1.189 54.500 2026/08/29 06:40:00 1.189 54.500 2026/08/29 06:35:00 1.188 54.300 2026/08/29 06:30:00 196 10.8 1.187 54.100 2026/08/29 06:25:00 1.186 54.000 2026/08/29 06:20:00 1.188 54.300 2026/08/29 06:15:00 196 10.4 1.188 54.300 2026/08/29 06:10:00 1.189 54.500 2026/08/29 06:05:00 1.189 54.500 2026/08/29 06:00:00 196 10.4 1.188 54.300 2026/08/29 05:55:00 1.188 54.300 2026/08/29 05:50:00 1.187 54.100 2026/08/29 05:45:00 196 10.5 1.188 54.300 2026/08/29 05:40:00 1.189 54.500 2026/08/29 05:35:00 1.188 54.300 2026/08/29 05:30:00 196 10.3 1.189 54.500 2026/08/29 05:25:00 1.188 54.300 2026/08/29 05:20:00 1.188 54.300 2026/08/29 05:15:00 196 10.3 1.189 54.500 2026/08/29 05:10:00 1.188 54.300 2026/08/29 05:05:00 1.188 54.300 2026/08/29 05:00:00 196 10.3 1.188 54.300 2026/08/29 04:55:00 1.187 54.100 2026/08/29 04:50:00 1.188 54.300 2026/08/29 04:45:00 196 10.3 1.188 54.300 2026/08/29 04:40:00 1.188 54.300 2026/08/29 04:35:00 1.187 54.100 2026/08/29 04:30:00 196 10.2 1.189 54.500 2026/08/29 04:25:00 1.188 54.300 2026/08/29 04:20:00 1.188 54.300 2026/08/29 04:15:00 196 10.1 1.189 54.500 2026/08/29 04:10:00 1.189 54.500 2026/08/29 04:05:00 1.189 54.500 2026/08/29 04:00:00 196 9.9 1.189 54.500 2026/08/29 03:55:00 1.187 54.100 2026/08/29 03:50:00 1.189 54.500 2026/08/29 03:45:00 196 9.9 1.188 54.300 2026/08/29 03:40:00 1.188 54.300 2026/08/29 03:35:00 1.187 54.100 2026/08/29 03:30:00 196 9.9 1.188 54.300 2026/08/29 03:25:00 1.188 54.300 2026/08/29 03:20:00 1.187 54.100 2026/08/29 03:15:00 196 10.1 1.188 54.300 2026/08/29 03:10:00 1.187 54.100 2026/08/29 03:05:00 1.187 54.100 2026/08/29 03:00:00 196 10.4 1.185 53.800 2026/08/29 02:55:00 1.187 54.100 2026/08/29 02:50:00 1.188 54.300 2026/08/29 02:45:00 196 10.3 1.189 54.500 2026/08/29 02:40:00 1.188 54.300 2026/08/29 02:35:00 1.187 54.100 2026/08/29 02:30:00 196 10.2 1.187 54.100 2026/08/29 02:25:00 1.187 54.100 2026/08/29 02:20:00 1.187 54.100 2026/08/29 02:15:00 196 10.1 1.187 54.100 2026/08/29 02:10:00 1.186 54.000 2026/08/29 02:05:00 1.187 54.100 2026/08/29 02:00:00 196 10.3 1.187 54.100 2026/08/29 01:55:00 1.187 54.100 2026/08/29 01:50:00 1.186 54.000 2026/08/29 01:45:00 196 10.9 1.187 54.100 2026/08/29 01:40:00 1.186 54.000 2026/08/29 01:35:00 1.186 54.000 2026/08/29 01:30:00 196 11.3 1.186 54.000 2026/08/29 01:25:00 1.186 54.000 2026/08/29 01:20:00 1.185 53.800 2026/08/29 01:15:00 196 11.4 1.184 53.600 2026/08/29 01:10:00 1.187 54.100 2026/08/29 01:05:00 1.185 53.800 2026/08/29 01:00:00 196 11.4 1.185 53.800 2026/08/29 00:55:00 1.186 54.000 2026/08/29 00:50:00 1.184 53.600 2026/08/29 00:45:00 196 11.5 1.183 53.400 2026/08/29 00:40:00 1.186 54.000 2026/08/29 00:35:00 1.185 53.800 2026/08/29 00:30:00 196 11.6 1.184 53.600 2026/08/29 00:25:00 1.184 53.600 2026/08/29 00:20:00 1.186 54.000 2026/08/29 00:15:00 196 11.5 1.184 53.600 2026/08/29 00:10:00 1.183 53.400 2026/08/29 00:05:00 1.183 53.400 2026/08/29 00:00:00 196 11.8 1.184 53.600 2026/08/28 23:55:00 1.183 53.400 2026/08/28 23:50:00 1.182 53.200 2026/08/28 23:45:00 196 11.8 1.183 53.400 2026/08/28 23:40:00 1.183 53.400 2026/08/28 23:35:00 1.185 53.800 2026/08/28 23:30:00 196 11.7 1.182 53.200 2026/08/28 23:25:00 1.183 53.400 2026/08/28 23:20:00 1.183 53.400 2026/08/28 23:15:00 196 12.1 1.183 53.400 2026/08/28 23:10:00 1.182 53.200 2026/08/28 23:05:00 1.182 53.200 2026/08/28 23:00:00 196 12.3 1.183 53.400 2026/08/28 22:55:00 1.184 53.600 2026/08/28 22:50:00 1.180 52.800 2026/08/28 22:45:00 196 12.0 1.181 53.000 2026/08/28 22:40:00 1.182 53.200 2026/08/28 22:35:00 1.182 53.200 2026/08/28 22:30:00 196 11.6 1.181 53.000 2026/08/28 22:25:00 1.181 53.000 2026/08/28 22:20:00 1.180 52.800 2026/08/28 22:15:00 196 11.8 1.181 53.000 2026/08/28 22:10:00 1.180 52.800 2026/08/28 22:05:00 1.179 52.600 2026/08/28 22:00:00 196 11.7 1.181 53.000 2026/08/28 21:55:00 1.180 52.800 2026/08/28 21:50:00 1.180 52.800 2026/08/28 21:45:00 196 11.8 1.179 52.600 2026/08/28 21:40:00 1.178 52.500 2026/08/28 21:35:00 1.178 52.500 2026/08/28 21:30:00 196 12.2 1.178 52.500 2026/08/28 21:25:00 1.179 52.600 2026/08/28 21:20:00 1.179 52.600 2026/08/28 21:15:00 196 12.5 1.178 52.500 2026/08/28 21:10:00 1.179 52.600 2026/08/28 21:05:00 1.177 52.300 2026/08/28 21:00:00 196 12.2 1.177 52.300 2026/08/28 20:55:00 1.176 52.100 2026/08/28 20:50:00 1.178 52.500 2026/08/28 20:45:00 196 11.5 1.179 52.600 2026/08/28 20:40:00 1.176 52.100 2026/08/28 20:35:00 1.177 52.300 2026/08/28 20:30:00 196 11.8 1.178 52.500 2026/08/28 20:25:00 1.178 52.500 2026/08/28 20:20:00 1.177 52.300 2026/08/28 20:15:00 196 12.0 1.177 52.300 2026/08/28 20:10:00 1.176 52.100 2026/08/28 20:05:00 1.177 52.300 2026/08/28 20:00:00 196 12.5 1.174 51.700 2026/08/28 19:55:00 1.176 52.100 2026/08/28 19:50:00 1.175 51.900 2026/08/28 19:45:00 196 12.7 1.175 51.900 2026/08/28 19:40:00 1.177 52.300 2026/08/28 19:35:00 1.175 51.900 2026/08/28 19:30:00 196 12.7 1.175 51.900 2026/08/28 19:25:00 1.175 51.900 2026/08/28 19:20:00 1.175 51.900 2026/08/28 19:15:00 196 13.0 1.176 52.100 2026/08/28 19:10:00 1.176 52.100 2026/08/28 19:05:00 1.175 51.900 2026/08/28 19:00:00 196 13.3 1.175 51.900 2026/08/28 18:55:00 1.175 51.900 2026/08/28 18:50:00 1.174 51.700 2026/08/28 18:45:00 196 13.5 1.174 51.700 2026/08/28 18:40:00 1.174 51.700 2026/08/28 18:35:00 1.175 51.900 2026/08/28 18:30:00 196 13.4 1.175 51.900 2026/08/28 18:25:00 1.174 51.700 2026/08/28 18:20:00 1.174 51.700 2026/08/28 18:15:00 196 13.6 1.175 51.900 2026/08/28 18:10:00 1.174 51.700 2026/08/28 18:05:00 1.174 51.700 2026/08/28 18:00:00 196 14.0 1.173 51.500 2026/08/28 17:55:00 1.174 51.700 2026/08/28 17:50:00 1.174 51.700 2026/08/28 17:45:00 196 14.0 1.174 51.700 2026/08/28 17:40:00 1.175 51.900 2026/08/28 17:35:00 1.174 51.700 2026/08/28 17:30:00 196 13.7 1.173 51.500 2026/08/28 17:25:00 1.174 51.700 2026/08/28 17:20:00 1.174 51.700 2026/08/28 17:15:00 196 13.8 1.174 51.700 2026/08/28 17:10:00 1.174 51.700 2026/08/28 17:05:00 1.173 51.500 2026/08/28 17:00:00 196 14.3 1.174 51.700 2026/08/28 16:55:00 1.174 51.700 2026/08/28 16:50:00 1.174 51.700 2026/08/28 16:45:00 196 14.8 1.173 51.500 2026/08/28 16:40:00 1.174 51.700 2026/08/28 16:35:00 1.172 51.400 2026/08/28 16:30:00 196 15.4 1.173 51.500 2026/08/28 16:25:00 1.174 51.700 2026/08/28 16:20:00 1.174 51.700 2026/08/28 16:15:00 196 15.4 1.173 51.500 2026/08/28 16:10:00 1.174 51.700 2026/08/28 16:05:00 1.173 51.500 2026/08/28 16:00:00 196 15.6 1.173 51.500 2026/08/28 15:55:00 1.173 51.500 2026/08/28 15:50:00 1.173 51.500 2026/08/28 15:45:00 196 16.9 1.173 51.500 2026/08/28 15:40:00 1.172 51.400 2026/08/28 15:35:00 1.172 51.400 2026/08/28 15:30:00 196 18.6 1.172 51.400 2026/08/28 15:25:00 1.173 51.500 2026/08/28 15:20:00 1.173 51.500 2026/08/28 15:15:00 196 18.7 1.172 51.400 2026/08/28 15:10:00 1.173 51.500 2026/08/28 15:05:00 1.173 51.500 2026/08/28 15:00:00 196 19.2 1.170 51.000 2026/08/28 14:55:00 1.172 51.400 2026/08/28 14:50:00 1.171 51.200 2026/08/28 14:45:00 196 18.3 1.172 51.400 2026/08/28 14:40:00 1.172 51.400 2026/08/28 14:35:00 1.171 51.200 2026/08/28 14:30:00 196 16.9 1.173 51.500 2026/08/28 14:25:00 1.172 51.400 2026/08/28 14:20:00 1.172 51.400 2026/08/28 14:15:00 196 16.2 1.172 51.400 2026/08/28 14:10:00 1.173 51.500 2026/08/28 14:05:00 1.171 51.200 2026/08/28 14:00:00 196 16.4 1.172 51.400 2026/08/28 13:55:00 1.171 51.200 2026/08/28 13:50:00 1.170 51.000 2026/08/28 13:45:00 196 17.2 1.172 51.400 2026/08/28 13:40:00 1.172 51.400 2026/08/28 13:35:00 1.171 51.200 2026/08/28 13:30:00 196 18.3 1.172 51.400 2026/08/28 13:25:00 1.171 51.200 2026/08/28 13:20:00 1.171 51.200 2026/08/28 13:15:00 196 17.8 1.172 51.400 2026/08/28 13:10:00 1.172 51.400 2026/08/28 13:05:00 1.173 51.500 2026/08/28 13:00:00 196 16.6 1.173 51.500 2026/08/28 12:55:00 1.171 51.200 2026/08/28 12:50:00 1.173 51.500 2026/08/28 12:45:00 196 15.5 1.171 51.200 2026/08/28 12:40:00 1.173 51.500 2026/08/28 12:35:00 1.173 51.500 2026/08/28 12:30:00 196 13.7 1.174 51.700 2026/08/28 12:25:00 1.172 51.400 2026/08/28 12:20:00 1.172 51.400 2026/08/28 12:15:00 195 13.2 1.173 51.500 2026/08/28 12:10:00 1.170 51.000 2026/08/28 12:05:00 1.172 51.400 2026/08/28 12:00:00 195 14.4 1.171 51.200 2026/08/28 11:55:00 1.170 51.000 2026/08/28 11:50:00 1.171 51.200 2026/08/28 11:45:00 195 14.8 1.169 50.800 2026/08/28 11:40:00 1.170 51.000 2026/08/28 11:35:00 1.169 50.800 2026/08/28 11:30:00 195 14.6 1.169 50.800 2026/08/28 11:25:00 1.169 50.800 2026/08/28 11:20:00 1.169 50.800 2026/08/28 11:15:00 195 15.5 1.170 51.000 2026/08/28 11:10:00 1.170 51.000 2026/08/28 11:05:00 1.170 51.000 2026/08/28 11:00:00 195 15.2 1.169 50.800 2026/08/28 10:55:00 1.169 50.800 2026/08/28 10:50:00 1.169 50.800 2026/08/28 10:45:00 195 16.3 1.169 50.800 2026/08/28 10:40:00 1.170 51.000 2026/08/28 10:35:00 1.170 51.000 2026/08/28 10:30:00 195 16.3 1.169 50.800 2026/08/28 10:25:00 1.170 51.000 2026/08/28 10:20:00 1.170 51.000 2026/08/28 10:15:00 195 16.4 1.169 50.800 2026/08/28 10:10:00 1.169 50.800 2026/08/28 10:05:00 1.168 50.600 2026/08/28 10:00:00 195 15.5 1.170 51.000 2026/08/28 09:55:00 1.170 51.000 2026/08/28 09:50:00 1.170 51.000 2026/08/28 09:45:00 195 15.0 1.169 50.800 2026/08/28 09:40:00 1.169 50.800 2026/08/28 09:35:00 1.170 51.000 2026/08/28 09:30:00 195 14.5 1.170 51.000 2026/08/28 09:25:00 1.168 50.600 2026/08/28 09:20:00 1.170 51.000 2026/08/28 09:15:00 195 14.4 1.170 51.000 2026/08/28 09:10:00 1.170 51.000 2026/08/28 09:05:00 1.169 50.800 2026/08/28 09:00:00 195 14.2 1.170 51.000 2026/08/28 08:55:00 1.169 50.800 2026/08/28 08:50:00 1.170 51.000 2026/08/28 08:45:00 195 13.7 1.168 50.600 2026/08/28 08:40:00 1.169 50.800 2026/08/28 08:35:00 1.169 50.800 2026/08/28 08:30:00 195 13.4 1.170 51.000 2026/08/28 08:25:00 1.170 51.000 2026/08/28 08:20:00 1.170 51.000 2026/08/28 08:15:00 195 13.4 1.171 51.200 2026/08/28 08:10:00 1.170 51.000 2026/08/28 08:05:00 1.170 51.000 2026/08/28 08:00:00 195 13.2 1.169 50.800 2026/08/28 07:55:00 1.169 50.800 2026/08/28 07:50:00 1.170 51.000 2026/08/28 07:45:00 195 13.0 1.170 51.000 2026/08/28 07:40:00 1.169 50.800 2026/08/28 07:35:00 1.170 51.000 2026/08/28 07:30:00 195 12.7 1.170 51.000 2026/08/28 07:25:00 1.169 50.800 2026/08/28 07:20:00 1.171 51.200 2026/08/28 07:15:00 195 12.5 1.170 51.000 2026/08/28 07:10:00 1.170 51.000 2026/08/28 07:05:00 1.170 51.000 2026/08/28 07:00:00 195 12.3 1.170 51.000 2026/08/28 06:55:00 1.170 51.000 2026/08/28 06:50:00 1.169 50.800 2026/08/28 06:45:00 195 12.0 1.170 51.000 2026/08/28 06:40:00 1.170 51.000 2026/08/28 06:35:00 1.171 51.200 2026/08/28 06:30:00 195 11.8 1.171 51.200 2026/08/28 06:25:00 1.171 51.200 2026/08/28 06:20:00 1.169 50.800 2026/08/28 06:15:00 195 11.7 1.171 51.200 2026/08/28 06:10:00 1.171 51.200 2026/08/28 06:05:00 1.171 51.200 2026/08/28 06:00:00 195 11.7 1.170 51.000 2026/08/28 05:55:00 1.171 51.200 2026/08/28 05:50:00 1.171 51.200 2026/08/28 05:45:00 195 11.7 1.170 51.000 2026/08/28 05:40:00 1.171 51.200 2026/08/28 05:35:00 1.171 51.200 2026/08/28 05:30:00 195 11.8 1.171 51.200 2026/08/28 05:25:00 1.171 51.200 2026/08/28 05:20:00 1.171 51.200 2026/08/28 05:15:00 195 11.9 1.170 51.000 2026/08/28 05:10:00 1.170 51.000 2026/08/28 05:05:00 1.171 51.200 2026/08/28 05:00:00 195 12.0 1.172 51.400 2026/08/28 04:55:00 1.172 51.400 2026/08/28 04:50:00 1.172 51.400 2026/08/28 04:45:00 195 11.9 1.171 51.200 2026/08/28 04:40:00 1.173 51.500 2026/08/28 04:35:00 1.172 51.400 2026/08/28 04:30:00 195 11.9 1.170 51.000 2026/08/28 04:25:00 1.172 51.400 2026/08/28 04:20:00 1.171 51.200 2026/08/28 04:15:00 195 11.9 1.171 51.200 2026/08/28 04:10:00 1.171 51.200 2026/08/28 04:05:00 1.172 51.400 2026/08/28 04:00:00 195 12.0 1.172 51.400 2026/08/28 03:55:00 1.173 51.500 2026/08/28 03:50:00 1.172 51.400 2026/08/28 03:45:00 195 11.9 1.172 51.400 2026/08/28 03:40:00 1.173 51.500 2026/08/28 03:35:00 1.173 51.500 2026/08/28 03:30:00 195 11.9 1.172 51.400 2026/08/28 03:25:00 1.172 51.400 2026/08/28 03:20:00 1.172 51.400 2026/08/28 03:15:00 195 11.9 1.173 51.500 2026/08/28 03:10:00 1.172 51.400 2026/08/28 03:05:00 1.173 51.500 2026/08/28 03:00:00 195 11.9 1.172 51.400 2026/08/28 02:55:00 1.172 51.400 2026/08/28 02:50:00 1.170 51.000 2026/08/28 02:45:00 195 11.9 1.173 51.500 2026/08/28 02:40:00 1.172 51.400 2026/08/28 02:35:00 1.173 51.500 2026/08/28 02:30:00 195 11.9 1.174 51.700 2026/08/28 02:25:00 1.173 51.500 2026/08/28 02:20:00 1.173 51.500 2026/08/28 02:15:00 195 11.9 1.174 51.700 2026/08/28 02:10:00 1.173 51.500 2026/08/28 02:05:00 1.173 51.500 2026/08/28 02:00:00 195 11.9 1.173 51.500 2026/08/28 01:55:00 1.174 51.700 2026/08/28 01:50:00 1.174 51.700 2026/08/28 01:45:00 195 11.8 1.175 51.900 2026/08/28 01:40:00 1.173 51.500 2026/08/28 01:35:00 1.175 51.900 2026/08/28 01:30:00 195 11.8 1.173 51.500 2026/08/28 01:25:00 1.173 51.500 2026/08/28 01:20:00 1.173 51.500 2026/08/28 01:15:00 195 11.7 1.174 51.700 2026/08/28 01:10:00 1.173 51.500 2026/08/28 01:05:00 1.173 51.500 2026/08/28 01:00:00 195 11.6 1.172 51.400 2026/08/28 00:55:00 1.174 51.700 2026/08/28 00:50:00 1.171 51.200 2026/08/28 00:45:00 195 11.5 1.174 51.700 2026/08/28 00:40:00 1.173 51.500 2026/08/28 00:35:00 1.173 51.500 2026/08/28 00:30:00 195 11.5 1.174 51.700 2026/08/28 00:25:00 1.172 51.400 2026/08/28 00:20:00 1.173 51.500 2026/08/28 00:15:00 195 11.5 1.173 51.500 2026/08/28 00:10:00 1.174 51.700 2026/08/28 00:05:00 1.174 51.700 2026/08/28 00:00:00 195 11.5 1.174 51.700 2026/08/27 23:55:00 1.175 51.900 2026/08/27 23:50:00 1.174 51.700 2026/08/27 23:45:00 195 11.6 1.174 51.700 2026/08/27 23:40:00 1.173 51.500 2026/08/27 23:35:00 1.175 51.900 2026/08/27 23:30:00 195 11.6 1.173 51.500 2026/08/27 23:25:00 1.173 51.500 2026/08/27 23:20:00 1.174 51.700 2026/08/27 23:15:00 195 11.5 1.172 51.400 2026/08/27 23:10:00 1.174 51.700 2026/08/27 23:05:00 1.174 51.700 2026/08/27 23:00:00 195 11.6 1.174 51.700 2026/08/27 22:55:00 1.173 51.500 2026/08/27 22:50:00 1.174 51.700 2026/08/27 22:45:00 195 11.6 1.174 51.700 2026/08/27 22:40:00 1.173 51.500 2026/08/27 22:35:00 1.174 51.700 2026/08/27 22:30:00 195 11.7 1.175 51.900 2026/08/27 22:25:00 1.173 51.500 2026/08/27 22:20:00 1.172 51.400 2026/08/27 22:15:00 195 11.7 1.173 51.500 2026/08/27 22:10:00 1.174 51.700 2026/08/27 22:05:00 1.173 51.500 2026/08/27 22:00:00 195 11.6 1.172 51.400 2026/08/27 21:55:00 1.173 51.500 2026/08/27 21:50:00 1.173 51.500 2026/08/27 21:45:00 195 11.7 1.174 51.700 2026/08/27 21:40:00 1.173 51.500 2026/08/27 21:35:00 1.174 51.700 2026/08/27 21:30:00 195 11.6 1.175 51.900 2026/08/27 21:25:00 1.173 51.500 2026/08/27 21:20:00 1.174 51.700 2026/08/27 21:15:00 195 11.7 1.173 51.500 2026/08/27 21:10:00 1.173 51.500 2026/08/27 21:05:00 1.172 51.400 2026/08/27 21:00:00 195 11.8 1.172 51.400 2026/08/27 20:55:00 1.173 51.500 2026/08/27 20:50:00 1.174 51.700 2026/08/27 20:45:00 195 11.8 1.171 51.200 2026/08/27 20:40:00 1.174 51.700 2026/08/27 20:35:00 1.173 51.500 2026/08/27 20:30:00 195 11.7 1.173 51.500 2026/08/27 20:25:00 1.172 51.400 2026/08/27 20:20:00 1.174 51.700 2026/08/27 20:15:00 195 11.5 1.173 51.500 2026/08/27 20:10:00 1.172 51.400 2026/08/27 20:05:00 1.173 51.500 2026/08/27 20:00:00 195 11.4 1.172 51.400 2026/08/27 19:55:00 1.174 51.700 2026/08/27 19:50:00 1.174 51.700 2026/08/27 19:45:00 195 11.4 1.173 51.500 2026/08/27 19:40:00 1.172 51.400 2026/08/27 19:35:00 1.172 51.400 2026/08/27 19:30:00 195 11.7 1.173 51.500 2026/08/27 19:25:00 1.174 51.700 2026/08/27 19:20:00 1.173 51.500 2026/08/27 19:15:00 195 12.2 1.174 51.700 2026/08/27 19:10:00 1.173 51.500 2026/08/27 19:05:00 1.172 51.400 2026/08/27 19:00:00 195 12.7 1.174 51.700 2026/08/27 18:55:00 1.173 51.500 2026/08/27 18:50:00 1.174 51.700 2026/08/27 18:45:00 195 13.1 1.172 51.400 2026/08/27 18:40:00 1.175 51.900 2026/08/27 18:35:00 1.174 51.700 2026/08/27 18:30:00 195 13.3 1.173 51.500 2026/08/27 18:25:00 1.174 51.700 2026/08/27 18:20:00 1.174 51.700 2026/08/27 18:15:00 195 13.4 1.174 51.700 2026/08/27 18:10:00 1.173 51.500 2026/08/27 18:05:00 1.174 51.700 2026/08/27 18:00:00 195 13.5 1.175 51.900 2026/08/27 17:55:00 1.175 51.900 2026/08/27 17:50:00 1.175 51.900 2026/08/27 17:45:00 195 13.6 1.174 51.700 2026/08/27 17:40:00 1.173 51.500 2026/08/27 17:35:00 1.174 51.700 2026/08/27 17:30:00 195 13.6 1.175 51.900 2026/08/27 17:25:00 1.174 51.700 2026/08/27 17:20:00 1.175 51.900 2026/08/27 17:15:00 194 13.6 1.175 51.900 2026/08/27 17:10:00 1.174 51.700 2026/08/27 17:05:00 1.175 51.900 2026/08/27 17:00:00 194 13.5 1.172 51.400 2026/08/27 16:55:00 1.173 51.500 2026/08/27 16:50:00 1.175 51.900 2026/08/27 16:45:00 194 13.6 1.173 51.500 2026/08/27 16:40:00 1.174 51.700 2026/08/27 16:35:00 1.175 51.900 2026/08/27 16:30:00 194 13.8 1.174 51.700 2026/08/27 16:25:00 1.174 51.700 2026/08/27 16:20:00 1.175 51.900 2026/08/27 16:15:00 194 14.7 1.175 51.900 2026/08/27 16:10:00 1.175 51.900 2026/08/27 16:05:00 1.175 51.900 2026/08/27 16:00:00 194 15.3 1.175 51.900 2026/08/27 15:55:00 1.175 51.900 2026/08/27 15:50:00 1.174 51.700 2026/08/27 15:45:00 194 15.4 1.175 51.900 2026/08/27 15:40:00 1.175 51.900 2026/08/27 15:35:00 1.174 51.700 2026/08/27 15:30:00 194 15.7 1.174 51.700 2026/08/27 15:25:00 1.175 51.900 2026/08/27 15:20:00 1.175 51.900 2026/08/27 15:15:00 194 16.5 1.175 51.900 2026/08/27 15:10:00 1.175 51.900 2026/08/27 15:05:00 1.175 51.900 2026/08/27 15:00:00 194 18.1 1.175 51.900 2026/08/27 14:55:00 1.175 51.900 2026/08/27 14:50:00 1.176 52.100 2026/08/27 14:45:00 194 19.2 1.174 51.700 2026/08/27 14:40:00 1.175 51.900 2026/08/27 14:35:00 1.175 51.900 2026/08/27 14:30:00 194 19.6 1.176 52.100 2026/08/27 14:25:00 1.175 51.900 2026/08/27 14:20:00 1.175 51.900 2026/08/27 14:15:00 194 19.5 1.177 52.300 2026/08/27 14:10:00 1.175 51.900 2026/08/27 14:05:00 1.176 52.100 2026/08/27 14:00:00 194 20.4 1.173 51.500 2026/08/27 13:55:00 1.177 52.300 2026/08/27 13:50:00 1.176 52.100 2026/08/27 13:45:00 194 20.2 1.175 51.900 2026/08/27 13:40:00 1.175 51.900 2026/08/27 13:35:00 1.175 51.900 2026/08/27 13:30:00 194 20.3 1.175 51.900 2026/08/27 13:25:00 1.176 52.100 2026/08/27 13:20:00 1.175 51.900 2026/08/27 13:15:00 194 20.0 1.175 51.900 2026/08/27 13:10:00 1.176 52.100 2026/08/27 13:05:00 1.174 51.700 2026/08/27 13:00:00 194 19.6 1.175 51.900 2026/08/27 12:55:00 1.176 52.100 2026/08/27 12:50:00 1.176 52.100 2026/08/27 12:45:00 194 19.2 1.175 51.900 2026/08/27 12:40:00 1.176 52.100 2026/08/27 12:35:00 1.177 52.300 2026/08/27 12:30:00 194 19.4 1.175 51.900 2026/08/27 12:25:00 1.176 52.100 2026/08/27 12:20:00 1.176 52.100 2026/08/27 12:15:00 194 19.4 1.176 52.100 2026/08/27 12:10:00 1.176 52.100 2026/08/27 12:05:00 1.177 52.300 2026/08/27 12:00:00 194 19.7 1.176 52.100 2026/08/27 11:55:00 1.177 52.300 2026/08/27 11:50:00 1.176 52.100 2026/08/27 11:45:00 194 19.4 1.177 52.300 2026/08/27 11:40:00 1.176 52.100 2026/08/27 11:35:00 1.176 52.100 2026/08/27 11:30:00 194 19.3 1.177 52.300 2026/08/27 11:25:00 1.177 52.300 2026/08/27 11:20:00 1.177 52.300 2026/08/27 11:15:00 194 19.0 1.176 52.100 2026/08/27 11:10:00 1.178 52.500 2026/08/27 11:05:00 1.177 52.300 2026/08/27 11:00:00 194 18.2 1.176 52.100 2026/08/27 10:55:00 1.177 52.300 2026/08/27 10:50:00 1.177 52.300 2026/08/27 10:45:00 194 17.7 1.178 52.500 2026/08/27 10:40:00 1.177 52.300 2026/08/27 10:35:00 1.177 52.300 2026/08/27 10:30:00 194 17.1 1.176 52.100 2026/08/27 10:25:00 1.177 52.300 2026/08/27 10:20:00 1.180 52.800 2026/08/27 10:15:00 194 16.7 1.177 52.300 2026/08/27 10:10:00 1.178 52.500 2026/08/27 10:05:00 1.178 52.500 2026/08/27 10:00:00 194 17.1 1.177 52.300 2026/08/27 09:55:00 1.178 52.500 2026/08/27 09:50:00 1.179 52.600 2026/08/27 09:45:00 194 17.1 1.179 52.600 2026/08/27 09:40:00 1.178 52.500 2026/08/27 09:35:00 1.178 52.500 2026/08/27 09:30:00 194 17.0 1.178 52.500 2026/08/27 09:25:00 1.178 52.500 2026/08/27 09:20:00 1.179 52.600 2026/08/27 09:15:00 194 16.3 1.178 52.500 2026/08/27 09:10:00 1.178 52.500 2026/08/27 09:05:00 1.179 52.600 2026/08/27 09:00:00 194 15.6 1.177 52.300 2026/08/27 08:55:00 1.178 52.500 2026/08/27 08:50:00 1.179 52.600 2026/08/27 08:45:00 194 15.0 1.179 52.600 2026/08/27 08:40:00 1.178 52.500 2026/08/27 08:35:00 1.177 52.300 2026/08/27 08:30:00 194 14.6 1.179 52.600 2026/08/27 08:25:00 1.178 52.500 2026/08/27 08:20:00 1.179 52.600 2026/08/27 08:15:00 194 14.1 1.179 52.600 2026/08/27 08:10:00 1.179 52.600 2026/08/27 08:05:00 1.179 52.600 2026/08/27 08:00:00 194 13.7 1.178 52.500 2026/08/27 07:55:00 1.179 52.600 2026/08/27 07:50:00 1.178 52.500 2026/08/27 07:45:00 194 12.7 1.178 52.500 2026/08/27 07:40:00 1.179 52.600 2026/08/27 07:35:00 1.179 52.600 2026/08/27 07:30:00 194 12.1 1.178 52.500 2026/08/27 07:25:00 1.179 52.600 2026/08/27 07:20:00 1.178 52.500 2026/08/27 07:15:00 194 11.4 1.179 52.600 2026/08/27 07:10:00 1.179 52.600 2026/08/27 07:05:00 1.179 52.600 2026/08/27 07:00:00 194 10.5 1.179 52.600 2026/08/27 06:55:00 1.180 52.800 2026/08/27 06:50:00 1.180 52.800 2026/08/27 06:45:00 194 9.7 1.179 52.600 2026/08/27 06:40:00 1.179 52.600 2026/08/27 06:35:00 1.180 52.800 2026/08/27 06:30:00 194 9.5 1.180 52.800 2026/08/27 06:25:00 1.180 52.800 2026/08/27 06:20:00 1.181 53.000 2026/08/27 06:15:00 194 9.5 1.180 52.800 2026/08/27 06:10:00 1.180 52.800 2026/08/27 06:05:00 1.179 52.600 2026/08/27 06:00:00 194 9.5 1.180 52.800 2026/08/27 05:55:00 1.180 52.800 2026/08/27 05:50:00 1.179 52.600 2026/08/27 05:45:00 194 9.3 1.180 52.800 2026/08/27 05:40:00 1.181 53.000 2026/08/27 05:35:00 1.180 52.800 2026/08/27 05:30:00 194 9.1 1.180 52.800 2026/08/27 05:25:00 1.180 52.800 2026/08/27 05:20:00 1.180 52.800 2026/08/27 05:15:00 194 9.2 1.180 52.800 2026/08/27 05:10:00 1.182 53.200 2026/08/27 05:05:00 1.180 52.800 2026/08/27 05:00:00 194 9.4 1.181 53.000 2026/08/27 04:55:00 1.181 53.000 2026/08/27 04:50:00 1.179 52.600 2026/08/27 04:45:00 194 9.6 1.181 53.000 2026/08/27 04:40:00 1.181 53.000 2026/08/27 04:35:00 1.181 53.000 2026/08/27 04:30:00 194 9.9 1.179 52.600 2026/08/27 04:25:00 1.180 52.800 2026/08/27 04:20:00 1.181 53.000 2026/08/27 04:15:00 194 10.1 1.180 52.800 2026/08/27 04:10:00 1.181 53.000 2026/08/27 04:05:00 1.181 53.000 2026/08/27 04:00:00 194 10.3 1.181 53.000 2026/08/27 03:55:00 1.181 53.000 2026/08/27 03:50:00 1.181 53.000 2026/08/27 03:45:00 194 10.4 1.180 52.800 2026/08/27 03:40:00 1.182 53.200 2026/08/27 03:35:00 1.182 53.200 2026/08/27 03:30:00 194 10.6 1.180 52.800 2026/08/27 03:25:00 1.181 53.000 2026/08/27 03:20:00 1.182 53.200 2026/08/27 03:15:00 194 10.8 1.182 53.200 2026/08/27 03:10:00 1.183 53.400 2026/08/27 03:05:00 1.183 53.400 2026/08/27 03:00:00 194 10.9 1.181 53.000 2026/08/27 02:55:00 1.182 53.200 2026/08/27 02:50:00 1.183 53.400 2026/08/27 02:45:00 194 10.9 1.183 53.400 2026/08/27 02:40:00 1.183 53.400 2026/08/27 02:35:00 1.183 53.400 2026/08/27 02:30:00 194 10.9 1.181 53.000 2026/08/27 02:25:00 1.183 53.400 2026/08/27 02:20:00 1.183 53.400 2026/08/27 02:15:00 194 10.7 1.181 53.000 2026/08/27 02:10:00 1.183 53.400 2026/08/27 02:05:00 1.183 53.400 2026/08/27 02:00:00 194 10.4 1.184 53.600 2026/08/27 01:55:00 1.183 53.400 2026/08/27 01:50:00 1.183 53.400 2026/08/27 01:45:00 194 10.1 1.182 53.200 2026/08/27 01:40:00 1.182 53.200 2026/08/27 01:35:00 1.184 53.600 2026/08/27 01:30:00 194 10.1 1.184 53.600 2026/08/27 01:25:00 1.184 53.600 2026/08/27 01:20:00 1.183 53.400 2026/08/27 01:15:00 194 10.2 1.183 53.400 2026/08/27 01:10:00 1.183 53.400 2026/08/27 01:05:00 1.182 53.200 2026/08/27 01:00:00 194 10.2 1.183 53.400 2026/08/27 00:55:00 1.183 53.400 2026/08/27 00:50:00 1.186 54.000 2026/08/27 00:45:00 194 10.4 1.183 53.400 2026/08/27 00:40:00 1.183 53.400 2026/08/27 00:35:00 1.184 53.600 2026/08/27 00:30:00 194 10.5 1.185 53.800 2026/08/27 00:25:00 1.184 53.600 2026/08/27 00:20:00 1.184 53.600 2026/08/27 00:15:00 194 10.5 1.185 53.800 2026/08/27 00:10:00 1.183 53.400 2026/08/27 00:05:00 1.185 53.800 2026/08/27 00:00:00 194 10.6 1.184 53.600 2026/08/26 23:55:00 1.184 53.600 2026/08/26 23:50:00 1.183 53.400 2026/08/26 23:45:00 194 10.8 1.184 53.600 2026/08/26 23:40:00 1.184 53.600 2026/08/26 23:35:00 1.184 53.600 2026/08/26 23:30:00 194 10.9 1.185 53.800 2026/08/26 23:25:00 1.185 53.800 2026/08/26 23:20:00 1.185 53.800 2026/08/26 23:15:00 194 10.9 1.184 53.600 2026/08/26 23:10:00 1.184 53.600 2026/08/26 23:05:00 1.185 53.800 2026/08/26 23:00:00 194 11.1 1.185 53.800 2026/08/26 22:55:00 1.186 54.000 2026/08/26 22:50:00 1.185 53.800 2026/08/26 22:45:00 194 11.3 1.185 53.800 2026/08/26 22:40:00 1.185 53.800 2026/08/26 22:35:00 1.186 54.000 2026/08/26 22:30:00 194 11.5 1.185 53.800 2026/08/26 22:25:00 1.184 53.600 2026/08/26 22:20:00 1.184 53.600 2026/08/26 22:15:00 194 11.6 1.185 53.800 2026/08/26 22:10:00 1.185 53.800 2026/08/26 22:05:00 1.185 53.800 2026/08/26 22:00:00 194 12.1 1.184 53.600 2026/08/26 21:55:00 1.185 53.800 2026/08/26 21:50:00 1.185 53.800 2026/08/26 21:45:00 194 12.3 1.185 53.800 2026/08/26 21:40:00 1.185 53.800 2026/08/26 21:35:00 1.186 54.000 2026/08/26 21:30:00 194 12.7 1.184 53.600 2026/08/26 21:25:00 1.185 53.800 2026/08/26 21:20:00 1.186 54.000 2026/08/26 21:15:00 194 12.8 1.185 53.800 2026/08/26 21:10:00 1.187 54.100 2026/08/26 21:05:00 1.186 54.000 2026/08/26 21:00:00 194 12.5 1.186 54.000 2026/08/26 20:55:00 1.185 53.800 2026/08/26 20:50:00 1.186 54.000 2026/08/26 20:45:00 194 12.7 1.186 54.000 2026/08/26 20:40:00 1.184 53.600 2026/08/26 20:35:00 1.187 54.100 2026/08/26 20:30:00 194 13.0 1.185 53.800 2026/08/26 20:25:00 1.186 54.000 2026/08/26 20:20:00 1.185 53.800 2026/08/26 20:15:00 194 13.4 1.188 54.300 2026/08/26 20:10:00 1.189 54.500 2026/08/26 20:05:00 1.186 54.000 2026/08/26 20:00:00 194 13.9 1.187 54.100 2026/08/26 19:55:00 1.186 54.000 2026/08/26 19:50:00 1.186 54.000 2026/08/26 19:45:00 194 14.6 1.185 53.800 2026/08/26 19:40:00 1.186 54.000 2026/08/26 19:35:00 1.187 54.100 2026/08/26 19:30:00 194 15.3 1.187 54.100 2026/08/26 19:25:00 1.186 54.000 2026/08/26 19:20:00 1.187 54.100 2026/08/26 19:15:00 194 16.1 1.187 54.100 2026/08/26 19:10:00 1.184 53.600 2026/08/26 19:05:00 1.187 54.100 2026/08/26 19:00:00 194 17.0 1.186 54.000 2026/08/26 18:55:00 1.185 53.800 2026/08/26 18:50:00 1.187 54.100 2026/08/26 18:45:00 194 17.8 1.187 54.100 2026/08/26 18:40:00 1.187 54.100 2026/08/26 18:35:00 1.187 54.100 2026/08/26 18:30:00 194 18.6 1.187 54.100 2026/08/26 18:25:00 1.187 54.100 2026/08/26 18:20:00 1.187 54.100 2026/08/26 18:15:00 194 19.0 1.188 54.300 2026/08/26 18:10:00 1.186 54.000 2026/08/26 18:05:00 1.187 54.100 2026/08/26 18:00:00 194 19.4 1.188 54.300 2026/08/26 17:55:00 1.187 54.100 2026/08/26 17:50:00 1.187 54.100 2026/08/26 17:45:00 194 19.8 1.187 54.100 2026/08/26 17:40:00 1.188 54.300 2026/08/26 17:35:00 1.188 54.300 2026/08/26 17:30:00 194 20.3 1.188 54.300 2026/08/26 17:25:00 1.187 54.100 2026/08/26 17:20:00 1.187 54.100 2026/08/26 17:15:00 194 20.6 1.188 54.300 2026/08/26 17:10:00 1.188 54.300 2026/08/26 17:05:00 1.188 54.300 2026/08/26 17:00:00 194 21.2 1.187 54.100 2026/08/26 16:55:00 1.188 54.300 2026/08/26 16:50:00 1.188 54.300 2026/08/26 16:45:00 194 21.9 1.188 54.300 2026/08/26 16:40:00 1.188 54.300 2026/08/26 16:35:00 1.187 54.100 2026/08/26 16:30:00 194 22.4 1.187 54.100 2026/08/26 16:25:00 1.187 54.100 2026/08/26 16:20:00 1.187 54.100 2026/08/26 16:15:00 194 23.4 1.186 54.000 2026/08/26 16:10:00 1.186 54.000 2026/08/26 16:05:00 1.188 54.300 2026/08/26 16:00:00 194 24.1 1.188 54.300 2026/08/26 15:55:00 1.187 54.100 2026/08/26 15:50:00 1.188 54.300 2026/08/26 15:45:00 194 24.6 1.188 54.300 2026/08/26 15:40:00 1.190 54.700 2026/08/26 15:35:00 1.189 54.500 2026/08/26 15:30:00 194 25.1 1.188 54.300 2026/08/26 15:25:00 1.189 54.500 2026/08/26 15:20:00 1.188 54.300 2026/08/26 15:15:00 194 25.0 1.188 54.300 2026/08/26 15:10:00 1.191 54.900 2026/08/26 15:05:00 1.188 54.300 2026/08/26 15:00:00 194 25.1 1.190 54.700 2026/08/26 14:55:00 1.188 54.300 2026/08/26 14:50:00 1.189 54.500 2026/08/26 14:45:00 194 24.6 1.189 54.500 2026/08/26 14:40:00 1.188 54.300 2026/08/26 14:35:00 1.189 54.500 2026/08/26 14:30:00 194 24.7 1.189 54.500 2026/08/26 14:25:00 1.188 54.300 2026/08/26 14:20:00 1.189 54.500 2026/08/26 14:15:00 194 25.5 1.188 54.300 2026/08/26 14:10:00 1.189 54.500 2026/08/26 14:05:00 1.189 54.500 2026/08/26 14:00:00 194 25.4 1.190 54.700 2026/08/26 13:55:00 1.188 54.300 2026/08/26 13:50:00 1.188 54.300 2026/08/26 13:45:00 194 25.3 1.187 54.100 2026/08/26 13:40:00 1.188 54.300 2026/08/26 13:35:00 1.189 54.500 2026/08/26 13:30:00 194 25.8 1.188 54.300 2026/08/26 13:25:00 1.188 54.300 2026/08/26 13:20:00 1.189 54.500 2026/08/26 13:15:00 194 25.9 1.189 54.500 2026/08/26 13:10:00 1.189 54.500 2026/08/26 13:05:00 1.188 54.300 2026/08/26 13:00:00 194 25.5 1.188 54.300 2026/08/26 12:55:00 1.189 54.500 2026/08/26 12:50:00 1.189 54.500 2026/08/26 12:45:00 194 25.6 1.189 54.500 2026/08/26 12:40:00 1.188 54.300 2026/08/26 12:35:00 1.189 54.500 2026/08/26 12:30:00 194 25.6 1.190 54.700 2026/08/26 12:25:00 1.188 54.300 2026/08/26 12:20:00 1.189 54.500 2026/08/26 12:15:00 194 25.6 1.187 54.100 2026/08/26 12:10:00 1.189 54.500 2026/08/26 12:05:00 1.190 54.700 2026/08/26 12:00:00 194 24.5 1.189 54.500 2026/08/26 11:55:00 1.191 54.900 2026/08/26 11:50:00 1.188 54.300 2026/08/26 11:45:00 194 24.4 1.188 54.300 2026/08/26 11:40:00 1.189 54.500 2026/08/26 11:35:00 1.189 54.500 2026/08/26 11:30:00 194 23.6 1.189 54.500 2026/08/26 11:25:00 1.190 54.700 2026/08/26 11:20:00 1.189 54.500 2026/08/26 11:15:00 194 23.0 1.190 54.700 2026/08/26 11:10:00 1.189 54.500 2026/08/26 11:05:00 1.190 54.700 2026/08/26 11:00:00 194 23.1 1.188 54.300 2026/08/26 10:55:00 1.190 54.700 2026/08/26 10:50:00 1.189 54.500 2026/08/26 10:45:00 194 22.2 1.188 54.300 2026/08/26 10:40:00 1.190 54.700 2026/08/26 10:35:00 1.190 54.700 2026/08/26 10:30:00 194 21.0 1.189 54.500 2026/08/26 10:25:00 1.189 54.500 2026/08/26 10:20:00 1.188 54.300 2026/08/26 10:15:00 194 20.4 1.189 54.500 2026/08/26 10:10:00 1.190 54.700 2026/08/26 10:05:00 1.189 54.500 2026/08/26 10:00:00 194 19.5 1.189 54.500 2026/08/26 09:55:00 1.189 54.500 2026/08/26 09:50:00 1.189 54.500 2026/08/26 09:45:00 194 18.6 1.189 54.500 2026/08/26 09:40:00 1.190 54.700 2026/08/26 09:35:00 1.190 54.700 2026/08/26 09:30:00 194 17.8 1.190 54.700 2026/08/26 09:25:00 1.190 54.700 2026/08/26 09:20:00 1.190 54.700 2026/08/26 09:15:00 194 16.2 1.189 54.500 2026/08/26 09:10:00 1.189 54.500 2026/08/26 09:05:00 1.190 54.700 2026/08/26 09:00:00 194 15.0 1.190 54.700 2026/08/26 08:55:00 1.189 54.500 2026/08/26 08:50:00 1.189 54.500 2026/08/26 08:45:00 194 14.2 1.190 54.700 2026/08/26 08:40:00 1.190 54.700 2026/08/26 08:35:00 1.189 54.500 2026/08/26 08:30:00 194 13.4 1.190 54.700 2026/08/26 08:25:00 1.191 54.900 2026/08/26 08:20:00 1.190 54.700 2026/08/26 08:15:00 194 12.8 1.190 54.700 2026/08/26 08:10:00 1.190 54.700 2026/08/26 08:05:00 1.190 54.700 2026/08/26 08:00:00 194 12.2 1.189 54.500 2026/08/26 07:55:00 1.190 54.700 2026/08/26 07:50:00 1.190 54.700 2026/08/26 07:45:00 194 11.6 1.189 54.500 2026/08/26 07:40:00 1.190 54.700 2026/08/26 07:35:00 1.190 54.700 2026/08/26 07:30:00 194 11.2 1.190 54.700 2026/08/26 07:25:00 1.191 54.900 2026/08/26 07:20:00 1.191 54.900 2026/08/26 07:15:00 194 10.8 1.190 54.700 2026/08/26 07:10:00 1.191 54.900 2026/08/26 07:05:00 1.189 54.500 2026/08/26 07:00:00 194 10.4 1.190 54.700 2026/08/26 06:55:00 1.190 54.700 2026/08/26 06:50:00 1.190 54.700 2026/08/26 06:45:00 194 9.6 1.190 54.700 2026/08/26 06:40:00 1.190 54.700 2026/08/26 06:35:00 1.190 54.700 2026/08/26 06:30:00 194 9.0 1.191 54.900 2026/08/26 06:25:00 1.191 54.900 2026/08/26 06:20:00 1.189 54.500 2026/08/26 06:15:00 194 8.2 1.191 54.900 2026/08/26 06:10:00 1.191 54.900 2026/08/26 06:05:00 1.190 54.700 2026/08/26 06:00:00 194 7.8 1.189 54.500 2026/08/26 05:55:00 1.191 54.900 2026/08/26 05:50:00 1.189 54.500 2026/08/26 05:45:00 194 7.5 1.191 54.900 2026/08/26 05:40:00 1.191 54.900 2026/08/26 05:35:00 1.190 54.700 2026/08/26 05:30:00 194 7.3 1.190 54.700 2026/08/26 05:25:00 1.191 54.900 2026/08/26 05:20:00 1.192 55.100 2026/08/26 05:15:00 194 7.6 1.191 54.900 2026/08/26 05:10:00 1.191 54.900 2026/08/26 05:05:00 1.191 54.900 2026/08/26 05:00:00 194 7.8 1.190 54.700 2026/08/26 04:55:00 1.191 54.900 2026/08/26 04:50:00 1.192 55.100 2026/08/26 04:45:00 194 8.0 1.192 55.100 2026/08/26 04:40:00 1.190 54.700 2026/08/26 04:35:00 1.191 54.900 2026/08/26 04:30:00 194 8.2 1.191 54.900 2026/08/26 04:25:00 1.191 54.900 2026/08/26 04:20:00 1.191 54.900 2026/08/26 04:15:00 194 8.2 1.191 54.900 2026/08/26 04:10:00 1.192 55.100 2026/08/26 04:05:00 1.192 55.100 2026/08/26 04:00:00 194 8.4 1.192 55.100 2026/08/26 03:55:00 1.192 55.100 2026/08/26 03:50:00 1.192 55.100 2026/08/26 03:45:00 194 8.6 1.192 55.100 2026/08/26 03:40:00 1.190 54.700 2026/08/26 03:35:00 1.192 55.100 2026/08/26 03:30:00 194 8.9 1.191 54.900 2026/08/26 03:25:00 1.192 55.100 2026/08/26 03:20:00 1.190 54.700 2026/08/26 03:15:00 194 9.3 1.192 55.100 2026/08/26 03:10:00 1.193 55.300 2026/08/26 03:05:00 1.192 55.100 2026/08/26 03:00:00 194 9.5 1.192 55.100 2026/08/26 02:55:00 1.192 55.100 2026/08/26 02:50:00 1.193 55.300 2026/08/26 02:45:00 194 9.7 1.192 55.100 2026/08/26 02:40:00 1.192 55.100 2026/08/26 02:35:00 1.192 55.100 2026/08/26 02:30:00 194 9.7 1.192 55.100 2026/08/26 02:25:00 1.191 54.900 2026/08/26 02:20:00 1.195 55.700 2026/08/26 02:15:00 194 10.1 1.192 55.100 2026/08/26 02:10:00 1.193 55.300 2026/08/26 02:05:00 1.192 55.100 2026/08/26 02:00:00 194 10.3 1.192 55.100 2026/08/26 01:55:00 1.193 55.300 2026/08/26 01:50:00 1.193 55.300 2026/08/26 01:45:00 194 10.4 1.193 55.300 2026/08/26 01:40:00 1.192 55.100 2026/08/26 01:35:00 1.193 55.300 2026/08/26 01:30:00 194 10.5 1.192 55.100 2026/08/26 01:25:00 1.193 55.300 2026/08/26 01:20:00 1.192 55.100 2026/08/26 01:15:00 194 10.7 1.193 55.300 2026/08/26 01:10:00 1.192 55.100 2026/08/26 01:05:00 1.194 55.500 2026/08/26 01:00:00 194 11.0 1.193 55.300 2026/08/26 00:55:00 1.193 55.300 2026/08/26 00:50:00 1.193 55.300 2026/08/26 00:45:00 194 11.3 1.193 55.300 2026/08/26 00:40:00 1.193 55.300 2026/08/26 00:35:00 1.194 55.500 2026/08/26 00:30:00 194 11.6 1.192 55.100 2026/08/26 00:25:00 1.194 55.500 2026/08/26 00:20:00 1.192 55.100 2026/08/26 00:15:00 194 12.1 1.193 55.300 2026/08/26 00:10:00 1.193 55.300 2026/08/26 00:05:00 1.194 55.500 2026/08/26 00:00:00 194 12.6 1.194 55.500