** BC HYDRO - GENERATION AND HYDROMETEOROLOGIC INFORMATION ** CLIMATE, SNOW AND/OR SURFACE WATER STATION: Omineca R ab Osilinka R (omi) Note: Data are provided for information only. BC Hydro does not guarantee their accuracy. Data are based on automated readings which are from time to time inaccurate. Date Time Air Temperature Water level Discharge (yyyy/mm/dd) (PST) (°C) (m) (cms) 2025/10/23 16:20:00 2.043 58.200 2025/10/23 16:15:00 2.042 58.000 2025/10/23 16:10:00 2.043 58.200 2025/10/23 16:05:00 2.043 58.200 2025/10/23 16:00:00 2.042 58.000 2025/10/23 15:55:00 2.043 58.200 2025/10/23 15:50:00 2.043 58.200 2025/10/23 15:45:00 2.042 58.000 2025/10/23 15:40:00 2.042 58.000 2025/10/23 15:35:00 2.043 58.200 2025/10/23 15:30:00 2.042 58.000 2025/10/23 15:25:00 2.042 58.000 2025/10/23 15:20:00 2.041 57.900 2025/10/23 15:15:00 2.042 58.000 2025/10/23 15:10:00 2.042 58.000 2025/10/23 15:05:00 2.042 58.000 2025/10/23 15:00:00 2.041 57.900 2025/10/23 14:55:00 2.040 57.700 2025/10/23 14:50:00 2.041 57.900 2025/10/23 14:45:00 2.041 57.900 2025/10/23 14:40:00 2.041 57.900 2025/10/23 14:35:00 2.040 57.700 2025/10/23 14:30:00 2.039 57.600 2025/10/23 14:25:00 2.040 57.700 2025/10/23 14:20:00 2.040 57.700 2025/10/23 14:15:00 2.040 57.700 2025/10/23 14:10:00 2.040 57.700 2025/10/23 14:05:00 2.039 57.600 2025/10/23 14:00:00 2.040 57.700 2025/10/23 13:55:00 2.039 57.600 2025/10/23 13:50:00 2.041 57.900 2025/10/23 13:45:00 2.040 57.700 2025/10/23 13:40:00 2.040 57.700 2025/10/23 13:35:00 2.041 57.900 2025/10/23 13:30:00 2.040 57.700 2025/10/23 13:25:00 2.041 57.900 2025/10/23 13:20:00 2.040 57.700 2025/10/23 13:15:00 2.041 57.900 2025/10/23 13:10:00 2.040 57.700 2025/10/23 13:05:00 2.040 57.700 2025/10/23 13:00:00 2.040 57.700 2025/10/23 12:55:00 2.041 57.900 2025/10/23 12:50:00 2.042 58.000 2025/10/23 12:45:00 2.042 58.000 2025/10/23 12:40:00 2.041 57.900 2025/10/23 12:35:00 2.042 58.000 2025/10/23 12:30:00 2.043 58.200 2025/10/23 12:25:00 2.043 58.200 2025/10/23 12:20:00 2.043 58.200 2025/10/23 12:15:00 2.041 57.900 2025/10/23 12:10:00 2.044 58.300 2025/10/23 12:05:00 2.044 58.300 2025/10/23 12:00:00 2.044 58.300 2025/10/23 11:55:00 2.043 58.200 2025/10/23 11:50:00 2.045 58.500 2025/10/23 11:45:00 2.044 58.300 2025/10/23 11:40:00 2.043 58.200 2025/10/23 11:35:00 2.045 58.500 2025/10/23 11:30:00 2.045 58.500 2025/10/23 11:25:00 2.045 58.500 2025/10/23 11:20:00 2.044 58.300 2025/10/23 11:15:00 2.044 58.300 2025/10/23 11:10:00 2.044 58.300 2025/10/23 11:05:00 2.043 58.200 2025/10/23 11:00:00 2.044 58.300 2025/10/23 10:55:00 2.044 58.300 2025/10/23 10:50:00 2.043 58.200 2025/10/23 10:45:00 2.045 58.500 2025/10/23 10:40:00 2.044 58.300 2025/10/23 10:35:00 2.044 58.300 2025/10/23 10:30:00 2.045 58.500 2025/10/23 10:25:00 2.045 58.500 2025/10/23 10:20:00 2.045 58.500 2025/10/23 10:15:00 2.044 58.300 2025/10/23 10:10:00 2.044 58.300 2025/10/23 10:05:00 2.044 58.300 2025/10/23 10:00:00 2.045 58.500 2025/10/23 09:55:00 2.044 58.300 2025/10/23 09:50:00 2.042 58.000 2025/10/23 09:45:00 2.043 58.200 2025/10/23 09:40:00 2.043 58.200 2025/10/23 09:35:00 2.043 58.200 2025/10/23 09:30:00 2.041 57.900 2025/10/23 09:25:00 2.042 58.000 2025/10/23 09:20:00 2.041 57.900 2025/10/23 09:15:00 2.042 58.000 2025/10/23 09:10:00 2.042 58.000 2025/10/23 09:05:00 2.043 58.200 2025/10/23 09:00:00 2.042 58.000 2025/10/23 08:55:00 2.043 58.200 2025/10/23 08:50:00 2.043 58.200 2025/10/23 08:45:00 2.044 58.300 2025/10/23 08:40:00 2.044 58.300 2025/10/23 08:35:00 2.044 58.300 2025/10/23 08:30:00 2.042 58.000 2025/10/23 08:25:00 2.044 58.300 2025/10/23 08:20:00 2.043 58.200 2025/10/23 08:15:00 2.043 58.200 2025/10/23 08:10:00 2.043 58.200 2025/10/23 08:05:00 2.043 58.200 2025/10/23 08:00:00 2.043 58.200 2025/10/23 07:55:00 2.043 58.200 2025/10/23 07:50:00 2.042 58.000 2025/10/23 07:45:00 2.044 58.300 2025/10/23 07:40:00 2.043 58.200 2025/10/23 07:35:00 2.043 58.200 2025/10/23 07:30:00 2.043 58.200 2025/10/23 07:25:00 2.044 58.300 2025/10/23 07:20:00 2.043 58.200 2025/10/23 07:15:00 2.042 58.000 2025/10/23 07:10:00 2.042 58.000 2025/10/23 07:05:00 2.042 58.000 2025/10/23 07:00:00 2.043 58.200 2025/10/23 06:55:00 2.043 58.200 2025/10/23 06:50:00 2.043 58.200 2025/10/23 06:45:00 2.043 58.200 2025/10/23 06:40:00 2.043 58.200 2025/10/23 06:35:00 2.043 58.200 2025/10/23 06:30:00 2.043 58.200 2025/10/23 06:25:00 2.042 58.000 2025/10/23 06:20:00 2.043 58.200 2025/10/23 06:15:00 2.044 58.300 2025/10/23 06:10:00 2.044 58.300 2025/10/23 06:05:00 2.044 58.300 2025/10/23 06:00:00 2.043 58.200 2025/10/23 05:55:00 2.044 58.300 2025/10/23 05:50:00 2.045 58.500 2025/10/23 05:45:00 2.045 58.500 2025/10/23 05:40:00 2.044 58.300 2025/10/23 05:35:00 2.044 58.300 2025/10/23 05:30:00 2.045 58.500 2025/10/23 05:25:00 2.046 58.600 2025/10/23 05:20:00 2.045 58.500 2025/10/23 05:15:00 2.045 58.500 2025/10/23 05:10:00 2.046 58.600 2025/10/23 05:05:00 2.046 58.600 2025/10/23 05:00:00 2.045 58.500 2025/10/23 04:55:00 2.046 58.600 2025/10/23 04:50:00 2.045 58.500 2025/10/23 04:45:00 2.046 58.600 2025/10/23 04:40:00 2.044 58.300 2025/10/23 04:35:00 2.045 58.500 2025/10/23 04:30:00 2.044 58.300 2025/10/23 04:25:00 2.046 58.600 2025/10/23 04:20:00 2.045 58.500 2025/10/23 04:15:00 2.045 58.500 2025/10/23 04:10:00 2.045 58.500 2025/10/23 04:05:00 2.045 58.500 2025/10/23 04:00:00 2.045 58.500 2025/10/23 03:55:00 2.045 58.500 2025/10/23 03:50:00 2.045 58.500 2025/10/23 03:45:00 2.046 58.600 2025/10/23 03:40:00 2.045 58.500 2025/10/23 03:35:00 2.045 58.500 2025/10/23 03:30:00 2.046 58.600 2025/10/23 03:25:00 2.046 58.600 2025/10/23 03:20:00 2.046 58.600 2025/10/23 03:15:00 2.046 58.600 2025/10/23 03:10:00 2.045 58.500 2025/10/23 03:05:00 2.045 58.500 2025/10/23 03:00:00 2.044 58.300 2025/10/23 02:55:00 2.045 58.500 2025/10/23 02:50:00 2.044 58.300 2025/10/23 02:45:00 2.044 58.300 2025/10/23 02:40:00 2.044 58.300 2025/10/23 02:35:00 2.045 58.500 2025/10/23 02:30:00 2.045 58.500 2025/10/23 02:25:00 2.045 58.500 2025/10/23 02:20:00 2.044 58.300 2025/10/23 02:15:00 2.044 58.300 2025/10/23 02:10:00 2.044 58.300 2025/10/23 02:05:00 2.044 58.300 2025/10/23 02:00:00 2.043 58.200 2025/10/23 01:55:00 2.044 58.300 2025/10/23 01:50:00 2.044 58.300 2025/10/23 01:45:00 2.044 58.300 2025/10/23 01:40:00 2.044 58.300 2025/10/23 01:35:00 2.043 58.200 2025/10/23 01:30:00 2.044 58.300 2025/10/23 01:25:00 2.043 58.200 2025/10/23 01:20:00 2.044 58.300 2025/10/23 01:15:00 2.044 58.300 2025/10/23 01:10:00 2.043 58.200 2025/10/23 01:05:00 2.044 58.300 2025/10/23 01:00:00 2.044 58.300 2025/10/23 00:55:00 2.044 58.300 2025/10/23 00:50:00 2.044 58.300 2025/10/23 00:45:00 2.043 58.200 2025/10/23 00:40:00 2.044 58.300 2025/10/23 00:35:00 2.044 58.300 2025/10/23 00:30:00 2.044 58.300 2025/10/23 00:25:00 2.044 58.300 2025/10/23 00:20:00 2.045 58.500 2025/10/23 00:15:00 2.044 58.300 2025/10/23 00:10:00 2.045 58.500 2025/10/23 00:05:00 2.044 58.300 2025/10/23 00:00:00 2.043 58.200 2025/10/22 23:55:00 2.044 58.300 2025/10/22 23:50:00 2.043 58.200 2025/10/22 23:45:00 2.043 58.200 2025/10/22 23:40:00 2.044 58.300 2025/10/22 23:35:00 2.044 58.300 2025/10/22 23:30:00 2.045 58.500 2025/10/22 23:25:00 2.044 58.300 2025/10/22 23:20:00 2.044 58.300 2025/10/22 23:15:00 2.044 58.300 2025/10/22 23:10:00 2.043 58.200 2025/10/22 23:05:00 2.044 58.300 2025/10/22 23:00:00 2.043 58.200 2025/10/22 22:55:00 2.043 58.200 2025/10/22 22:50:00 2.043 58.200 2025/10/22 22:45:00 2.043 58.200 2025/10/22 22:40:00 2.044 58.300 2025/10/22 22:35:00 2.044 58.300 2025/10/22 22:30:00 2.044 58.300 2025/10/22 22:25:00 2.044 58.300 2025/10/22 22:20:00 2.044 58.300 2025/10/22 22:15:00 2.044 58.300 2025/10/22 22:10:00 2.043 58.200 2025/10/22 22:05:00 2.044 58.300 2025/10/22 22:00:00 2.043 58.200 2025/10/22 21:55:00 2.044 58.300 2025/10/22 21:50:00 2.044 58.300 2025/10/22 21:45:00 2.044 58.300 2025/10/22 21:40:00 2.044 58.300 2025/10/22 21:35:00 2.044 58.300 2025/10/22 21:30:00 2.044 58.300 2025/10/22 21:25:00 2.044 58.300 2025/10/22 21:20:00 2.044 58.300 2025/10/22 21:15:00 2.043 58.200 2025/10/22 21:10:00 2.043 58.200 2025/10/22 21:05:00 2.043 58.200 2025/10/22 21:00:00 2.043 58.200 2025/10/22 20:55:00 2.043 58.200 2025/10/22 20:50:00 2.043 58.200 2025/10/22 20:45:00 2.044 58.300 2025/10/22 20:40:00 2.043 58.200 2025/10/22 20:35:00 2.043 58.200 2025/10/22 20:30:00 2.043 58.200 2025/10/22 20:25:00 2.043 58.200 2025/10/22 20:20:00 2.043 58.200 2025/10/22 20:15:00 2.044 58.300 2025/10/22 20:10:00 2.044 58.300 2025/10/22 20:05:00 2.043 58.200 2025/10/22 20:00:00 2.043 58.200 2025/10/22 19:55:00 2.044 58.300 2025/10/22 19:50:00 2.044 58.300 2025/10/22 19:45:00 2.044 58.300 2025/10/22 19:40:00 2.043 58.200 2025/10/22 19:35:00 2.043 58.200 2025/10/22 19:30:00 2.044 58.300 2025/10/22 19:25:00 2.044 58.300 2025/10/22 19:20:00 2.044 58.300 2025/10/22 19:15:00 2.044 58.300 2025/10/22 19:10:00 2.043 58.200 2025/10/22 19:05:00 2.043 58.200 2025/10/22 19:00:00 2.044 58.300 2025/10/22 18:55:00 2.045 58.500 2025/10/22 18:50:00 2.044 58.300 2025/10/22 18:45:00 2.045 58.500 2025/10/22 18:40:00 2.045 58.500 2025/10/22 18:35:00 2.044 58.300 2025/10/22 18:30:00 2.045 58.500 2025/10/22 18:25:00 2.044 58.300 2025/10/22 18:20:00 2.044 58.300 2025/10/22 18:15:00 2.044 58.300 2025/10/22 18:10:00 2.045 58.500 2025/10/22 18:05:00 2.045 58.500 2025/10/22 18:00:00 2.044 58.300 2025/10/22 17:55:00 2.045 58.500 2025/10/22 17:50:00 2.044 58.300 2025/10/22 17:45:00 2.045 58.500 2025/10/22 17:40:00 2.045 58.500 2025/10/22 17:35:00 2.045 58.500 2025/10/22 17:30:00 2.045 58.500 2025/10/22 17:25:00 2.045 58.500 2025/10/22 17:20:00 2.045 58.500 2025/10/22 17:15:00 2.045 58.500 2025/10/22 17:10:00 2.044 58.300 2025/10/22 17:05:00 2.044 58.300 2025/10/22 17:00:00 2.045 58.500 2025/10/22 16:55:00 2.045 58.500 2025/10/22 16:50:00 2.044 58.300 2025/10/22 16:45:00 2.046 58.600 2025/10/22 16:40:00 2.045 58.500 2025/10/22 16:35:00 2.046 58.600 2025/10/22 16:30:00 2.046 58.600 2025/10/22 16:25:00 2.045 58.500 2025/10/22 16:20:00 2.046 58.600 2025/10/22 16:15:00 2.046 58.600 2025/10/22 16:10:00 2.047 58.800 2025/10/22 16:05:00 2.046 58.600 2025/10/22 16:00:00 2.046 58.600 2025/10/22 15:55:00 2.047 58.800 2025/10/22 15:50:00 2.046 58.600 2025/10/22 15:45:00 2.047 58.800 2025/10/22 15:40:00 2.047 58.800 2025/10/22 15:35:00 2.046 58.600 2025/10/22 15:30:00 2.047 58.800 2025/10/22 15:25:00 2.047 58.800 2025/10/22 15:20:00 2.047 58.800 2025/10/22 15:15:00 2.046 58.600 2025/10/22 15:10:00 2.047 58.800 2025/10/22 15:05:00 2.047 58.800 2025/10/22 15:00:00 2.047 58.800 2025/10/22 14:55:00 2.047 58.800 2025/10/22 14:50:00 2.047 58.800 2025/10/22 14:45:00 2.048 58.900 2025/10/22 14:40:00 2.047 58.800 2025/10/22 14:35:00 2.048 58.900 2025/10/22 14:30:00 2.047 58.800 2025/10/22 14:25:00 2.048 58.900 2025/10/22 14:20:00 2.049 59.100 2025/10/22 14:15:00 2.047 58.800 2025/10/22 14:10:00 2.048 58.900 2025/10/22 14:05:00 2.048 58.900 2025/10/22 14:00:00 2.048 58.900 2025/10/22 13:55:00 2.048 58.900 2025/10/22 13:50:00 2.047 58.800 2025/10/22 13:45:00 2.047 58.800 2025/10/22 13:40:00 2.048 58.900 2025/10/22 13:35:00 2.047 58.800 2025/10/22 13:30:00 2.047 58.800 2025/10/22 13:25:00 2.047 58.800 2025/10/22 13:20:00 2.047 58.800 2025/10/22 13:15:00 2.046 58.600 2025/10/22 13:10:00 2.046 58.600 2025/10/22 13:05:00 2.046 58.600 2025/10/22 13:00:00 2.046 58.600 2025/10/22 12:55:00 2.045 58.500 2025/10/22 12:50:00 2.046 58.600 2025/10/22 12:45:00 2.046 58.600 2025/10/22 12:40:00 2.046 58.600 2025/10/22 12:35:00 2.046 58.600 2025/10/22 12:30:00 2.046 58.600 2025/10/22 12:25:00 2.046 58.600 2025/10/22 12:20:00 2.046 58.600 2025/10/22 12:15:00 2.045 58.500 2025/10/22 12:10:00 2.046 58.600 2025/10/22 12:05:00 2.047 58.800 2025/10/22 12:00:00 2.045 58.500 2025/10/22 11:55:00 2.047 58.800 2025/10/22 11:50:00 2.046 58.600 2025/10/22 11:45:00 2.046 58.600 2025/10/22 11:40:00 2.046 58.600 2025/10/22 11:35:00 2.046 58.600 2025/10/22 11:30:00 2.046 58.600 2025/10/22 11:25:00 2.046 58.600 2025/10/22 11:20:00 2.045 58.500 2025/10/22 11:15:00 2.046 58.600 2025/10/22 11:10:00 2.046 58.600 2025/10/22 11:05:00 2.046 58.600 2025/10/22 11:00:00 2.046 58.600 2025/10/22 10:55:00 2.047 58.800 2025/10/22 10:50:00 2.046 58.600 2025/10/22 10:45:00 2.046 58.600 2025/10/22 10:40:00 2.047 58.800 2025/10/22 10:35:00 2.046 58.600 2025/10/22 10:30:00 2.045 58.500 2025/10/22 10:25:00 2.046 58.600 2025/10/22 10:20:00 2.046 58.600 2025/10/22 10:15:00 2.047 58.800 2025/10/22 10:10:00 2.046 58.600 2025/10/22 10:05:00 2.046 58.600 2025/10/22 10:00:00 2.046 58.600 2025/10/22 09:55:00 2.047 58.800 2025/10/22 09:50:00 2.047 58.800 2025/10/22 09:45:00 2.047 58.800 2025/10/22 09:40:00 2.047 58.800 2025/10/22 09:35:00 2.048 58.900 2025/10/22 09:30:00 2.049 59.100 2025/10/22 09:25:00 2.048 58.900 2025/10/22 09:20:00 2.048 58.900 2025/10/22 09:15:00 2.049 59.100 2025/10/22 09:10:00 2.048 58.900 2025/10/22 09:05:00 2.049 59.100 2025/10/22 09:00:00 2.048 58.900 2025/10/22 08:55:00 2.046 58.600 2025/10/22 08:50:00 2.047 58.800 2025/10/22 08:45:00 2.048 58.900 2025/10/22 08:40:00 2.047 58.800 2025/10/22 08:35:00 2.048 58.900 2025/10/22 08:30:00 2.048 58.900 2025/10/22 08:25:00 2.047 58.800 2025/10/22 08:20:00 2.047 58.800 2025/10/22 08:15:00 2.048 58.900 2025/10/22 08:10:00 2.049 59.100 2025/10/22 08:05:00 2.048 58.900 2025/10/22 08:00:00 2.048 58.900 2025/10/22 07:55:00 2.049 59.100 2025/10/22 07:50:00 2.049 59.100 2025/10/22 07:45:00 2.049 59.100 2025/10/22 07:40:00 2.049 59.100 2025/10/22 07:35:00 2.048 58.900 2025/10/22 07:30:00 2.049 59.100 2025/10/22 07:25:00 2.048 58.900 2025/10/22 07:20:00 2.048 58.900 2025/10/22 07:15:00 2.048 58.900 2025/10/22 07:10:00 2.048 58.900 2025/10/22 07:05:00 2.049 59.100 2025/10/22 07:00:00 2.049 59.100 2025/10/22 06:55:00 2.048 58.900 2025/10/22 06:50:00 2.049 59.100 2025/10/22 06:45:00 2.048 58.900 2025/10/22 06:40:00 2.049 59.100 2025/10/22 06:35:00 2.049 59.100 2025/10/22 06:30:00 2.048 58.900 2025/10/22 06:25:00 2.049 59.100 2025/10/22 06:20:00 2.049 59.100 2025/10/22 06:15:00 2.049 59.100 2025/10/22 06:10:00 2.049 59.100 2025/10/22 06:05:00 2.049 59.100 2025/10/22 06:00:00 2.048 58.900 2025/10/22 05:55:00 2.049 59.100 2025/10/22 05:50:00 2.049 59.100 2025/10/22 05:45:00 2.048 58.900 2025/10/22 05:40:00 2.049 59.100 2025/10/22 05:35:00 2.049 59.100 2025/10/22 05:30:00 2.050 59.200 2025/10/22 05:25:00 2.050 59.200 2025/10/22 05:20:00 2.049 59.100 2025/10/22 05:15:00 2.050 59.200 2025/10/22 05:10:00 2.050 59.200 2025/10/22 05:05:00 2.049 59.100 2025/10/22 05:00:00 2.049 59.100 2025/10/22 04:55:00 2.049 59.100 2025/10/22 04:50:00 2.049 59.100 2025/10/22 04:45:00 2.049 59.100 2025/10/22 04:40:00 2.050 59.200 2025/10/22 04:35:00 2.049 59.100 2025/10/22 04:30:00 2.049 59.100 2025/10/22 04:25:00 2.049 59.100 2025/10/22 04:20:00 2.050 59.200 2025/10/22 04:15:00 2.050 59.200 2025/10/22 04:10:00 2.049 59.100 2025/10/22 04:05:00 2.050 59.200 2025/10/22 04:00:00 2.049 59.100 2025/10/22 03:55:00 2.049 59.100 2025/10/22 03:50:00 2.050 59.200 2025/10/22 03:45:00 2.049 59.100 2025/10/22 03:40:00 2.050 59.200 2025/10/22 03:35:00 2.050 59.200 2025/10/22 03:30:00 2.050 59.200 2025/10/22 03:25:00 2.049 59.100 2025/10/22 03:20:00 2.050 59.200 2025/10/22 03:15:00 2.050 59.200 2025/10/22 03:10:00 2.049 59.100 2025/10/22 03:05:00 2.051 59.400 2025/10/22 03:00:00 2.050 59.200 2025/10/22 02:55:00 2.050 59.200 2025/10/22 02:50:00 2.050 59.200 2025/10/22 02:45:00 2.050 59.200 2025/10/22 02:40:00 2.050 59.200 2025/10/22 02:35:00 2.051 59.400 2025/10/22 02:30:00 2.049 59.100 2025/10/22 02:25:00 2.050 59.200 2025/10/22 02:20:00 2.049 59.100 2025/10/22 02:15:00 2.050 59.200 2025/10/22 02:10:00 2.051 59.400 2025/10/22 02:05:00 2.051 59.400 2025/10/22 02:00:00 2.050 59.200 2025/10/22 01:55:00 2.051 59.400 2025/10/22 01:50:00 2.050 59.200 2025/10/22 01:45:00 2.050 59.200 2025/10/22 01:40:00 2.051 59.400 2025/10/22 01:35:00 2.051 59.400 2025/10/22 01:30:00 2.051 59.400 2025/10/22 01:25:00 2.050 59.200 2025/10/22 01:20:00 2.050 59.200 2025/10/22 01:15:00 2.051 59.400 2025/10/22 01:10:00 2.051 59.400 2025/10/22 01:05:00 2.051 59.400 2025/10/22 01:00:00 2.051 59.400 2025/10/22 00:55:00 2.052 59.500 2025/10/22 00:50:00 2.050 59.200 2025/10/22 00:45:00 2.051 59.400 2025/10/22 00:40:00 2.051 59.400 2025/10/22 00:35:00 2.052 59.500 2025/10/22 00:30:00 2.052 59.500 2025/10/22 00:25:00 2.052 59.500 2025/10/22 00:20:00 2.052 59.500 2025/10/22 00:15:00 2.051 59.400 2025/10/22 00:10:00 2.052 59.500 2025/10/22 00:05:00 2.051 59.400 2025/10/22 00:00:00 2.052 59.500 2025/10/21 23:55:00 2.051 59.400 2025/10/21 23:50:00 2.051 59.400 2025/10/21 23:45:00 2.052 59.500 2025/10/21 23:40:00 2.052 59.500 2025/10/21 23:35:00 2.052 59.500 2025/10/21 23:30:00 2.051 59.400 2025/10/21 23:25:00 2.052 59.500 2025/10/21 23:20:00 2.052 59.500 2025/10/21 23:15:00 2.051 59.400 2025/10/21 23:10:00 2.052 59.500 2025/10/21 23:05:00 2.051 59.400 2025/10/21 23:00:00 2.052 59.500 2025/10/21 22:55:00 2.052 59.500 2025/10/21 22:50:00 2.052 59.500 2025/10/21 22:45:00 2.052 59.500 2025/10/21 22:40:00 2.052 59.500 2025/10/21 22:35:00 2.052 59.500 2025/10/21 22:30:00 2.052 59.500 2025/10/21 22:25:00 2.051 59.400 2025/10/21 22:20:00 2.052 59.500 2025/10/21 22:15:00 2.052 59.500 2025/10/21 22:10:00 2.052 59.500 2025/10/21 22:05:00 2.053 59.700 2025/10/21 22:00:00 2.052 59.500 2025/10/21 21:55:00 2.053 59.700 2025/10/21 21:50:00 2.052 59.500 2025/10/21 21:45:00 2.052 59.500 2025/10/21 21:40:00 2.052 59.500 2025/10/21 21:35:00 2.052 59.500 2025/10/21 21:30:00 2.052 59.500 2025/10/21 21:25:00 2.052 59.500 2025/10/21 21:20:00 2.052 59.500 2025/10/21 21:15:00 2.053 59.700 2025/10/21 21:10:00 2.052 59.500 2025/10/21 21:05:00 2.052 59.500 2025/10/21 21:00:00 2.053 59.700 2025/10/21 20:55:00 2.053 59.700 2025/10/21 20:50:00 2.053 59.700 2025/10/21 20:45:00 2.053 59.700 2025/10/21 20:40:00 2.053 59.700 2025/10/21 20:35:00 2.053 59.700 2025/10/21 20:30:00 2.053 59.700 2025/10/21 20:25:00 2.053 59.700 2025/10/21 20:20:00 2.053 59.700 2025/10/21 20:15:00 2.053 59.700 2025/10/21 20:10:00 2.053 59.700 2025/10/21 20:05:00 2.053 59.700 2025/10/21 20:00:00 2.052 59.500 2025/10/21 19:55:00 2.053 59.700 2025/10/21 19:50:00 2.053 59.700 2025/10/21 19:45:00 2.053 59.700 2025/10/21 19:40:00 2.053 59.700 2025/10/21 19:35:00 2.053 59.700 2025/10/21 19:30:00 2.054 59.800 2025/10/21 19:25:00 2.053 59.700 2025/10/21 19:20:00 2.053 59.700 2025/10/21 19:15:00 2.053 59.700 2025/10/21 19:10:00 2.054 59.800 2025/10/21 19:05:00 2.054 59.800 2025/10/21 19:00:00 2.053 59.700 2025/10/21 18:55:00 2.053 59.700 2025/10/21 18:50:00 2.054 59.800 2025/10/21 18:45:00 2.053 59.700 2025/10/21 18:40:00 2.054 59.800 2025/10/21 18:35:00 2.053 59.700 2025/10/21 18:30:00 2.054 59.800 2025/10/21 18:25:00 2.054 59.800 2025/10/21 18:20:00 2.054 59.800 2025/10/21 18:15:00 2.054 59.800 2025/10/21 18:10:00 2.054 59.800 2025/10/21 18:05:00 2.055 60.000 2025/10/21 18:00:00 2.055 60.000 2025/10/21 17:55:00 2.054 59.800 2025/10/21 17:50:00 2.054 59.800 2025/10/21 17:45:00 2.055 60.000 2025/10/21 17:40:00 2.055 60.000 2025/10/21 17:35:00 2.053 59.700 2025/10/21 17:30:00 2.054 59.800 2025/10/21 17:25:00 2.054 59.800 2025/10/21 17:20:00 2.054 59.800 2025/10/21 17:15:00 2.055 60.000 2025/10/21 17:10:00 2.054 59.800 2025/10/21 17:05:00 2.055 60.000 2025/10/21 17:00:00 2.055 60.000 2025/10/21 16:55:00 2.054 59.800 2025/10/21 16:50:00 2.054 59.800 2025/10/21 16:45:00 2.055 60.000 2025/10/21 16:40:00 2.055 60.000 2025/10/21 16:35:00 2.054 59.800 2025/10/21 16:30:00 2.054 59.800 2025/10/21 16:25:00 2.055 60.000 2025/10/21 16:20:00 2.055 60.000 2025/10/21 16:15:00 2.054 59.800 2025/10/21 16:10:00 2.054 59.800 2025/10/21 16:05:00 2.053 59.700 2025/10/21 16:00:00 2.052 59.500 2025/10/21 15:55:00 2.053 59.700 2025/10/21 15:50:00 2.053 59.700 2025/10/21 15:45:00 2.053 59.700 2025/10/21 15:40:00 2.054 59.800 2025/10/21 15:35:00 2.053 59.700 2025/10/21 15:30:00 2.054 59.800 2025/10/21 15:25:00 2.053 59.700 2025/10/21 15:20:00 2.053 59.700 2025/10/21 15:15:00 2.053 59.700 2025/10/21 15:10:00 2.053 59.700 2025/10/21 15:05:00 2.053 59.700 2025/10/21 15:00:00 2.054 59.800 2025/10/21 14:55:00 2.054 59.800 2025/10/21 14:50:00 2.053 59.700 2025/10/21 14:45:00 2.053 59.700 2025/10/21 14:40:00 2.054 59.800 2025/10/21 14:35:00 2.054 59.800 2025/10/21 14:30:00 2.054 59.800 2025/10/21 14:25:00 2.053 59.700 2025/10/21 14:20:00 2.054 59.800 2025/10/21 14:15:00 2.054 59.800 2025/10/21 14:10:00 2.054 59.800 2025/10/21 14:05:00 2.053 59.700 2025/10/21 14:00:00 2.055 60.000 2025/10/21 13:55:00 2.054 59.800 2025/10/21 13:50:00 2.053 59.700 2025/10/21 13:45:00 2.053 59.700 2025/10/21 13:40:00 2.053 59.700 2025/10/21 13:35:00 2.054 59.800 2025/10/21 13:30:00 2.053 59.700 2025/10/21 13:25:00 2.054 59.800 2025/10/21 13:20:00 2.054 59.800 2025/10/21 13:15:00 2.053 59.700 2025/10/21 13:10:00 2.055 60.000 2025/10/21 13:05:00 2.055 60.000 2025/10/21 13:00:00 2.055 60.000 2025/10/21 12:55:00 2.054 59.800 2025/10/21 12:50:00 2.054 59.800 2025/10/21 12:45:00 2.055 60.000 2025/10/21 12:40:00 2.056 60.100 2025/10/21 12:35:00 2.055 60.000 2025/10/21 12:30:00 2.055 60.000 2025/10/21 12:25:00 2.055 60.000 2025/10/21 12:20:00 2.055 60.000 2025/10/21 12:15:00 2.055 60.000 2025/10/21 12:10:00 2.054 59.800 2025/10/21 12:05:00 2.055 60.000 2025/10/21 12:00:00 2.055 60.000 2025/10/21 11:55:00 2.055 60.000 2025/10/21 11:50:00 2.054 59.800 2025/10/21 11:45:00 2.056 60.100 2025/10/21 11:40:00 2.055 60.000 2025/10/21 11:35:00 2.056 60.100 2025/10/21 11:30:00 2.055 60.000 2025/10/21 11:25:00 2.055 60.000 2025/10/21 11:20:00 2.055 60.000 2025/10/21 11:15:00 2.055 60.000 2025/10/21 11:10:00 2.054 59.800 2025/10/21 11:05:00 2.054 59.800 2025/10/21 11:00:00 2.056 60.100 2025/10/21 10:55:00 2.056 60.100 2025/10/21 10:50:00 2.056 60.100 2025/10/21 10:45:00 2.055 60.000 2025/10/21 10:40:00 2.055 60.000 2025/10/21 10:35:00 2.056 60.100 2025/10/21 10:30:00 2.056 60.100 2025/10/21 10:25:00 2.055 60.000 2025/10/21 10:20:00 2.054 59.800 2025/10/21 10:15:00 2.056 60.100 2025/10/21 10:10:00 2.056 60.100 2025/10/21 10:05:00 2.057 60.300 2025/10/21 10:00:00 2.057 60.300 2025/10/21 09:55:00 2.056 60.100 2025/10/21 09:50:00 2.056 60.100 2025/10/21 09:45:00 2.055 60.000 2025/10/21 09:40:00 2.056 60.100 2025/10/21 09:35:00 2.055 60.000 2025/10/21 09:30:00 2.055 60.000 2025/10/21 09:25:00 2.057 60.300 2025/10/21 09:20:00 2.056 60.100 2025/10/21 09:15:00 2.056 60.100 2025/10/21 09:10:00 2.056 60.100 2025/10/21 09:05:00 2.055 60.000 2025/10/21 09:00:00 2.055 60.000 2025/10/21 08:55:00 2.055 60.000 2025/10/21 08:50:00 2.056 60.100 2025/10/21 08:45:00 2.056 60.100 2025/10/21 08:40:00 2.057 60.300 2025/10/21 08:35:00 2.055 60.000 2025/10/21 08:30:00 2.056 60.100 2025/10/21 08:25:00 2.057 60.300 2025/10/21 08:20:00 2.056 60.100 2025/10/21 08:15:00 2.056 60.100 2025/10/21 08:10:00 2.056 60.100 2025/10/21 08:05:00 2.056 60.100 2025/10/21 08:00:00 2.057 60.300 2025/10/21 07:55:00 2.056 60.100 2025/10/21 07:50:00 2.057 60.300 2025/10/21 07:45:00 2.057 60.300 2025/10/21 07:40:00 2.057 60.300 2025/10/21 07:35:00 2.057 60.300 2025/10/21 07:30:00 2.056 60.100 2025/10/21 07:25:00 2.056 60.100 2025/10/21 07:20:00 2.056 60.100 2025/10/21 07:15:00 2.057 60.300 2025/10/21 07:10:00 2.057 60.300 2025/10/21 07:05:00 2.057 60.300 2025/10/21 07:00:00 2.057 60.300 2025/10/21 06:55:00 2.058 60.400 2025/10/21 06:50:00 2.057 60.300 2025/10/21 06:45:00 2.057 60.300 2025/10/21 06:40:00 2.057 60.300 2025/10/21 06:35:00 2.058 60.400 2025/10/21 06:30:00 2.057 60.300 2025/10/21 06:25:00 2.057 60.300 2025/10/21 06:20:00 2.058 60.400 2025/10/21 06:15:00 2.057 60.300 2025/10/21 06:10:00 2.056 60.100 2025/10/21 06:05:00 2.057 60.300 2025/10/21 06:00:00 2.057 60.300 2025/10/21 05:55:00 2.056 60.100 2025/10/21 05:50:00 2.057 60.300 2025/10/21 05:45:00 2.057 60.300 2025/10/21 05:40:00 2.057 60.300 2025/10/21 05:35:00 2.057 60.300 2025/10/21 05:30:00 2.058 60.400 2025/10/21 05:25:00 2.057 60.300 2025/10/21 05:20:00 2.057 60.300 2025/10/21 05:15:00 2.057 60.300 2025/10/21 05:10:00 2.057 60.300 2025/10/21 05:05:00 2.057 60.300 2025/10/21 05:00:00 2.058 60.400 2025/10/21 04:55:00 2.059 60.600 2025/10/21 04:50:00 2.058 60.400 2025/10/21 04:45:00 2.057 60.300 2025/10/21 04:40:00 2.057 60.300 2025/10/21 04:35:00 2.059 60.600 2025/10/21 04:30:00 2.057 60.300 2025/10/21 04:25:00 2.058 60.400 2025/10/21 04:20:00 2.058 60.400 2025/10/21 04:15:00 2.058 60.400 2025/10/21 04:10:00 2.058 60.400 2025/10/21 04:05:00 2.058 60.400 2025/10/21 04:00:00 2.058 60.400 2025/10/21 03:55:00 2.058 60.400 2025/10/21 03:50:00 2.058 60.400 2025/10/21 03:45:00 2.058 60.400 2025/10/21 03:40:00 2.058 60.400 2025/10/21 03:35:00 2.058 60.400 2025/10/21 03:30:00 2.059 60.600 2025/10/21 03:25:00 2.058 60.400 2025/10/21 03:20:00 2.057 60.300 2025/10/21 03:15:00 2.059 60.600 2025/10/21 03:10:00 2.059 60.600 2025/10/21 03:05:00 2.059 60.600 2025/10/21 03:00:00 2.059 60.600 2025/10/21 02:55:00 2.059 60.600 2025/10/21 02:50:00 2.059 60.600 2025/10/21 02:45:00 2.058 60.400 2025/10/21 02:40:00 2.058 60.400 2025/10/21 02:35:00 2.058 60.400 2025/10/21 02:30:00 2.059 60.600 2025/10/21 02:25:00 2.059 60.600 2025/10/21 02:20:00 2.059 60.600 2025/10/21 02:15:00 2.059 60.600 2025/10/21 02:10:00 2.058 60.400 2025/10/21 02:05:00 2.059 60.600 2025/10/21 02:00:00 2.058 60.400 2025/10/21 01:55:00 2.059 60.600 2025/10/21 01:50:00 2.059 60.600 2025/10/21 01:45:00 2.059 60.600 2025/10/21 01:40:00 2.059 60.600 2025/10/21 01:35:00 2.059 60.600 2025/10/21 01:30:00 2.059 60.600 2025/10/21 01:25:00 2.060 60.700 2025/10/21 01:20:00 2.060 60.700 2025/10/21 01:15:00 2.060 60.700 2025/10/21 01:10:00 2.060 60.700 2025/10/21 01:05:00 2.059 60.600 2025/10/21 01:00:00 2.059 60.600 2025/10/21 00:55:00 2.058 60.400 2025/10/21 00:50:00 2.058 60.400 2025/10/21 00:45:00 2.059 60.600 2025/10/21 00:40:00 2.060 60.700 2025/10/21 00:35:00 2.059 60.600 2025/10/21 00:30:00 2.059 60.600 2025/10/21 00:25:00 2.059 60.600 2025/10/21 00:20:00 2.059 60.600 2025/10/21 00:15:00 2.060 60.700 2025/10/21 00:10:00 2.059 60.600 2025/10/21 00:05:00 2.060 60.700 2025/10/21 00:00:00 2.059 60.600 2025/10/20 23:55:00 2.060 60.700 2025/10/20 23:50:00 2.059 60.600 2025/10/20 23:45:00 2.060 60.700 2025/10/20 23:40:00 2.060 60.700 2025/10/20 23:35:00 2.059 60.600 2025/10/20 23:30:00 2.061 60.900 2025/10/20 23:25:00 2.059 60.600 2025/10/20 23:20:00 2.060 60.700 2025/10/20 23:15:00 2.060 60.700 2025/10/20 23:10:00 2.060 60.700 2025/10/20 23:05:00 2.060 60.700 2025/10/20 23:00:00 2.060 60.700 2025/10/20 22:55:00 2.060 60.700 2025/10/20 22:50:00 2.060 60.700 2025/10/20 22:45:00 2.060 60.700 2025/10/20 22:40:00 2.060 60.700 2025/10/20 22:35:00 2.061 60.900 2025/10/20 22:30:00 2.061 60.900 2025/10/20 22:25:00 2.060 60.700 2025/10/20 22:20:00 2.060 60.700 2025/10/20 22:15:00 2.061 60.900 2025/10/20 22:10:00 2.060 60.700 2025/10/20 22:05:00 2.061 60.900 2025/10/20 22:00:00 2.060 60.700 2025/10/20 21:55:00 2.059 60.600 2025/10/20 21:50:00 2.060 60.700 2025/10/20 21:45:00 2.061 60.900 2025/10/20 21:40:00 2.061 60.900 2025/10/20 21:35:00 2.061 60.900 2025/10/20 21:30:00 2.061 60.900 2025/10/20 21:25:00 2.062 61.000 2025/10/20 21:20:00 2.060 60.700 2025/10/20 21:15:00 2.061 60.900 2025/10/20 21:10:00 2.061 60.900 2025/10/20 21:05:00 2.060 60.700 2025/10/20 21:00:00 2.060 60.700 2025/10/20 20:55:00 2.061 60.900 2025/10/20 20:50:00 2.061 60.900 2025/10/20 20:45:00 2.060 60.700 2025/10/20 20:40:00 2.061 60.900 2025/10/20 20:35:00 2.060 60.700 2025/10/20 20:30:00 2.062 61.000 2025/10/20 20:25:00 2.061 60.900 2025/10/20 20:20:00 2.061 60.900 2025/10/20 20:15:00 2.061 60.900 2025/10/20 20:10:00 2.061 60.900 2025/10/20 20:05:00 2.061 60.900 2025/10/20 20:00:00 2.059 60.600 2025/10/20 19:55:00 2.059 60.600 2025/10/20 19:50:00 2.061 60.900 2025/10/20 19:45:00 2.061 60.900 2025/10/20 19:40:00 2.061 60.900 2025/10/20 19:35:00 2.061 60.900 2025/10/20 19:30:00 2.061 60.900 2025/10/20 19:25:00 2.062 61.000 2025/10/20 19:20:00 2.061 60.900 2025/10/20 19:15:00 2.060 60.700 2025/10/20 19:10:00 2.062 61.000 2025/10/20 19:05:00 2.060 60.700 2025/10/20 19:00:00 2.061 60.900 2025/10/20 18:55:00 2.060 60.700 2025/10/20 18:50:00 2.061 60.900 2025/10/20 18:45:00 2.060 60.700 2025/10/20 18:40:00 2.060 60.700 2025/10/20 18:35:00 2.060 60.700 2025/10/20 18:30:00 2.061 60.900 2025/10/20 18:25:00 2.060 60.700 2025/10/20 18:20:00 2.061 60.900 2025/10/20 18:15:00 2.060 60.700 2025/10/20 18:10:00 2.060 60.700 2025/10/20 18:05:00 2.061 60.900 2025/10/20 18:00:00 2.062 61.000 2025/10/20 17:55:00 2.062 61.000 2025/10/20 17:50:00 2.061 60.900 2025/10/20 17:45:00 2.062 61.000 2025/10/20 17:40:00 2.061 60.900 2025/10/20 17:35:00 2.061 60.900 2025/10/20 17:30:00 2.061 60.900 2025/10/20 17:25:00 2.062 61.000 2025/10/20 17:20:00 2.061 60.900 2025/10/20 17:15:00 2.061 60.900 2025/10/20 17:10:00 2.061 60.900 2025/10/20 17:05:00 2.061 60.900 2025/10/20 17:00:00 2.062 61.000 2025/10/20 16:55:00 2.061 60.900 2025/10/20 16:50:00 2.062 61.000 2025/10/20 16:45:00 2.062 61.000 2025/10/20 16:40:00 2.062 61.000 2025/10/20 16:35:00 2.062 61.000 2025/10/20 16:30:00 2.062 61.000 2025/10/20 16:25:00 2.063 61.200 2025/10/20 16:20:00 2.063 61.200 2025/10/20 16:15:00 2.063 61.200 2025/10/20 16:10:00 2.063 61.200 2025/10/20 16:05:00 2.063 61.200 2025/10/20 16:00:00 2.063 61.200 2025/10/20 15:55:00 2.063 61.200 2025/10/20 15:50:00 2.062 61.000 2025/10/20 15:45:00 2.062 61.000 2025/10/20 15:40:00 2.062 61.000 2025/10/20 15:35:00 2.063 61.200 2025/10/20 15:30:00 2.063 61.200 2025/10/20 15:25:00 2.063 61.200 2025/10/20 15:20:00 2.063 61.200 2025/10/20 15:15:00 2.063 61.200 2025/10/20 15:10:00 2.063 61.200 2025/10/20 15:05:00 2.064 61.300 2025/10/20 15:00:00 2.063 61.200 2025/10/20 14:55:00 2.064 61.300 2025/10/20 14:50:00 2.063 61.200 2025/10/20 14:45:00 2.064 61.300 2025/10/20 14:40:00 2.064 61.300 2025/10/20 14:35:00 2.064 61.300 2025/10/20 14:30:00 2.062 61.000 2025/10/20 14:25:00 2.063 61.200 2025/10/20 14:20:00 2.063 61.200 2025/10/20 14:15:00 2.064 61.300 2025/10/20 14:10:00 2.065 61.500 2025/10/20 14:05:00 2.064 61.300 2025/10/20 14:00:00 2.065 61.500 2025/10/20 13:55:00 2.064 61.300 2025/10/20 13:50:00 2.065 61.500 2025/10/20 13:45:00 2.066 61.700 2025/10/20 13:40:00 2.065 61.500 2025/10/20 13:35:00 2.065 61.500 2025/10/20 13:30:00 2.066 61.700 2025/10/20 13:25:00 2.065 61.500 2025/10/20 13:20:00 2.064 61.300 2025/10/20 13:15:00 2.064 61.300 2025/10/20 13:10:00 2.065 61.500 2025/10/20 13:05:00 2.065 61.500 2025/10/20 13:00:00 2.065 61.500 2025/10/20 12:55:00 2.066 61.700 2025/10/20 12:50:00 2.065 61.500 2025/10/20 12:45:00 2.065 61.500 2025/10/20 12:40:00 2.065 61.500 2025/10/20 12:35:00 2.065 61.500 2025/10/20 12:30:00 2.065 61.500 2025/10/20 12:25:00 2.065 61.500 2025/10/20 12:20:00 2.065 61.500 2025/10/20 12:15:00 2.066 61.700 2025/10/20 12:10:00 2.066 61.700 2025/10/20 12:05:00 2.065 61.500 2025/10/20 12:00:00 2.065 61.500 2025/10/20 11:55:00 2.065 61.500 2025/10/20 11:50:00 2.065 61.500 2025/10/20 11:45:00 2.065 61.500 2025/10/20 11:40:00 2.065 61.500 2025/10/20 11:35:00 2.066 61.700 2025/10/20 11:30:00 2.065 61.500 2025/10/20 11:25:00 2.065 61.500 2025/10/20 11:20:00 2.065 61.500 2025/10/20 11:15:00 2.066 61.700 2025/10/20 11:10:00 2.065 61.500 2025/10/20 11:05:00 2.064 61.300 2025/10/20 11:00:00 2.065 61.500 2025/10/20 10:55:00 2.065 61.500 2025/10/20 10:50:00 2.066 61.700 2025/10/20 10:45:00 2.065 61.500 2025/10/20 10:40:00 2.065 61.500 2025/10/20 10:35:00 2.065 61.500 2025/10/20 10:30:00 2.065 61.500 2025/10/20 10:25:00 2.066 61.700 2025/10/20 10:20:00 2.065 61.500 2025/10/20 10:15:00 2.064 61.300 2025/10/20 10:10:00 2.064 61.300 2025/10/20 10:05:00 2.064 61.300 2025/10/20 10:00:00 2.065 61.500 2025/10/20 09:55:00 2.066 61.700 2025/10/20 09:50:00 2.065 61.500 2025/10/20 09:45:00 2.065 61.500 2025/10/20 09:40:00 2.066 61.700 2025/10/20 09:35:00 2.064 61.300 2025/10/20 09:30:00 2.065 61.500 2025/10/20 09:25:00 2.065 61.500 2025/10/20 09:20:00 2.065 61.500 2025/10/20 09:15:00 2.065 61.500 2025/10/20 09:10:00 2.064 61.300 2025/10/20 09:05:00 2.065 61.500 2025/10/20 09:00:00 2.065 61.500 2025/10/20 08:55:00 2.065 61.500 2025/10/20 08:50:00 2.065 61.500 2025/10/20 08:45:00 2.065 61.500 2025/10/20 08:40:00 2.066 61.700 2025/10/20 08:35:00 2.065 61.500 2025/10/20 08:30:00 2.065 61.500 2025/10/20 08:25:00 2.066 61.700 2025/10/20 08:20:00 2.066 61.700 2025/10/20 08:15:00 2.067 61.800 2025/10/20 08:10:00 2.066 61.700 2025/10/20 08:05:00 2.066 61.700 2025/10/20 08:00:00 2.066 61.700 2025/10/20 07:55:00 2.066 61.700 2025/10/20 07:50:00 2.067 61.800 2025/10/20 07:45:00 2.065 61.500 2025/10/20 07:40:00 2.065 61.500 2025/10/20 07:35:00 2.066 61.700 2025/10/20 07:30:00 2.067 61.800 2025/10/20 07:25:00 2.065 61.500 2025/10/20 07:20:00 2.066 61.700 2025/10/20 07:15:00 2.066 61.700 2025/10/20 07:10:00 2.066 61.700 2025/10/20 07:05:00 2.066 61.700 2025/10/20 07:00:00 2.066 61.700 2025/10/20 06:55:00 2.066 61.700 2025/10/20 06:50:00 2.066 61.700 2025/10/20 06:45:00 2.066 61.700 2025/10/20 06:40:00 2.066 61.700 2025/10/20 06:35:00 2.067 61.800 2025/10/20 06:30:00 2.067 61.800 2025/10/20 06:25:00 2.066 61.700 2025/10/20 06:20:00 2.066 61.700 2025/10/20 06:15:00 2.066 61.700 2025/10/20 06:10:00 2.067 61.800 2025/10/20 06:05:00 2.066 61.700 2025/10/20 06:00:00 2.066 61.700 2025/10/20 05:55:00 2.068 62.000 2025/10/20 05:50:00 2.067 61.800 2025/10/20 05:45:00 2.066 61.700 2025/10/20 05:40:00 2.067 61.800 2025/10/20 05:35:00 2.067 61.800 2025/10/20 05:30:00 2.067 61.800 2025/10/20 05:25:00 2.066 61.700 2025/10/20 05:20:00 2.067 61.800 2025/10/20 05:15:00 2.067 61.800 2025/10/20 05:10:00 2.068 62.000 2025/10/20 05:05:00 2.068 62.000 2025/10/20 05:00:00 2.068 62.000 2025/10/20 04:55:00 2.068 62.000 2025/10/20 04:50:00 2.067 61.800 2025/10/20 04:45:00 2.067 61.800 2025/10/20 04:40:00 2.067 61.800 2025/10/20 04:35:00 2.067 61.800 2025/10/20 04:30:00 2.067 61.800 2025/10/20 04:25:00 2.067 61.800 2025/10/20 04:20:00 2.067 61.800 2025/10/20 04:15:00 2.067 61.800 2025/10/20 04:10:00 2.068 62.000 2025/10/20 04:05:00 2.068 62.000 2025/10/20 04:00:00 2.068 62.000 2025/10/20 03:55:00 2.068 62.000 2025/10/20 03:50:00 2.069 62.100 2025/10/20 03:45:00 2.068 62.000 2025/10/20 03:40:00 2.068 62.000 2025/10/20 03:35:00 2.068 62.000 2025/10/20 03:30:00 2.067 61.800 2025/10/20 03:25:00 2.069 62.100 2025/10/20 03:20:00 2.069 62.100 2025/10/20 03:15:00 2.068 62.000 2025/10/20 03:10:00 2.069 62.100 2025/10/20 03:05:00 2.068 62.000 2025/10/20 03:00:00 2.069 62.100 2025/10/20 02:55:00 2.070 62.300 2025/10/20 02:50:00 2.069 62.100 2025/10/20 02:45:00 2.069 62.100 2025/10/20 02:40:00 2.069 62.100 2025/10/20 02:35:00 2.069 62.100 2025/10/20 02:30:00 2.069 62.100 2025/10/20 02:25:00 2.069 62.100 2025/10/20 02:20:00 2.068 62.000 2025/10/20 02:15:00 2.069 62.100 2025/10/20 02:10:00 2.069 62.100 2025/10/20 02:05:00 2.070 62.300 2025/10/20 02:00:00 2.069 62.100 2025/10/20 01:55:00 2.070 62.300 2025/10/20 01:50:00 2.069 62.100 2025/10/20 01:45:00 2.070 62.300 2025/10/20 01:40:00 2.068 62.000 2025/10/20 01:35:00 2.069 62.100 2025/10/20 01:30:00 2.069 62.100 2025/10/20 01:25:00 2.069 62.100 2025/10/20 01:20:00 2.070 62.300 2025/10/20 01:15:00 2.070 62.300 2025/10/20 01:10:00 2.070 62.300 2025/10/20 01:05:00 2.070 62.300 2025/10/20 01:00:00 2.071 62.400 2025/10/20 00:55:00 2.070 62.300 2025/10/20 00:50:00 2.070 62.300 2025/10/20 00:45:00 2.069 62.100 2025/10/20 00:40:00 2.069 62.100 2025/10/20 00:35:00 2.070 62.300 2025/10/20 00:30:00 2.069 62.100 2025/10/20 00:25:00 2.069 62.100 2025/10/20 00:20:00 2.070 62.300 2025/10/20 00:15:00 2.069 62.100 2025/10/20 00:10:00 2.070 62.300 2025/10/20 00:05:00 2.069 62.100 2025/10/20 00:00:00 2.071 62.400 2025/10/19 23:55:00 2.070 62.300 2025/10/19 23:50:00 2.069 62.100 2025/10/19 23:45:00 2.071 62.400 2025/10/19 23:40:00 2.070 62.300 2025/10/19 23:35:00 2.070 62.300 2025/10/19 23:30:00 2.070 62.300 2025/10/19 23:25:00 2.070 62.300 2025/10/19 23:20:00 2.071 62.400 2025/10/19 23:15:00 2.070 62.300 2025/10/19 23:10:00 2.070 62.300 2025/10/19 23:05:00 2.070 62.300 2025/10/19 23:00:00 2.070 62.300 2025/10/19 22:55:00 2.070 62.300 2025/10/19 22:50:00 2.070 62.300 2025/10/19 22:45:00 2.070 62.300 2025/10/19 22:40:00 2.070 62.300 2025/10/19 22:35:00 2.070 62.300 2025/10/19 22:30:00 2.071 62.400 2025/10/19 22:25:00 2.071 62.400 2025/10/19 22:20:00 2.070 62.300 2025/10/19 22:15:00 2.070 62.300 2025/10/19 22:10:00 2.070 62.300 2025/10/19 22:05:00 2.070 62.300 2025/10/19 22:00:00 2.070 62.300 2025/10/19 21:55:00 2.071 62.400 2025/10/19 21:50:00 2.070 62.300 2025/10/19 21:45:00 2.070 62.300 2025/10/19 21:40:00 2.071 62.400 2025/10/19 21:35:00 2.070 62.300 2025/10/19 21:30:00 2.071 62.400 2025/10/19 21:25:00 2.070 62.300 2025/10/19 21:20:00 2.071 62.400 2025/10/19 21:15:00 2.071 62.400 2025/10/19 21:10:00 2.072 62.600 2025/10/19 21:05:00 2.070 62.300 2025/10/19 21:00:00 2.071 62.400 2025/10/19 20:55:00 2.070 62.300 2025/10/19 20:50:00 2.071 62.400 2025/10/19 20:45:00 2.070 62.300 2025/10/19 20:40:00 2.071 62.400 2025/10/19 20:35:00 2.071 62.400 2025/10/19 20:30:00 2.070 62.300 2025/10/19 20:25:00 2.072 62.600 2025/10/19 20:20:00 2.070 62.300 2025/10/19 20:15:00 2.071 62.400 2025/10/19 20:10:00 2.072 62.600 2025/10/19 20:05:00 2.071 62.400 2025/10/19 20:00:00 2.071 62.400 2025/10/19 19:55:00 2.072 62.600 2025/10/19 19:50:00 2.071 62.400 2025/10/19 19:45:00 2.071 62.400 2025/10/19 19:40:00 2.071 62.400 2025/10/19 19:35:00 2.071 62.400 2025/10/19 19:30:00 2.071 62.400 2025/10/19 19:25:00 2.071 62.400 2025/10/19 19:20:00 2.071 62.400 2025/10/19 19:15:00 2.072 62.600 2025/10/19 19:10:00 2.071 62.400 2025/10/19 19:05:00 2.071 62.400 2025/10/19 19:00:00 2.071 62.400 2025/10/19 18:55:00 2.071 62.400 2025/10/19 18:50:00 2.072 62.600 2025/10/19 18:45:00 2.072 62.600 2025/10/19 18:40:00 2.071 62.400 2025/10/19 18:35:00 2.072 62.600 2025/10/19 18:30:00 2.072 62.600 2025/10/19 18:25:00 2.072 62.600 2025/10/19 18:20:00 2.072 62.600 2025/10/19 18:15:00 2.073 62.700 2025/10/19 18:10:00 2.073 62.700 2025/10/19 18:05:00 2.072 62.600 2025/10/19 18:00:00 2.072 62.600 2025/10/19 17:55:00 2.072 62.600 2025/10/19 17:50:00 2.072 62.600 2025/10/19 17:45:00 2.073 62.700 2025/10/19 17:40:00 2.072 62.600 2025/10/19 17:35:00 2.072 62.600 2025/10/19 17:30:00 2.072 62.600 2025/10/19 17:25:00 2.072 62.600 2025/10/19 17:20:00 2.073 62.700 2025/10/19 17:15:00 2.072 62.600 2025/10/19 17:10:00 2.072 62.600 2025/10/19 17:05:00 2.073 62.700 2025/10/19 17:00:00 2.072 62.600 2025/10/19 16:55:00 2.073 62.700 2025/10/19 16:50:00 2.073 62.700 2025/10/19 16:45:00 2.072 62.600 2025/10/19 16:40:00 2.073 62.700 2025/10/19 16:35:00 2.073 62.700 2025/10/19 16:30:00 2.071 62.400 2025/10/19 16:25:00 2.072 62.600 2025/10/19 16:20:00 2.072 62.600 2025/10/19 16:15:00 2.073 62.700 2025/10/19 16:10:00 2.073 62.700 2025/10/19 16:05:00 2.072 62.600 2025/10/19 16:00:00 2.072 62.600 2025/10/19 15:55:00 2.073 62.700 2025/10/19 15:50:00 2.073 62.700 2025/10/19 15:45:00 2.073 62.700 2025/10/19 15:40:00 2.072 62.600 2025/10/19 15:35:00 2.072 62.600 2025/10/19 15:30:00 2.073 62.700 2025/10/19 15:25:00 2.073 62.700 2025/10/19 15:20:00 2.072 62.600 2025/10/19 15:15:00 2.073 62.700 2025/10/19 15:10:00 2.073 62.700 2025/10/19 15:05:00 2.073 62.700 2025/10/19 15:00:00 2.073 62.700 2025/10/19 14:55:00 2.073 62.700 2025/10/19 14:50:00 2.073 62.700 2025/10/19 14:45:00 2.073 62.700 2025/10/19 14:40:00 2.073 62.700 2025/10/19 14:35:00 2.073 62.700 2025/10/19 14:30:00 2.073 62.700 2025/10/19 14:25:00 2.073 62.700 2025/10/19 14:20:00 2.074 62.900 2025/10/19 14:15:00 2.073 62.700 2025/10/19 14:10:00 2.073 62.700 2025/10/19 14:05:00 2.073 62.700 2025/10/19 14:00:00 2.072 62.600 2025/10/19 13:55:00 2.073 62.700 2025/10/19 13:50:00 2.073 62.700 2025/10/19 13:45:00 2.073 62.700 2025/10/19 13:40:00 2.073 62.700 2025/10/19 13:35:00 2.073 62.700 2025/10/19 13:30:00 2.073 62.700 2025/10/19 13:25:00 2.073 62.700 2025/10/19 13:20:00 2.074 62.900 2025/10/19 13:15:00 2.074 62.900 2025/10/19 13:10:00 2.074 62.900 2025/10/19 13:05:00 2.073 62.700 2025/10/19 13:00:00 2.073 62.700 2025/10/19 12:55:00 2.074 62.900 2025/10/19 12:50:00 2.073 62.700 2025/10/19 12:45:00 2.074 62.900 2025/10/19 12:40:00 2.072 62.600 2025/10/19 12:35:00 2.072 62.600 2025/10/19 12:30:00 2.074 62.900 2025/10/19 12:25:00 2.074 62.900 2025/10/19 12:20:00 2.075 63.000 2025/10/19 12:15:00 2.073 62.700 2025/10/19 12:10:00 2.073 62.700 2025/10/19 12:05:00 2.074 62.900 2025/10/19 12:00:00 2.074 62.900 2025/10/19 11:55:00 2.073 62.700 2025/10/19 11:50:00 2.073 62.700 2025/10/19 11:45:00 2.073 62.700 2025/10/19 11:40:00 2.074 62.900 2025/10/19 11:35:00 2.073 62.700 2025/10/19 11:30:00 2.073 62.700 2025/10/19 11:25:00 2.074 62.900 2025/10/19 11:20:00 2.074 62.900 2025/10/19 11:15:00 2.073 62.700 2025/10/19 11:10:00 2.074 62.900 2025/10/19 11:05:00 2.074 62.900 2025/10/19 11:00:00 2.075 63.000 2025/10/19 10:55:00 2.075 63.000 2025/10/19 10:50:00 2.074 62.900 2025/10/19 10:45:00 2.074 62.900 2025/10/19 10:40:00 2.074 62.900 2025/10/19 10:35:00 2.074 62.900 2025/10/19 10:30:00 2.074 62.900 2025/10/19 10:25:00 2.074 62.900 2025/10/19 10:20:00 2.074 62.900 2025/10/19 10:15:00 2.074 62.900 2025/10/19 10:10:00 2.075 63.000 2025/10/19 10:05:00 2.075 63.000 2025/10/19 10:00:00 2.075 63.000 2025/10/19 09:55:00 2.074 62.900 2025/10/19 09:50:00 2.075 63.000 2025/10/19 09:45:00 2.074 62.900 2025/10/19 09:40:00 2.075 63.000 2025/10/19 09:35:00 2.075 63.000 2025/10/19 09:30:00 2.074 62.900 2025/10/19 09:25:00 2.075 63.000 2025/10/19 09:20:00 2.074 62.900 2025/10/19 09:15:00 2.074 62.900 2025/10/19 09:10:00 2.075 63.000 2025/10/19 09:05:00 2.074 62.900 2025/10/19 09:00:00 2.075 63.000 2025/10/19 08:55:00 2.075 63.000 2025/10/19 08:50:00 2.075 63.000 2025/10/19 08:45:00 2.075 63.000 2025/10/19 08:40:00 2.075 63.000 2025/10/19 08:35:00 2.075 63.000 2025/10/19 08:30:00 2.073 62.700 2025/10/19 08:25:00 2.074 62.900 2025/10/19 08:20:00 2.074 62.900 2025/10/19 08:15:00 2.075 63.000 2025/10/19 08:10:00 2.075 63.000 2025/10/19 08:05:00 2.075 63.000 2025/10/19 08:00:00 2.075 63.000 2025/10/19 07:55:00 2.075 63.000 2025/10/19 07:50:00 2.075 63.000 2025/10/19 07:45:00 2.074 62.900 2025/10/19 07:40:00 2.076 63.200 2025/10/19 07:35:00 2.074 62.900 2025/10/19 07:30:00 2.075 63.000 2025/10/19 07:25:00 2.076 63.200 2025/10/19 07:20:00 2.075 63.000 2025/10/19 07:15:00 2.075 63.000 2025/10/19 07:10:00 2.075 63.000 2025/10/19 07:05:00 2.075 63.000 2025/10/19 07:00:00 2.076 63.200 2025/10/19 06:55:00 2.075 63.000 2025/10/19 06:50:00 2.075 63.000 2025/10/19 06:45:00 2.075 63.000 2025/10/19 06:40:00 2.075 63.000 2025/10/19 06:35:00 2.075 63.000 2025/10/19 06:30:00 2.075 63.000 2025/10/19 06:25:00 2.075 63.000 2025/10/19 06:20:00 2.075 63.000 2025/10/19 06:15:00 2.076 63.200 2025/10/19 06:10:00 2.076 63.200 2025/10/19 06:05:00 2.076 63.200 2025/10/19 06:00:00 2.076 63.200 2025/10/19 05:55:00 2.076 63.200 2025/10/19 05:50:00 2.076 63.200 2025/10/19 05:45:00 2.076 63.200 2025/10/19 05:40:00 2.075 63.000 2025/10/19 05:35:00 2.075 63.000 2025/10/19 05:30:00 2.076 63.200 2025/10/19 05:25:00 2.076 63.200 2025/10/19 05:20:00 2.077 63.300 2025/10/19 05:15:00 2.075 63.000 2025/10/19 05:10:00 2.076 63.200 2025/10/19 05:05:00 2.077 63.300 2025/10/19 05:00:00 2.076 63.200 2025/10/19 04:55:00 2.077 63.300 2025/10/19 04:50:00 2.076 63.200 2025/10/19 04:45:00 2.076 63.200 2025/10/19 04:40:00 2.077 63.300 2025/10/19 04:35:00 2.076 63.200 2025/10/19 04:30:00 2.077 63.300 2025/10/19 04:25:00 2.077 63.300 2025/10/19 04:20:00 2.077 63.300 2025/10/19 04:15:00 2.076 63.200 2025/10/19 04:10:00 2.077 63.300 2025/10/19 04:05:00 2.076 63.200 2025/10/19 04:00:00 2.078 63.500 2025/10/19 03:55:00 2.078 63.500 2025/10/19 03:50:00 2.077 63.300 2025/10/19 03:45:00 2.077 63.300 2025/10/19 03:40:00 2.076 63.200 2025/10/19 03:35:00 2.076 63.200 2025/10/19 03:30:00 2.076 63.200 2025/10/19 03:25:00 2.076 63.200 2025/10/19 03:20:00 2.077 63.300 2025/10/19 03:15:00 2.077 63.300 2025/10/19 03:10:00 2.077 63.300 2025/10/19 03:05:00 2.076 63.200 2025/10/19 03:00:00 2.077 63.300 2025/10/19 02:55:00 2.076 63.200 2025/10/19 02:50:00 2.077 63.300 2025/10/19 02:45:00 2.077 63.300 2025/10/19 02:40:00 2.077 63.300 2025/10/19 02:35:00 2.077 63.300 2025/10/19 02:30:00 2.078 63.500 2025/10/19 02:25:00 2.077 63.300 2025/10/19 02:20:00 2.077 63.300 2025/10/19 02:15:00 2.077 63.300 2025/10/19 02:10:00 2.077 63.300 2025/10/19 02:05:00 2.078 63.500 2025/10/19 02:00:00 2.077 63.300 2025/10/19 01:55:00 2.077 63.300 2025/10/19 01:50:00 2.078 63.500 2025/10/19 01:45:00 2.078 63.500 2025/10/19 01:40:00 2.077 63.300 2025/10/19 01:35:00 2.078 63.500 2025/10/19 01:30:00 2.077 63.300 2025/10/19 01:25:00 2.077 63.300 2025/10/19 01:20:00 2.077 63.300 2025/10/19 01:15:00 2.077 63.300 2025/10/19 01:10:00 2.077 63.300 2025/10/19 01:05:00 2.077 63.300 2025/10/19 01:00:00 2.076 63.200 2025/10/19 00:55:00 2.077 63.300 2025/10/19 00:50:00 2.077 63.300 2025/10/19 00:45:00 2.078 63.500 2025/10/19 00:40:00 2.077 63.300 2025/10/19 00:35:00 2.078 63.500 2025/10/19 00:30:00 2.078 63.500 2025/10/19 00:25:00 2.077 63.300 2025/10/19 00:20:00 2.078 63.500 2025/10/19 00:15:00 2.077 63.300 2025/10/19 00:10:00 2.077 63.300 2025/10/19 00:05:00 2.078 63.500 2025/10/19 00:00:00 2.078 63.500 2025/10/18 23:55:00 2.079 63.600 2025/10/18 23:50:00 2.079 63.600 2025/10/18 23:45:00 2.078 63.500 2025/10/18 23:40:00 2.078 63.500 2025/10/18 23:35:00 2.078 63.500 2025/10/18 23:30:00 2.077 63.300 2025/10/18 23:25:00 2.077 63.300 2025/10/18 23:20:00 2.078 63.500 2025/10/18 23:15:00 2.078 63.500 2025/10/18 23:10:00 2.077 63.300 2025/10/18 23:05:00 2.078 63.500 2025/10/18 23:00:00 2.078 63.500 2025/10/18 22:55:00 2.077 63.300 2025/10/18 22:50:00 2.078 63.500 2025/10/18 22:45:00 2.078 63.500 2025/10/18 22:40:00 2.078 63.500 2025/10/18 22:35:00 2.078 63.500 2025/10/18 22:30:00 2.077 63.300 2025/10/18 22:25:00 2.078 63.500 2025/10/18 22:20:00 2.079 63.600 2025/10/18 22:15:00 2.078 63.500 2025/10/18 22:10:00 2.079 63.600 2025/10/18 22:05:00 2.079 63.600 2025/10/18 22:00:00 2.078 63.500 2025/10/18 21:55:00 2.078 63.500 2025/10/18 21:50:00 2.079 63.600 2025/10/18 21:45:00 2.078 63.500 2025/10/18 21:40:00 2.078 63.500 2025/10/18 21:35:00 2.078 63.500 2025/10/18 21:30:00 2.078 63.500 2025/10/18 21:25:00 2.079 63.600 2025/10/18 21:20:00 2.078 63.500 2025/10/18 21:15:00 2.079 63.600 2025/10/18 21:10:00 2.079 63.600 2025/10/18 21:05:00 2.078 63.500 2025/10/18 21:00:00 2.077 63.300 2025/10/18 20:55:00 2.078 63.500 2025/10/18 20:50:00 2.079 63.600 2025/10/18 20:45:00 2.079 63.600 2025/10/18 20:40:00 2.078 63.500 2025/10/18 20:35:00 2.079 63.600 2025/10/18 20:30:00 2.079 63.600 2025/10/18 20:25:00 2.078 63.500 2025/10/18 20:20:00 2.078 63.500 2025/10/18 20:15:00 2.078 63.500 2025/10/18 20:10:00 2.078 63.500 2025/10/18 20:05:00 2.079 63.600 2025/10/18 20:00:00 2.080 63.800 2025/10/18 19:55:00 2.079 63.600 2025/10/18 19:50:00 2.080 63.800 2025/10/18 19:45:00 2.079 63.600 2025/10/18 19:40:00 2.079 63.600 2025/10/18 19:35:00 2.078 63.500 2025/10/18 19:30:00 2.079 63.600 2025/10/18 19:25:00 2.078 63.500 2025/10/18 19:20:00 2.078 63.500 2025/10/18 19:15:00 2.079 63.600 2025/10/18 19:10:00 2.079 63.600 2025/10/18 19:05:00 2.078 63.500 2025/10/18 19:00:00 2.079 63.600 2025/10/18 18:55:00 2.079 63.600 2025/10/18 18:50:00 2.079 63.600 2025/10/18 18:45:00 2.079 63.600 2025/10/18 18:40:00 2.079 63.600 2025/10/18 18:35:00 2.079 63.600 2025/10/18 18:30:00 2.079 63.600 2025/10/18 18:25:00 2.079 63.600 2025/10/18 18:20:00 2.080 63.800 2025/10/18 18:15:00 2.079 63.600 2025/10/18 18:10:00 2.079 63.600 2025/10/18 18:05:00 2.081 64.000 2025/10/18 18:00:00 2.080 63.800 2025/10/18 17:55:00 2.080 63.800 2025/10/18 17:50:00 2.080 63.800 2025/10/18 17:45:00 2.080 63.800 2025/10/18 17:40:00 2.081 64.000 2025/10/18 17:35:00 2.080 63.800 2025/10/18 17:30:00 2.081 64.000 2025/10/18 17:25:00 2.079 63.600 2025/10/18 17:20:00 2.080 63.800 2025/10/18 17:15:00 2.080 63.800 2025/10/18 17:10:00 2.080 63.800 2025/10/18 17:05:00 2.080 63.800 2025/10/18 17:00:00 2.080 63.800 2025/10/18 16:55:00 2.081 64.000 2025/10/18 16:50:00 2.080 63.800 2025/10/18 16:45:00 2.081 64.000 2025/10/18 16:40:00 2.081 64.000 2025/10/18 16:35:00 2.081 64.000 2025/10/18 16:30:00 2.081 64.000 2025/10/18 16:25:00 2.082 64.100 2025/10/18 16:20:00 2.081 64.000 2025/10/18 16:15:00 2.081 64.000 2025/10/18 16:10:00 2.081 64.000 2025/10/18 16:05:00 2.081 64.000 2025/10/18 16:00:00 2.081 64.000 2025/10/18 15:55:00 2.081 64.000 2025/10/18 15:50:00 2.081 64.000 2025/10/18 15:45:00 2.081 64.000 2025/10/18 15:40:00 2.081 64.000 2025/10/18 15:35:00 2.081 64.000 2025/10/18 15:30:00 2.081 64.000 2025/10/18 15:25:00 2.080 63.800 2025/10/18 15:20:00 2.080 63.800 2025/10/18 15:15:00 2.080 63.800 2025/10/18 15:10:00 2.080 63.800 2025/10/18 15:05:00 2.080 63.800 2025/10/18 15:00:00 2.080 63.800 2025/10/18 14:55:00 2.078 63.500 2025/10/18 14:50:00 2.080 63.800 2025/10/18 14:45:00 2.080 63.800 2025/10/18 14:40:00 2.079 63.600 2025/10/18 14:35:00 2.080 63.800 2025/10/18 14:30:00 2.080 63.800 2025/10/18 14:25:00 2.080 63.800 2025/10/18 14:20:00 2.079 63.600 2025/10/18 14:15:00 2.080 63.800 2025/10/18 14:10:00 2.080 63.800 2025/10/18 14:05:00 2.080 63.800 2025/10/18 14:00:00 2.080 63.800 2025/10/18 13:55:00 2.080 63.800 2025/10/18 13:50:00 2.080 63.800 2025/10/18 13:45:00 2.080 63.800 2025/10/18 13:40:00 2.079 63.600 2025/10/18 13:35:00 2.079 63.600 2025/10/18 13:30:00 2.079 63.600 2025/10/18 13:25:00 2.080 63.800 2025/10/18 13:20:00 2.080 63.800 2025/10/18 13:15:00 2.080 63.800 2025/10/18 13:10:00 2.080 63.800 2025/10/18 13:05:00 2.080 63.800 2025/10/18 13:00:00 2.080 63.800 2025/10/18 12:55:00 2.080 63.800 2025/10/18 12:50:00 2.080 63.800 2025/10/18 12:45:00 2.079 63.600 2025/10/18 12:40:00 2.080 63.800 2025/10/18 12:35:00 2.081 64.000 2025/10/18 12:30:00 2.081 64.000 2025/10/18 12:25:00 2.080 63.800 2025/10/18 12:20:00 2.080 63.800 2025/10/18 12:15:00 2.081 64.000 2025/10/18 12:10:00 2.080 63.800 2025/10/18 12:05:00 2.080 63.800 2025/10/18 12:00:00 2.080 63.800 2025/10/18 11:55:00 2.080 63.800 2025/10/18 11:50:00 2.080 63.800 2025/10/18 11:45:00 2.080 63.800 2025/10/18 11:40:00 2.080 63.800 2025/10/18 11:35:00 2.080 63.800 2025/10/18 11:30:00 2.080 63.800 2025/10/18 11:25:00 2.081 64.000 2025/10/18 11:20:00 2.081 64.000 2025/10/18 11:15:00 2.080 63.800 2025/10/18 11:10:00 2.080 63.800 2025/10/18 11:05:00 2.080 63.800 2025/10/18 11:00:00 2.082 64.100 2025/10/18 10:55:00 2.082 64.100 2025/10/18 10:50:00 2.081 64.000 2025/10/18 10:45:00 2.081 64.000 2025/10/18 10:40:00 2.081 64.000 2025/10/18 10:35:00 2.079 63.600 2025/10/18 10:30:00 2.080 63.800 2025/10/18 10:25:00 2.079 63.600 2025/10/18 10:20:00 2.080 63.800 2025/10/18 10:15:00 2.080 63.800 2025/10/18 10:10:00 2.081 64.000 2025/10/18 10:05:00 2.079 63.600 2025/10/18 10:00:00 2.079 63.600 2025/10/18 09:55:00 2.080 63.800 2025/10/18 09:50:00 2.080 63.800 2025/10/18 09:45:00 2.079 63.600 2025/10/18 09:40:00 2.079 63.600 2025/10/18 09:35:00 2.079 63.600 2025/10/18 09:30:00 2.080 63.800 2025/10/18 09:25:00 2.079 63.600 2025/10/18 09:20:00 2.080 63.800 2025/10/18 09:15:00 2.079 63.600 2025/10/18 09:10:00 2.079 63.600 2025/10/18 09:05:00 2.078 63.500 2025/10/18 09:00:00 2.079 63.600 2025/10/18 08:55:00 2.079 63.600 2025/10/18 08:50:00 2.079 63.600 2025/10/18 08:45:00 2.079 63.600 2025/10/18 08:40:00 2.080 63.800 2025/10/18 08:35:00 2.079 63.600 2025/10/18 08:30:00 2.079 63.600 2025/10/18 08:25:00 2.079 63.600 2025/10/18 08:20:00 2.080 63.800 2025/10/18 08:15:00 2.079 63.600 2025/10/18 08:10:00 2.079 63.600 2025/10/18 08:05:00 2.079 63.600 2025/10/18 08:00:00 2.079 63.600 2025/10/18 07:55:00 2.079 63.600 2025/10/18 07:50:00 2.079 63.600 2025/10/18 07:45:00 2.078 63.500 2025/10/18 07:40:00 2.079 63.600 2025/10/18 07:35:00 2.079 63.600 2025/10/18 07:30:00 2.079 63.600 2025/10/18 07:25:00 2.079 63.600 2025/10/18 07:20:00 2.079 63.600 2025/10/18 07:15:00 2.078 63.500 2025/10/18 07:10:00 2.078 63.500 2025/10/18 07:05:00 2.079 63.600 2025/10/18 07:00:00 2.079 63.600 2025/10/18 06:55:00 2.078 63.500 2025/10/18 06:50:00 2.078 63.500 2025/10/18 06:45:00 2.079 63.600 2025/10/18 06:40:00 2.079 63.600 2025/10/18 06:35:00 2.078 63.500 2025/10/18 06:30:00 2.079 63.600 2025/10/18 06:25:00 2.078 63.500 2025/10/18 06:20:00 2.078 63.500 2025/10/18 06:15:00 2.079 63.600 2025/10/18 06:10:00 2.078 63.500 2025/10/18 06:05:00 2.079 63.600 2025/10/18 06:00:00 2.078 63.500 2025/10/18 05:55:00 2.078 63.500 2025/10/18 05:50:00 2.079 63.600 2025/10/18 05:45:00 2.078 63.500 2025/10/18 05:40:00 2.079 63.600 2025/10/18 05:35:00 2.079 63.600 2025/10/18 05:30:00 2.079 63.600 2025/10/18 05:25:00 2.078 63.500 2025/10/18 05:20:00 2.078 63.500 2025/10/18 05:15:00 2.078 63.500 2025/10/18 05:10:00 2.079 63.600 2025/10/18 05:05:00 2.079 63.600 2025/10/18 05:00:00 2.078 63.500 2025/10/18 04:55:00 2.078 63.500 2025/10/18 04:50:00 2.079 63.600 2025/10/18 04:45:00 2.078 63.500 2025/10/18 04:40:00 2.078 63.500 2025/10/18 04:35:00 2.078 63.500 2025/10/18 04:30:00 2.078 63.500 2025/10/18 04:25:00 2.079 63.600 2025/10/18 04:20:00 2.078 63.500 2025/10/18 04:15:00 2.078 63.500 2025/10/18 04:10:00 2.078 63.500 2025/10/18 04:05:00 2.077 63.300 2025/10/18 04:00:00 2.078 63.500 2025/10/18 03:55:00 2.078 63.500 2025/10/18 03:50:00 2.078 63.500 2025/10/18 03:45:00 2.078 63.500 2025/10/18 03:40:00 2.078 63.500 2025/10/18 03:35:00 2.079 63.600 2025/10/18 03:30:00 2.079 63.600 2025/10/18 03:25:00 2.078 63.500 2025/10/18 03:20:00 2.079 63.600 2025/10/18 03:15:00 2.078 63.500 2025/10/18 03:10:00 2.078 63.500 2025/10/18 03:05:00 2.077 63.300 2025/10/18 03:00:00 2.078 63.500 2025/10/18 02:55:00 2.078 63.500 2025/10/18 02:50:00 2.078 63.500 2025/10/18 02:45:00 2.077 63.300 2025/10/18 02:40:00 2.079 63.600 2025/10/18 02:35:00 2.077 63.300 2025/10/18 02:30:00 2.078 63.500 2025/10/18 02:25:00 2.078 63.500 2025/10/18 02:20:00 2.079 63.600 2025/10/18 02:15:00 2.078 63.500 2025/10/18 02:10:00 2.078 63.500 2025/10/18 02:05:00 2.077 63.300 2025/10/18 02:00:00 2.077 63.300 2025/10/18 01:55:00 2.077 63.300 2025/10/18 01:50:00 2.075 63.000 2025/10/18 01:45:00 2.077 63.300 2025/10/18 01:40:00 2.078 63.500 2025/10/18 01:35:00 2.078 63.500 2025/10/18 01:30:00 2.077 63.300 2025/10/18 01:25:00 2.079 63.600 2025/10/18 01:20:00 2.078 63.500 2025/10/18 01:15:00 2.077 63.300 2025/10/18 01:10:00 2.079 63.600 2025/10/18 01:05:00 2.077 63.300 2025/10/18 01:00:00 2.078 63.500 2025/10/18 00:55:00 2.077 63.300 2025/10/18 00:50:00 2.077 63.300 2025/10/18 00:45:00 2.077 63.300 2025/10/18 00:40:00 2.077 63.300 2025/10/18 00:35:00 2.077 63.300 2025/10/18 00:30:00 2.077 63.300 2025/10/18 00:25:00 2.077 63.300 2025/10/18 00:20:00 2.078 63.500 2025/10/18 00:15:00 2.077 63.300 2025/10/18 00:10:00 2.078 63.500 2025/10/18 00:05:00 2.077 63.300 2025/10/18 00:00:00 2.078 63.500 2025/10/17 23:55:00 2.076 63.200 2025/10/17 23:50:00 2.078 63.500 2025/10/17 23:45:00 2.078 63.500 2025/10/17 23:40:00 2.077 63.300 2025/10/17 23:35:00 2.077 63.300 2025/10/17 23:30:00 2.077 63.300 2025/10/17 23:25:00 2.078 63.500 2025/10/17 23:20:00 2.077 63.300 2025/10/17 23:15:00 2.077 63.300 2025/10/17 23:10:00 2.076 63.200 2025/10/17 23:05:00 2.077 63.300 2025/10/17 23:00:00 2.076 63.200 2025/10/17 22:55:00 2.077 63.300 2025/10/17 22:50:00 2.077 63.300 2025/10/17 22:45:00 2.077 63.300 2025/10/17 22:40:00 2.076 63.200 2025/10/17 22:35:00 2.077 63.300 2025/10/17 22:30:00 2.075 63.000 2025/10/17 22:25:00 2.075 63.000 2025/10/17 22:20:00 2.076 63.200 2025/10/17 22:15:00 2.077 63.300 2025/10/17 22:10:00 2.078 63.500 2025/10/17 22:05:00 2.078 63.500 2025/10/17 22:00:00 2.077 63.300 2025/10/17 21:55:00 2.076 63.200 2025/10/17 21:50:00 2.077 63.300 2025/10/17 21:45:00 2.077 63.300 2025/10/17 21:40:00 2.078 63.500 2025/10/17 21:35:00 2.077 63.300 2025/10/17 21:30:00 2.078 63.500 2025/10/17 21:25:00 2.077 63.300 2025/10/17 21:20:00 2.078 63.500 2025/10/17 21:15:00 2.077 63.300 2025/10/17 21:10:00 2.078 63.500 2025/10/17 21:05:00 2.078 63.500 2025/10/17 21:00:00 2.078 63.500 2025/10/17 20:55:00 2.077 63.300 2025/10/17 20:50:00 2.077 63.300 2025/10/17 20:45:00 2.077 63.300 2025/10/17 20:40:00 2.077 63.300 2025/10/17 20:35:00 2.077 63.300 2025/10/17 20:30:00 2.078 63.500 2025/10/17 20:25:00 2.077 63.300 2025/10/17 20:20:00 2.078 63.500 2025/10/17 20:15:00 2.078 63.500 2025/10/17 20:10:00 2.078 63.500 2025/10/17 20:05:00 2.078 63.500 2025/10/17 20:00:00 2.077 63.300 2025/10/17 19:55:00 2.078 63.500 2025/10/17 19:50:00 2.077 63.300 2025/10/17 19:45:00 2.077 63.300 2025/10/17 19:40:00 2.076 63.200 2025/10/17 19:35:00 2.077 63.300 2025/10/17 19:30:00 2.077 63.300 2025/10/17 19:25:00 2.076 63.200 2025/10/17 19:20:00 2.078 63.500 2025/10/17 19:15:00 2.077 63.300 2025/10/17 19:10:00 2.077 63.300 2025/10/17 19:05:00 2.078 63.500 2025/10/17 19:00:00 2.078 63.500 2025/10/17 18:55:00 2.079 63.600 2025/10/17 18:50:00 2.079 63.600 2025/10/17 18:45:00 2.078 63.500 2025/10/17 18:40:00 2.078 63.500 2025/10/17 18:35:00 2.078 63.500 2025/10/17 18:30:00 2.078 63.500 2025/10/17 18:25:00 2.079 63.600 2025/10/17 18:20:00 2.079 63.600 2025/10/17 18:15:00 2.079 63.600 2025/10/17 18:10:00 2.079 63.600 2025/10/17 18:05:00 2.081 64.000 2025/10/17 18:00:00 2.080 63.800 2025/10/17 17:55:00 2.079 63.600 2025/10/17 17:50:00 2.079 63.600 2025/10/17 17:45:00 2.080 63.800 2025/10/17 17:40:00 2.079 63.600 2025/10/17 17:35:00 2.079 63.600 2025/10/17 17:30:00 2.079 63.600 2025/10/17 17:25:00 2.080 63.800 2025/10/17 17:20:00 2.079 63.600 2025/10/17 17:15:00 2.079 63.600 2025/10/17 17:10:00 2.079 63.600 2025/10/17 17:05:00 2.079 63.600 2025/10/17 17:00:00 2.078 63.500 2025/10/17 16:55:00 2.078 63.500 2025/10/17 16:50:00 2.079 63.600 2025/10/17 16:45:00 2.078 63.500 2025/10/17 16:40:00 2.078 63.500 2025/10/17 16:35:00 2.078 63.500 2025/10/17 16:30:00 2.079 63.600 2025/10/17 16:25:00 2.079 63.600 2025/10/17 16:20:00 2.078 63.500 2025/10/17 16:15:00 2.080 63.800 2025/10/17 16:10:00 2.078 63.500 2025/10/17 16:05:00 2.080 63.800 2025/10/17 16:00:00 2.080 63.800 2025/10/17 15:55:00 2.078 63.500 2025/10/17 15:50:00 2.078 63.500 2025/10/17 15:45:00 2.079 63.600 2025/10/17 15:40:00 2.080 63.800 2025/10/17 15:35:00 2.079 63.600 2025/10/17 15:30:00 2.078 63.500 2025/10/17 15:25:00 2.079 63.600 2025/10/17 15:20:00 2.077 63.300 2025/10/17 15:15:00 2.079 63.600 2025/10/17 15:10:00 2.079 63.600 2025/10/17 15:05:00 2.079 63.600 2025/10/17 15:00:00 2.078 63.500 2025/10/17 14:55:00 2.078 63.500 2025/10/17 14:50:00 2.077 63.300 2025/10/17 14:45:00 2.077 63.300 2025/10/17 14:40:00 2.079 63.600 2025/10/17 14:35:00 2.078 63.500 2025/10/17 14:30:00 2.078 63.500 2025/10/17 14:25:00 2.078 63.500 2025/10/17 14:20:00 2.077 63.300 2025/10/17 14:15:00 2.077 63.300 2025/10/17 14:10:00 2.076 63.200 2025/10/17 14:05:00 2.078 63.500 2025/10/17 14:00:00 2.077 63.300 2025/10/17 13:55:00 2.078 63.500 2025/10/17 13:50:00 2.078 63.500 2025/10/17 13:45:00 2.077 63.300 2025/10/17 13:40:00 2.076 63.200 2025/10/17 13:35:00 2.077 63.300 2025/10/17 13:30:00 2.077 63.300 2025/10/17 13:25:00 2.077 63.300 2025/10/17 13:20:00 2.078 63.500 2025/10/17 13:15:00 2.077 63.300 2025/10/17 13:10:00 2.077 63.300 2025/10/17 13:05:00 2.076 63.200 2025/10/17 13:00:00 2.077 63.300 2025/10/17 12:55:00 2.078 63.500 2025/10/17 12:50:00 2.077 63.300 2025/10/17 12:45:00 2.076 63.200 2025/10/17 12:40:00 2.076 63.200 2025/10/17 12:35:00 2.077 63.300 2025/10/17 12:30:00 2.077 63.300 2025/10/17 12:25:00 2.077 63.300 2025/10/17 12:20:00 2.077 63.300 2025/10/17 12:15:00 2.077 63.300 2025/10/17 12:10:00 2.077 63.300 2025/10/17 12:05:00 2.077 63.300 2025/10/17 12:00:00 2.076 63.200 2025/10/17 11:55:00 2.076 63.200 2025/10/17 11:50:00 2.076 63.200 2025/10/17 11:45:00 2.077 63.300 2025/10/17 11:40:00 2.076 63.200 2025/10/17 11:35:00 2.076 63.200 2025/10/17 11:30:00 2.076 63.200 2025/10/17 11:25:00 2.076 63.200 2025/10/17 11:20:00 2.078 63.500 2025/10/17 11:15:00 2.077 63.300 2025/10/17 11:10:00 2.077 63.300 2025/10/17 11:05:00 2.077 63.300 2025/10/17 11:00:00 2.077 63.300 2025/10/17 10:55:00 2.077 63.300 2025/10/17 10:50:00 2.077 63.300 2025/10/17 10:45:00 2.076 63.200 2025/10/17 10:40:00 2.076 63.200 2025/10/17 10:35:00 2.077 63.300 2025/10/17 10:30:00 2.077 63.300 2025/10/17 10:25:00 2.078 63.500 2025/10/17 10:20:00 2.077 63.300 2025/10/17 10:15:00 2.077 63.300 2025/10/17 10:10:00 2.077 63.300 2025/10/17 10:05:00 2.078 63.500 2025/10/17 10:00:00 2.078 63.500 2025/10/17 09:55:00 2.077 63.300 2025/10/17 09:50:00 2.078 63.500 2025/10/17 09:45:00 2.078 63.500 2025/10/17 09:40:00 2.078 63.500 2025/10/17 09:35:00 2.078 63.500 2025/10/17 09:30:00 2.078 63.500 2025/10/17 09:25:00 2.078 63.500 2025/10/17 09:20:00 2.078 63.500 2025/10/17 09:15:00 2.077 63.300 2025/10/17 09:10:00 2.077 63.300 2025/10/17 09:05:00 2.077 63.300 2025/10/17 09:00:00 2.077 63.300 2025/10/17 08:55:00 2.078 63.500 2025/10/17 08:50:00 2.077 63.300 2025/10/17 08:45:00 2.077 63.300 2025/10/17 08:40:00 2.077 63.300 2025/10/17 08:35:00 2.078 63.500 2025/10/17 08:30:00 2.078 63.500 2025/10/17 08:25:00 2.078 63.500 2025/10/17 08:20:00 2.077 63.300 2025/10/17 08:15:00 2.076 63.200 2025/10/17 08:10:00 2.078 63.500 2025/10/17 08:05:00 2.079 63.600 2025/10/17 08:00:00 2.078 63.500 2025/10/17 07:55:00 2.077 63.300 2025/10/17 07:50:00 2.078 63.500 2025/10/17 07:45:00 2.078 63.500 2025/10/17 07:40:00 2.077 63.300 2025/10/17 07:35:00 2.077 63.300 2025/10/17 07:30:00 2.077 63.300 2025/10/17 07:25:00 2.078 63.500 2025/10/17 07:20:00 2.078 63.500 2025/10/17 07:15:00 2.077 63.300 2025/10/17 07:10:00 2.077 63.300 2025/10/17 07:05:00 2.077 63.300 2025/10/17 07:00:00 2.078 63.500 2025/10/17 06:55:00 2.078 63.500 2025/10/17 06:50:00 2.078 63.500 2025/10/17 06:45:00 2.077 63.300 2025/10/17 06:40:00 2.076 63.200 2025/10/17 06:35:00 2.077 63.300 2025/10/17 06:30:00 2.078 63.500 2025/10/17 06:25:00 2.079 63.600 2025/10/17 06:20:00 2.077 63.300 2025/10/17 06:15:00 2.078 63.500 2025/10/17 06:10:00 2.077 63.300 2025/10/17 06:05:00 2.078 63.500 2025/10/17 06:00:00 2.078 63.500 2025/10/17 05:55:00 2.078 63.500 2025/10/17 05:50:00 2.078 63.500 2025/10/17 05:45:00 2.078 63.500 2025/10/17 05:40:00 2.077 63.300 2025/10/17 05:35:00 2.078 63.500 2025/10/17 05:30:00 2.078 63.500 2025/10/17 05:25:00 2.077 63.300 2025/10/17 05:20:00 2.077 63.300 2025/10/17 05:15:00 2.076 63.200 2025/10/17 05:10:00 2.076 63.200 2025/10/17 05:05:00 2.077 63.300 2025/10/17 05:00:00 2.077 63.300 2025/10/17 04:55:00 2.078 63.500 2025/10/17 04:50:00 2.078 63.500 2025/10/17 04:45:00 2.077 63.300 2025/10/17 04:40:00 2.077 63.300 2025/10/17 04:35:00 2.076 63.200 2025/10/17 04:30:00 2.077 63.300 2025/10/17 04:25:00 2.077 63.300 2025/10/17 04:20:00 2.078 63.500 2025/10/17 04:15:00 2.077 63.300 2025/10/17 04:10:00 2.077 63.300 2025/10/17 04:05:00 2.077 63.300 2025/10/17 04:00:00 2.077 63.300 2025/10/17 03:55:00 2.077 63.300 2025/10/17 03:50:00 2.077 63.300 2025/10/17 03:45:00 2.077 63.300 2025/10/17 03:40:00 2.078 63.500 2025/10/17 03:35:00 2.078 63.500 2025/10/17 03:30:00 2.077 63.300 2025/10/17 03:25:00 2.077 63.300 2025/10/17 03:20:00 2.077 63.300 2025/10/17 03:15:00 2.077 63.300 2025/10/17 03:10:00 2.078 63.500 2025/10/17 03:05:00 2.078 63.500 2025/10/17 03:00:00 2.077 63.300 2025/10/17 02:55:00 2.077 63.300 2025/10/17 02:50:00 2.077 63.300 2025/10/17 02:45:00 2.078 63.500 2025/10/17 02:40:00 2.078 63.500 2025/10/17 02:35:00 2.077 63.300 2025/10/17 02:30:00 2.076 63.200 2025/10/17 02:25:00 2.077 63.300 2025/10/17 02:20:00 2.077 63.300 2025/10/17 02:15:00 2.077 63.300 2025/10/17 02:10:00 2.077 63.300 2025/10/17 02:05:00 2.077 63.300 2025/10/17 02:00:00 2.077 63.300 2025/10/17 01:55:00 2.078 63.500 2025/10/17 01:50:00 2.078 63.500 2025/10/17 01:45:00 2.078 63.500 2025/10/17 01:40:00 2.078 63.500 2025/10/17 01:35:00 2.079 63.600 2025/10/17 01:30:00 2.078 63.500 2025/10/17 01:25:00 2.078 63.500 2025/10/17 01:20:00 2.079 63.600 2025/10/17 01:15:00 2.079 63.600 2025/10/17 01:10:00 2.078 63.500 2025/10/17 01:05:00 2.078 63.500 2025/10/17 01:00:00 2.079 63.600 2025/10/17 00:55:00 2.078 63.500 2025/10/17 00:50:00 2.079 63.600 2025/10/17 00:45:00 2.079 63.600 2025/10/17 00:40:00 2.078 63.500 2025/10/17 00:35:00 2.079 63.600 2025/10/17 00:30:00 2.079 63.600 2025/10/17 00:25:00 2.079 63.600 2025/10/17 00:20:00 2.079 63.600 2025/10/17 00:15:00 2.079 63.600 2025/10/17 00:10:00 2.079 63.600 2025/10/17 00:05:00 2.080 63.800 2025/10/17 00:00:00 2.079 63.600 2025/10/16 23:55:00 2.078 63.500 2025/10/16 23:50:00 2.078 63.500 2025/10/16 23:45:00 2.078 63.500 2025/10/16 23:40:00 2.079 63.600 2025/10/16 23:35:00 2.079 63.600 2025/10/16 23:30:00 2.079 63.600 2025/10/16 23:25:00 2.080 63.800 2025/10/16 23:20:00 2.080 63.800 2025/10/16 23:15:00 2.080 63.800 2025/10/16 23:10:00 2.080 63.800 2025/10/16 23:05:00 2.080 63.800 2025/10/16 23:00:00 2.080 63.800 2025/10/16 22:55:00 2.081 64.000 2025/10/16 22:50:00 2.080 63.800 2025/10/16 22:45:00 2.081 64.000 2025/10/16 22:40:00 2.081 64.000 2025/10/16 22:35:00 2.080 63.800 2025/10/16 22:30:00 2.079 63.600 2025/10/16 22:25:00 2.080 63.800 2025/10/16 22:20:00 2.079 63.600 2025/10/16 22:15:00 2.080 63.800 2025/10/16 22:10:00 2.080 63.800 2025/10/16 22:05:00 2.079 63.600 2025/10/16 22:00:00 2.081 64.000 2025/10/16 21:55:00 2.080 63.800 2025/10/16 21:50:00 2.080 63.800 2025/10/16 21:45:00 2.080 63.800 2025/10/16 21:40:00 2.080 63.800 2025/10/16 21:35:00 2.081 64.000 2025/10/16 21:30:00 2.081 64.000 2025/10/16 21:25:00 2.081 64.000 2025/10/16 21:20:00 2.080 63.800 2025/10/16 21:15:00 2.082 64.100 2025/10/16 21:10:00 2.082 64.100 2025/10/16 21:05:00 2.082 64.100 2025/10/16 21:00:00 2.081 64.000 2025/10/16 20:55:00 2.083 64.300 2025/10/16 20:50:00 2.082 64.100 2025/10/16 20:45:00 2.082 64.100 2025/10/16 20:40:00 2.082 64.100 2025/10/16 20:35:00 2.082 64.100 2025/10/16 20:30:00 2.083 64.300 2025/10/16 20:25:00 2.084 64.400 2025/10/16 20:20:00 2.081 64.000 2025/10/16 20:15:00 2.082 64.100 2025/10/16 20:10:00 2.084 64.400 2025/10/16 20:05:00 2.083 64.300 2025/10/16 20:00:00 2.082 64.100 2025/10/16 19:55:00 2.083 64.300 2025/10/16 19:50:00 2.083 64.300 2025/10/16 19:45:00 2.083 64.300 2025/10/16 19:40:00 2.083 64.300 2025/10/16 19:35:00 2.083 64.300 2025/10/16 19:30:00 2.083 64.300 2025/10/16 19:25:00 2.082 64.100 2025/10/16 19:20:00 2.081 64.000 2025/10/16 19:15:00 2.081 64.000 2025/10/16 19:10:00 2.082 64.100 2025/10/16 19:05:00 2.081 64.000 2025/10/16 19:00:00 2.082 64.100 2025/10/16 18:55:00 2.081 64.000 2025/10/16 18:50:00 2.081 64.000 2025/10/16 18:45:00 2.080 63.800 2025/10/16 18:40:00 2.081 64.000 2025/10/16 18:35:00 2.081 64.000 2025/10/16 18:30:00 2.080 63.800 2025/10/16 18:25:00 2.081 64.000 2025/10/16 18:20:00 2.082 64.100 2025/10/16 18:15:00 2.081 64.000 2025/10/16 18:10:00 2.082 64.100 2025/10/16 18:05:00 2.081 64.000 2025/10/16 18:00:00 2.082 64.100 2025/10/16 17:55:00 2.082 64.100 2025/10/16 17:50:00 2.082 64.100 2025/10/16 17:45:00 2.082 64.100 2025/10/16 17:40:00 2.083 64.300 2025/10/16 17:35:00 2.082 64.100 2025/10/16 17:30:00 2.082 64.100 2025/10/16 17:25:00 2.083 64.300 2025/10/16 17:20:00 2.082 64.100 2025/10/16 17:15:00 2.082 64.100 2025/10/16 17:10:00 2.082 64.100 2025/10/16 17:05:00 2.084 64.400 2025/10/16 17:00:00 2.083 64.300 2025/10/16 16:55:00 2.083 64.300 2025/10/16 16:50:00 2.083 64.300 2025/10/16 16:45:00 2.084 64.400 2025/10/16 16:40:00 2.083 64.300 2025/10/16 16:35:00 2.083 64.300 2025/10/16 16:30:00 2.083 64.300 2025/10/16 16:25:00 2.084 64.400 2025/10/16 16:20:00 2.082 64.100 2025/10/16 16:15:00 2.083 64.300 2025/10/16 16:10:00 2.084 64.400 2025/10/16 16:05:00 2.083 64.300 2025/10/16 16:00:00 2.082 64.100 2025/10/16 15:55:00 2.083 64.300 2025/10/16 15:50:00 2.084 64.400 2025/10/16 15:45:00 2.084 64.400 2025/10/16 15:40:00 2.084 64.400 2025/10/16 15:35:00 2.085 64.600 2025/10/16 15:30:00 2.084 64.400 2025/10/16 15:25:00 2.084 64.400 2025/10/16 15:20:00 2.084 64.400 2025/10/16 15:15:00 2.084 64.400 2025/10/16 15:10:00 2.084 64.400 2025/10/16 15:05:00 2.084 64.400 2025/10/16 15:00:00 2.084 64.400 2025/10/16 14:55:00 2.084 64.400 2025/10/16 14:50:00 2.084 64.400 2025/10/16 14:45:00 2.082 64.100 2025/10/16 14:40:00 2.082 64.100 2025/10/16 14:35:00 2.084 64.400 2025/10/16 14:30:00 2.082 64.100 2025/10/16 14:25:00 2.083 64.300 2025/10/16 14:20:00 2.084 64.400 2025/10/16 14:15:00 2.085 64.600 2025/10/16 14:10:00 2.084 64.400 2025/10/16 14:05:00 2.083 64.300 2025/10/16 14:00:00 2.084 64.400 2025/10/16 13:55:00 2.083 64.300 2025/10/16 13:50:00 2.083 64.300 2025/10/16 13:45:00 2.083 64.300 2025/10/16 13:40:00 2.083 64.300 2025/10/16 13:35:00 2.083 64.300 2025/10/16 13:30:00 2.084 64.400 2025/10/16 13:25:00 2.083 64.300 2025/10/16 13:20:00 2.083 64.300 2025/10/16 13:15:00 2.083 64.300 2025/10/16 13:10:00 2.083 64.300 2025/10/16 13:05:00 2.083 64.300 2025/10/16 13:00:00 2.083 64.300 2025/10/16 12:55:00 2.084 64.400 2025/10/16 12:50:00 2.084 64.400 2025/10/16 12:45:00 2.084 64.400 2025/10/16 12:40:00 2.084 64.400 2025/10/16 12:35:00 2.083 64.300 2025/10/16 12:30:00 2.084 64.400 2025/10/16 12:25:00 2.084 64.400 2025/10/16 12:20:00 2.084 64.400 2025/10/16 12:15:00 2.085 64.600 2025/10/16 12:10:00 2.084 64.400 2025/10/16 12:05:00 2.084 64.400 2025/10/16 12:00:00 2.084 64.400 2025/10/16 11:55:00 2.083 64.300 2025/10/16 11:50:00 2.084 64.400 2025/10/16 11:45:00 2.083 64.300 2025/10/16 11:40:00 2.084 64.400 2025/10/16 11:35:00 2.084 64.400 2025/10/16 11:30:00 2.084 64.400 2025/10/16 11:25:00 2.084 64.400 2025/10/16 11:20:00 2.084 64.400 2025/10/16 11:15:00 2.085 64.600 2025/10/16 11:10:00 2.084 64.400 2025/10/16 11:05:00 2.084 64.400 2025/10/16 11:00:00 2.084 64.400 2025/10/16 10:55:00 2.083 64.300 2025/10/16 10:50:00 2.085 64.600 2025/10/16 10:45:00 2.085 64.600 2025/10/16 10:40:00 2.085 64.600 2025/10/16 10:35:00 2.084 64.400 2025/10/16 10:30:00 2.085 64.600 2025/10/16 10:25:00 2.085 64.600 2025/10/16 10:20:00 2.084 64.400 2025/10/16 10:15:00 2.085 64.600 2025/10/16 10:10:00 2.084 64.400 2025/10/16 10:05:00 2.085 64.600 2025/10/16 10:00:00 2.085 64.600 2025/10/16 09:55:00 2.085 64.600 2025/10/16 09:50:00 2.085 64.600 2025/10/16 09:45:00 2.085 64.600 2025/10/16 09:40:00 2.085 64.600 2025/10/16 09:35:00 2.086 64.700 2025/10/16 09:30:00 2.086 64.700 2025/10/16 09:25:00 2.086 64.700 2025/10/16 09:20:00 2.086 64.700 2025/10/16 09:15:00 2.085 64.600 2025/10/16 09:10:00 2.086 64.700 2025/10/16 09:05:00 2.086 64.700 2025/10/16 09:00:00 2.086 64.700 2025/10/16 08:55:00 2.086 64.700 2025/10/16 08:50:00 2.086 64.700 2025/10/16 08:45:00 2.086 64.700 2025/10/16 08:40:00 2.086 64.700 2025/10/16 08:35:00 2.087 64.900 2025/10/16 08:30:00 2.086 64.700 2025/10/16 08:25:00 2.086 64.700 2025/10/16 08:20:00 2.086 64.700 2025/10/16 08:15:00 2.086 64.700 2025/10/16 08:10:00 2.086 64.700 2025/10/16 08:05:00 2.086 64.700 2025/10/16 08:00:00 2.085 64.600 2025/10/16 07:55:00 2.086 64.700 2025/10/16 07:50:00 2.086 64.700 2025/10/16 07:45:00 2.086 64.700 2025/10/16 07:40:00 2.085 64.600 2025/10/16 07:35:00 2.086 64.700 2025/10/16 07:30:00 2.084 64.400 2025/10/16 07:25:00 2.086 64.700 2025/10/16 07:20:00 2.086 64.700 2025/10/16 07:15:00 2.087 64.900 2025/10/16 07:10:00 2.087 64.900 2025/10/16 07:05:00 2.088 65.000 2025/10/16 07:00:00 2.087 64.900 2025/10/16 06:55:00 2.087 64.900 2025/10/16 06:50:00 2.086 64.700 2025/10/16 06:45:00 2.088 65.000 2025/10/16 06:40:00 2.086 64.700 2025/10/16 06:35:00 2.087 64.900 2025/10/16 06:30:00 2.087 64.900 2025/10/16 06:25:00 2.085 64.600 2025/10/16 06:20:00 2.087 64.900 2025/10/16 06:15:00 2.087 64.900 2025/10/16 06:10:00 2.087 64.900 2025/10/16 06:05:00 2.087 64.900 2025/10/16 06:00:00 2.086 64.700 2025/10/16 05:55:00 2.087 64.900 2025/10/16 05:50:00 2.086 64.700 2025/10/16 05:45:00 2.086 64.700 2025/10/16 05:40:00 2.087 64.900 2025/10/16 05:35:00 2.087 64.900 2025/10/16 05:30:00 2.087 64.900 2025/10/16 05:25:00 2.087 64.900 2025/10/16 05:20:00 2.087 64.900 2025/10/16 05:15:00 2.087 64.900 2025/10/16 05:10:00 2.087 64.900 2025/10/16 05:05:00 2.088 65.000 2025/10/16 05:00:00 2.087 64.900 2025/10/16 04:55:00 2.088 65.000 2025/10/16 04:50:00 2.087 64.900 2025/10/16 04:45:00 2.087 64.900 2025/10/16 04:40:00 2.087 64.900 2025/10/16 04:35:00 2.087 64.900 2025/10/16 04:30:00 2.088 65.000 2025/10/16 04:25:00 2.087 64.900 2025/10/16 04:20:00 2.088 65.000 2025/10/16 04:15:00 2.088 65.000 2025/10/16 04:10:00 2.089 65.200 2025/10/16 04:05:00 2.088 65.000 2025/10/16 04:00:00 2.087 64.900 2025/10/16 03:55:00 2.089 65.200 2025/10/16 03:50:00 2.087 64.900 2025/10/16 03:45:00 2.089 65.200 2025/10/16 03:40:00 2.089 65.200 2025/10/16 03:35:00 2.088 65.000 2025/10/16 03:30:00 2.087 64.900 2025/10/16 03:25:00 2.089 65.200 2025/10/16 03:20:00 2.089 65.200 2025/10/16 03:15:00 2.088 65.000 2025/10/16 03:10:00 2.088 65.000 2025/10/16 03:05:00 2.088 65.000 2025/10/16 03:00:00 2.088 65.000 2025/10/16 02:55:00 2.088 65.000 2025/10/16 02:50:00 2.089 65.200 2025/10/16 02:45:00 2.088 65.000 2025/10/16 02:40:00 2.088 65.000 2025/10/16 02:35:00 2.088 65.000 2025/10/16 02:30:00 2.089 65.200 2025/10/16 02:25:00 2.090 65.400 2025/10/16 02:20:00 2.089 65.200 2025/10/16 02:15:00 2.090 65.400 2025/10/16 02:10:00 2.088 65.000 2025/10/16 02:05:00 2.088 65.000 2025/10/16 02:00:00 2.089 65.200 2025/10/16 01:55:00 2.088 65.000 2025/10/16 01:50:00 2.089 65.200 2025/10/16 01:45:00 2.090 65.400 2025/10/16 01:40:00 2.090 65.400 2025/10/16 01:35:00 2.090 65.400 2025/10/16 01:30:00 2.090 65.400 2025/10/16 01:25:00 2.090 65.400 2025/10/16 01:20:00 2.090 65.400 2025/10/16 01:15:00 2.088 65.000 2025/10/16 01:10:00 2.090 65.400 2025/10/16 01:05:00 2.090 65.400 2025/10/16 01:00:00 2.091 65.500 2025/10/16 00:55:00 2.090 65.400 2025/10/16 00:50:00 2.090 65.400 2025/10/16 00:45:00 2.091 65.500 2025/10/16 00:40:00 2.090 65.400 2025/10/16 00:35:00 2.090 65.400 2025/10/16 00:30:00 2.090 65.400 2025/10/16 00:25:00 2.091 65.500 2025/10/16 00:20:00 2.090 65.400 2025/10/16 00:15:00 2.090 65.400 2025/10/16 00:10:00 2.090 65.400 2025/10/16 00:05:00 2.090 65.400 2025/10/16 00:00:00 2.090 65.400