** BC HYDRO - GENERATION AND HYDROMETEOROLOGIC INFORMATION ** CLIMATE, SNOW AND/OR SURFACE WATER STATION: Halfway R nr Farrell Ck 2 (hff2) Note: Data are provided for information only. BC Hydro does not guarantee their accuracy. Data are based on automated readings which are from time to time inaccurate. Date Time Water level Discharge (yyyy/mm/dd) (PST) (m) (cms) 2025/04/17 20:05:00 0.098 2025/04/17 20:00:00 0.101 2025/04/17 19:55:00 0.101 2025/04/17 19:50:00 0.103 34.400 2025/04/17 19:45:00 0.099 34.000 2025/04/17 19:40:00 0.096 33.700 2025/04/17 19:35:00 0.106 34.700 2025/04/17 19:30:00 0.103 34.400 2025/04/17 19:25:00 0.101 34.200 2025/04/17 19:20:00 0.101 34.200 2025/04/17 19:15:00 0.107 34.800 2025/04/17 19:10:00 0.104 34.500 2025/04/17 19:05:00 0.107 34.800 2025/04/17 19:00:00 0.110 35.100 2025/04/17 18:55:00 0.105 34.600 2025/04/17 18:50:00 0.104 34.500 2025/04/17 18:45:00 0.107 34.800 2025/04/17 18:40:00 0.110 35.100 2025/04/17 18:35:00 0.110 35.100 2025/04/17 18:30:00 0.107 34.800 2025/04/17 18:25:00 0.110 35.100 2025/04/17 18:20:00 0.105 34.600 2025/04/17 18:15:00 0.111 35.200 2025/04/17 18:10:00 0.112 35.300 2025/04/17 18:05:00 0.108 34.900 2025/04/17 18:00:00 0.113 35.400 2025/04/17 17:55:00 0.114 35.500 2025/04/17 17:50:00 0.113 35.400 2025/04/17 17:45:00 0.113 35.400 2025/04/17 17:40:00 0.112 35.300 2025/04/17 17:35:00 0.112 35.300 2025/04/17 17:30:00 0.115 35.600 2025/04/17 17:25:00 0.113 35.400 2025/04/17 17:20:00 0.109 35.000 2025/04/17 17:15:00 0.118 35.900 2025/04/17 17:10:00 0.115 35.600 2025/04/17 17:05:00 0.118 35.900 2025/04/17 17:00:00 0.111 35.200 2025/04/17 16:55:00 0.115 35.600 2025/04/17 16:50:00 0.117 35.800 2025/04/17 16:45:00 0.114 35.500 2025/04/17 16:40:00 0.118 35.900 2025/04/17 16:35:00 0.119 36.000 2025/04/17 16:30:00 0.115 35.600 2025/04/17 16:25:00 0.121 36.200 2025/04/17 16:20:00 0.118 35.900 2025/04/17 16:15:00 0.116 35.700 2025/04/17 16:10:00 0.123 36.400 2025/04/17 16:05:00 0.116 35.700 2025/04/17 16:00:00 0.123 36.400 2025/04/17 15:55:00 0.121 36.200 2025/04/17 15:50:00 0.121 36.200 2025/04/17 15:45:00 0.117 35.800 2025/04/17 15:40:00 0.121 36.200 2025/04/17 15:35:00 0.116 35.700 2025/04/17 15:30:00 0.117 35.800 2025/04/17 15:25:00 0.122 36.300 2025/04/17 15:20:00 0.117 35.800 2025/04/17 15:15:00 0.123 36.400 2025/04/17 15:10:00 0.116 35.700 2025/04/17 15:05:00 0.117 35.800 2025/04/17 15:00:00 0.117 35.800 2025/04/17 14:55:00 0.115 35.600 2025/04/17 14:50:00 0.118 35.900 2025/04/17 14:45:00 0.119 36.000 2025/04/17 14:40:00 0.116 35.700 2025/04/17 14:35:00 0.116 35.700 2025/04/17 14:30:00 0.119 36.000 2025/04/17 14:25:00 0.113 35.400 2025/04/17 14:20:00 0.118 35.900 2025/04/17 14:15:00 0.111 35.200 2025/04/17 14:10:00 0.117 35.800 2025/04/17 14:05:00 0.116 35.700 2025/04/17 14:00:00 0.116 35.700 2025/04/17 13:55:00 0.114 35.500 2025/04/17 13:50:00 0.113 35.400 2025/04/17 13:45:00 0.116 35.700 2025/04/17 13:40:00 0.114 35.500 2025/04/17 13:35:00 0.116 35.700 2025/04/17 13:30:00 0.111 35.200 2025/04/17 13:25:00 0.119 36.000 2025/04/17 13:20:00 0.121 36.200 2025/04/17 13:15:00 0.117 35.800 2025/04/17 13:10:00 0.113 35.400 2025/04/17 13:05:00 0.111 35.200 2025/04/17 13:00:00 0.116 35.700 2025/04/17 12:55:00 0.118 35.900 2025/04/17 12:50:00 0.115 35.600 2025/04/17 12:45:00 0.112 35.300 2025/04/17 12:40:00 0.110 35.100 2025/04/17 12:35:00 0.112 35.300 2025/04/17 12:30:00 0.117 35.800 2025/04/17 12:25:00 0.112 35.300 2025/04/17 12:20:00 0.122 36.300 2025/04/17 12:15:00 0.114 35.500 2025/04/17 12:10:00 0.112 35.300 2025/04/17 12:05:00 0.108 34.900 2025/04/17 12:00:00 0.110 35.100 2025/04/17 11:55:00 0.113 35.400 2025/04/17 11:50:00 0.115 35.600 2025/04/17 11:45:00 0.115 35.600 2025/04/17 11:40:00 0.108 34.900 2025/04/17 11:35:00 0.108 34.900 2025/04/17 11:30:00 0.112 35.300 2025/04/17 11:25:00 0.112 35.300 2025/04/17 11:05:00 0.112 35.300 2025/04/17 11:00:00 0.114 35.500 2025/04/17 10:55:00 0.114 35.500 2025/04/17 10:50:00 0.114 35.500 2025/04/17 10:45:00 0.117 35.800 2025/04/17 10:40:00 0.110 35.100 2025/04/17 10:35:00 0.110 35.100 2025/04/17 10:30:00 0.116 35.700 2025/04/17 10:25:00 0.115 35.600 2025/04/17 10:20:00 0.107 34.800 2025/04/17 10:15:00 0.117 35.800 2025/04/17 10:10:00 0.113 35.400 2025/04/17 10:05:00 0.116 35.700 2025/04/17 10:00:00 0.115 35.600 2025/04/17 09:55:00 0.111 35.200 2025/04/17 09:50:00 0.116 35.700 2025/04/17 09:45:00 0.122 36.300 2025/04/17 09:40:00 0.114 35.500 2025/04/17 09:35:00 0.116 35.700 2025/04/17 09:30:00 0.112 35.300 2025/04/17 09:25:00 0.116 35.700 2025/04/17 09:20:00 0.116 35.700 2025/04/17 09:15:00 0.113 35.400 2025/04/17 09:10:00 0.117 35.800 2025/04/17 09:05:00 0.119 36.000 2025/04/17 09:00:00 0.117 35.800 2025/04/17 08:55:00 0.120 36.100 2025/04/17 08:50:00 0.116 35.700 2025/04/17 08:45:00 0.120 36.100 2025/04/17 08:40:00 0.116 35.700 2025/04/17 08:35:00 0.115 35.600 2025/04/17 08:30:00 0.122 36.300 2025/04/17 08:25:00 0.119 36.000 2025/04/17 08:20:00 0.110 35.100 2025/04/17 08:15:00 0.118 35.900 2025/04/17 08:10:00 0.114 35.500 2025/04/17 08:05:00 0.119 36.000 2025/04/17 08:00:00 0.116 35.700 2025/04/17 07:55:00 0.121 36.200 2025/04/17 07:50:00 0.121 36.200 2025/04/17 07:45:00 0.124 36.500 2025/04/17 07:40:00 0.114 35.500 2025/04/17 07:35:00 0.114 35.500 2025/04/17 07:30:00 0.113 35.400 2025/04/17 07:25:00 0.114 35.500 2025/04/17 07:20:00 0.117 35.800 2025/04/17 07:15:00 0.117 35.800 2025/04/17 07:10:00 0.109 35.000 2025/04/17 07:05:00 0.117 35.800 2025/04/17 07:00:00 0.119 36.000 2025/04/17 06:55:00 0.119 36.000 2025/04/17 06:50:00 0.118 35.900 2025/04/17 06:45:00 0.113 35.400 2025/04/17 06:40:00 0.118 35.900 2025/04/17 06:35:00 0.111 35.200 2025/04/17 06:30:00 0.110 35.100 2025/04/17 06:25:00 0.113 35.400 2025/04/17 06:20:00 0.110 35.100 2025/04/17 06:15:00 0.119 36.000 2025/04/17 06:10:00 0.114 35.500 2025/04/17 06:05:00 0.111 35.200 2025/04/17 06:00:00 0.109 35.000 2025/04/17 05:55:00 0.114 35.500 2025/04/17 05:50:00 0.112 35.300 2025/04/17 05:45:00 0.111 35.200 2025/04/17 05:40:00 0.104 34.500 2025/04/17 05:35:00 0.107 34.800 2025/04/17 05:30:00 0.109 35.000 2025/04/17 05:25:00 0.112 35.300 2025/04/17 05:20:00 0.103 34.400 2025/04/17 05:15:00 0.103 34.400 2025/04/17 05:10:00 0.105 34.600 2025/04/17 05:05:00 0.107 34.800 2025/04/17 05:00:00 0.110 35.100 2025/04/17 04:55:00 0.105 34.600 2025/04/17 04:50:00 0.104 34.500 2025/04/17 04:45:00 0.113 35.400 2025/04/17 04:40:00 0.111 35.200 2025/04/17 04:35:00 0.101 34.200 2025/04/17 04:30:00 0.113 35.400 2025/04/17 04:25:00 0.110 35.100 2025/04/17 04:20:00 0.105 34.600 2025/04/17 04:15:00 0.111 35.200 2025/04/17 04:10:00 0.104 34.500 2025/04/17 04:05:00 0.103 34.400 2025/04/17 04:00:00 0.098 33.900 2025/04/17 03:55:00 0.105 34.600 2025/04/17 03:50:00 0.104 34.500 2025/04/17 03:45:00 0.101 34.200 2025/04/17 03:40:00 0.101 34.200 2025/04/17 03:35:00 0.103 34.400 2025/04/17 03:30:00 0.096 33.700 2025/04/17 03:25:00 0.099 34.000 2025/04/17 03:20:00 0.102 34.300 2025/04/17 03:15:00 0.095 33.600 2025/04/17 03:10:00 0.099 34.000 2025/04/17 03:05:00 0.096 33.700 2025/04/17 03:00:00 0.094 33.500 2025/04/17 02:55:00 0.092 33.300 2025/04/17 02:50:00 0.092 33.300 2025/04/17 02:45:00 0.102 34.300 2025/04/17 02:40:00 0.098 33.900 2025/04/17 02:35:00 0.100 34.100 2025/04/17 02:30:00 0.099 34.000 2025/04/17 02:25:00 0.096 33.700 2025/04/17 02:20:00 0.092 33.300 2025/04/17 02:15:00 0.096 33.700 2025/04/17 02:10:00 0.091 33.200 2025/04/17 02:05:00 0.101 34.200 2025/04/17 02:00:00 0.098 33.900 2025/04/17 01:55:00 0.093 33.400 2025/04/17 01:50:00 0.091 33.200 2025/04/17 01:45:00 0.094 33.500 2025/04/17 01:40:00 0.104 34.500 2025/04/17 01:35:00 0.095 33.600 2025/04/17 01:30:00 0.099 34.000 2025/04/17 01:25:00 0.093 33.400 2025/04/17 01:20:00 0.101 34.200 2025/04/17 01:15:00 0.101 34.200 2025/04/17 01:10:00 0.106 34.700 2025/04/17 01:05:00 0.106 34.700 2025/04/17 01:00:00 0.105 34.600 2025/04/17 00:55:00 0.101 34.200 2025/04/17 00:50:00 0.107 34.800 2025/04/17 00:45:00 0.097 33.800 2025/04/17 00:40:00 0.101 34.200 2025/04/17 00:35:00 0.097 33.800 2025/04/17 00:30:00 0.100 34.100 2025/04/17 00:25:00 0.104 34.500 2025/04/17 00:20:00 0.102 34.300 2025/04/17 00:15:00 0.099 34.000 2025/04/17 00:10:00 0.097 33.800 2025/04/17 00:05:00 0.106 34.700 2025/04/17 00:00:00 0.095 33.600 2025/04/16 23:55:00 0.099 34.000 2025/04/16 23:50:00 0.095 33.600 2025/04/16 23:45:00 0.098 33.900 2025/04/16 23:40:00 0.095 33.600 2025/04/16 23:35:00 0.095 33.600 2025/04/16 23:30:00 0.098 33.900 2025/04/16 23:25:00 0.091 33.200 2025/04/16 23:20:00 0.104 34.500 2025/04/16 23:15:00 0.104 34.500 2025/04/16 23:10:00 0.094 33.500 2025/04/16 23:05:00 0.100 34.100 2025/04/16 23:00:00 0.097 33.800 2025/04/16 22:55:00 0.098 33.900 2025/04/16 22:50:00 0.095 33.600 2025/04/16 22:45:00 0.093 33.400 2025/04/16 22:40:00 0.097 33.800 2025/04/16 22:35:00 0.092 33.300 2025/04/16 22:30:00 0.092 33.300 2025/04/16 22:25:00 0.091 33.200 2025/04/16 22:20:00 0.089 33.000 2025/04/16 22:15:00 0.089 33.000 2025/04/16 22:10:00 0.091 33.200 2025/04/16 22:05:00 0.103 34.400 2025/04/16 22:00:00 0.103 34.400 2025/04/16 21:55:00 0.104 34.500 2025/04/16 21:50:00 0.102 34.300 2025/04/16 21:45:00 0.094 33.500 2025/04/16 21:40:00 0.091 33.200 2025/04/16 21:35:00 0.086 32.700 2025/04/16 21:30:00 0.099 34.000 2025/04/16 21:25:00 0.093 33.400 2025/04/16 21:20:00 0.096 33.700 2025/04/16 21:15:00 0.102 34.300 2025/04/16 21:10:00 0.101 34.200 2025/04/16 21:05:00 0.094 33.500 2025/04/16 21:00:00 0.087 32.800 2025/04/16 20:55:00 0.098 33.900 2025/04/16 20:50:00 0.094 33.500 2025/04/16 20:45:00 0.099 34.000 2025/04/16 20:40:00 0.092 33.300 2025/04/16 20:35:00 0.096 33.700 2025/04/16 20:30:00 0.090 33.100 2025/04/16 20:25:00 0.091 33.200 2025/04/16 20:20:00 0.089 33.000 2025/04/16 20:15:00 0.099 34.000 2025/04/16 20:10:00 0.098 33.900 2025/04/16 20:05:00 0.090 33.100 2025/04/16 20:00:00 0.093 33.400 2025/04/16 19:55:00 0.101 34.200 2025/04/16 19:50:00 0.103 34.400 2025/04/16 19:45:00 0.101 34.200 2025/04/16 19:40:00 0.092 33.300 2025/04/16 19:35:00 0.093 33.400 2025/04/16 19:30:00 0.097 33.800 2025/04/16 19:25:00 0.091 33.200 2025/04/16 19:20:00 0.093 33.400 2025/04/16 19:15:00 0.098 33.900 2025/04/16 19:10:00 0.095 33.600 2025/04/16 19:05:00 0.092 33.300 2025/04/16 19:00:00 0.098 33.900 2025/04/16 18:55:00 0.090 33.100 2025/04/16 18:50:00 0.100 34.100 2025/04/16 18:45:00 0.095 33.600 2025/04/16 18:40:00 0.098 33.900 2025/04/16 18:35:00 0.092 33.300 2025/04/16 18:30:00 0.096 33.700 2025/04/16 18:25:00 0.094 33.500 2025/04/16 18:20:00 0.093 33.400 2025/04/16 18:15:00 0.101 34.200 2025/04/16 18:10:00 0.101 34.200 2025/04/16 18:05:00 0.096 33.700 2025/04/16 18:00:00 0.101 34.200 2025/04/16 17:55:00 0.095 33.600 2025/04/16 17:50:00 0.100 34.100 2025/04/16 17:45:00 0.100 34.100 2025/04/16 17:40:00 0.096 33.700 2025/04/16 17:35:00 0.107 34.800 2025/04/16 17:30:00 0.100 34.100 2025/04/16 17:25:00 0.098 33.900 2025/04/16 17:20:00 0.096 33.700 2025/04/16 17:15:00 0.095 33.600 2025/04/16 17:10:00 0.094 33.500 2025/04/16 17:05:00 0.096 33.700 2025/04/16 17:00:00 0.091 33.200 2025/04/16 16:55:00 0.099 34.000 2025/04/16 16:50:00 0.100 34.100 2025/04/16 16:45:00 0.097 33.800 2025/04/16 16:40:00 0.094 33.500 2025/04/16 16:35:00 0.106 34.700 2025/04/16 16:30:00 0.091 33.200 2025/04/16 16:25:00 0.103 34.400 2025/04/16 16:20:00 0.096 33.700 2025/04/16 16:15:00 0.101 34.200 2025/04/16 16:10:00 0.096 33.700 2025/04/16 16:05:00 0.095 33.600 2025/04/16 16:00:00 0.096 33.700 2025/04/16 15:55:00 0.103 34.400 2025/04/16 15:50:00 0.099 34.000 2025/04/16 15:45:00 0.097 33.800 2025/04/16 15:40:00 0.100 34.100 2025/04/16 15:35:00 0.106 34.700 2025/04/16 15:30:00 0.104 34.500 2025/04/16 15:25:00 0.105 34.600 2025/04/16 15:20:00 0.099 34.000 2025/04/16 15:15:00 0.098 33.900 2025/04/16 15:10:00 0.104 34.500 2025/04/16 15:05:00 0.098 33.900 2025/04/16 15:00:00 0.102 34.300 2025/04/16 14:55:00 0.102 34.300 2025/04/16 14:50:00 0.099 34.000 2025/04/16 14:45:00 0.101 34.200 2025/04/16 14:40:00 0.109 35.000 2025/04/16 14:35:00 0.100 34.100 2025/04/16 14:30:00 0.107 34.800 2025/04/16 14:25:00 0.099 34.000 2025/04/16 14:20:00 0.111 35.200 2025/04/16 14:15:00 0.105 34.600 2025/04/16 14:10:00 0.101 34.200 2025/04/16 14:05:00 0.105 34.600 2025/04/16 14:00:00 0.109 35.000 2025/04/16 13:55:00 0.114 35.500 2025/04/16 13:50:00 0.104 34.500 2025/04/16 13:45:00 0.112 35.300 2025/04/16 13:40:00 0.112 35.300 2025/04/16 13:35:00 0.103 34.400 2025/04/16 13:30:00 0.107 34.800 2025/04/16 13:25:00 0.104 34.500 2025/04/16 13:20:00 0.101 34.200 2025/04/16 13:15:00 0.112 35.300 2025/04/16 13:10:00 0.103 34.400 2025/04/16 13:05:00 0.102 34.300 2025/04/16 13:00:00 0.100 34.100 2025/04/16 12:55:00 0.103 34.400 2025/04/16 12:50:00 0.100 34.100 2025/04/16 12:45:00 0.101 34.200 2025/04/16 12:40:00 0.104 34.500 2025/04/16 12:35:00 0.105 34.600 2025/04/16 12:30:00 0.110 35.100 2025/04/16 12:25:00 0.111 35.200 2025/04/16 12:20:00 0.099 34.000 2025/04/16 12:15:00 0.105 34.600 2025/04/16 12:10:00 0.102 34.300 2025/04/16 12:05:00 0.100 34.100 2025/04/16 12:00:00 0.105 34.600 2025/04/16 11:55:00 0.105 34.600 2025/04/16 11:50:00 0.112 35.300 2025/04/16 11:45:00 0.107 34.800 2025/04/16 11:40:00 0.102 34.300 2025/04/16 11:35:00 0.109 35.000 2025/04/16 11:30:00 0.105 34.600 2025/04/16 11:25:00 0.106 34.700 2025/04/16 11:20:00 0.107 34.800 2025/04/16 11:15:00 0.105 34.600 2025/04/16 11:10:00 0.110 35.100 2025/04/16 11:05:00 0.105 34.600 2025/04/16 11:00:00 0.106 34.700 2025/04/16 10:55:00 0.107 34.800 2025/04/16 10:50:00 0.110 35.100 2025/04/16 10:45:00 0.114 35.500 2025/04/16 10:40:00 0.108 34.900 2025/04/16 10:35:00 0.114 35.500 2025/04/16 10:30:00 0.117 35.800 2025/04/16 10:25:00 0.112 35.300 2025/04/16 10:20:00 0.106 34.700 2025/04/16 10:15:00 0.119 36.000 2025/04/16 10:10:00 0.105 34.600 2025/04/16 10:05:00 0.108 34.900 2025/04/16 10:00:00 0.120 36.100 2025/04/16 09:55:00 0.112 35.300 2025/04/16 09:50:00 0.106 34.700 2025/04/16 09:45:00 0.108 34.900 2025/04/16 09:40:00 0.108 34.900 2025/04/16 09:35:00 0.109 35.000 2025/04/16 09:30:00 0.104 34.500 2025/04/16 09:25:00 0.109 35.000 2025/04/16 09:20:00 0.109 35.000 2025/04/16 09:15:00 0.120 36.100 2025/04/16 09:10:00 0.106 34.700 2025/04/16 09:05:00 0.113 35.400 2025/04/16 09:00:00 0.118 35.900 2025/04/16 08:55:00 0.107 34.800 2025/04/16 08:50:00 0.105 34.600 2025/04/16 08:45:00 0.112 35.300 2025/04/16 08:40:00 0.118 35.900 2025/04/16 08:35:00 0.114 35.500 2025/04/16 08:30:00 0.105 34.600 2025/04/16 08:25:00 0.113 35.400 2025/04/16 08:20:00 0.105 34.600 2025/04/16 08:15:00 0.110 35.100 2025/04/16 08:10:00 0.111 35.200 2025/04/16 08:05:00 0.121 36.200 2025/04/16 08:00:00 0.109 35.000 2025/04/16 07:55:00 0.112 35.300 2025/04/16 07:50:00 0.120 36.100 2025/04/16 07:45:00 0.109 35.000 2025/04/16 07:40:00 0.111 35.200 2025/04/16 07:35:00 0.116 35.700 2025/04/16 07:30:00 0.116 35.700 2025/04/16 07:25:00 0.111 35.200 2025/04/16 07:20:00 0.107 34.800 2025/04/16 07:15:00 0.106 34.700 2025/04/16 07:10:00 0.110 35.100 2025/04/16 07:05:00 0.108 34.900 2025/04/16 07:00:00 0.116 35.700 2025/04/16 06:55:00 0.112 35.300 2025/04/16 06:50:00 0.120 36.100 2025/04/16 06:45:00 0.115 35.600 2025/04/16 06:40:00 0.107 34.800 2025/04/16 06:35:00 0.118 35.900 2025/04/16 06:30:00 0.113 35.400 2025/04/16 06:25:00 0.109 35.000 2025/04/16 06:20:00 0.113 35.400 2025/04/16 06:15:00 0.106 34.700 2025/04/16 06:10:00 0.110 35.100 2025/04/16 06:05:00 0.114 35.500 2025/04/16 06:00:00 0.113 35.400 2025/04/16 05:55:00 0.123 36.400 2025/04/16 05:50:00 0.120 36.100 2025/04/16 05:45:00 0.121 36.200 2025/04/16 05:40:00 0.116 35.700 2025/04/16 05:35:00 0.118 35.900 2025/04/16 05:30:00 0.112 35.300 2025/04/16 05:25:00 0.110 35.100 2025/04/16 05:20:00 0.123 36.400 2025/04/16 05:15:00 0.110 35.100 2025/04/16 05:10:00 0.121 36.200 2025/04/16 05:05:00 0.112 35.300 2025/04/16 05:00:00 0.113 35.400 2025/04/16 04:55:00 0.110 35.100 2025/04/16 04:50:00 0.107 34.800 2025/04/16 04:45:00 0.117 35.800 2025/04/16 04:40:00 0.123 36.400 2025/04/16 04:35:00 0.120 36.100 2025/04/16 04:30:00 0.108 34.900 2025/04/16 04:25:00 0.122 36.300 2025/04/16 04:20:00 0.108 34.900 2025/04/16 04:15:00 0.110 35.100 2025/04/16 04:10:00 0.111 35.200 2025/04/16 04:05:00 0.123 36.400 2025/04/16 04:00:00 0.117 35.800 2025/04/16 03:55:00 0.109 35.000 2025/04/16 03:50:00 0.110 35.100 2025/04/16 03:45:00 0.110 35.100 2025/04/16 03:40:00 0.110 35.100 2025/04/16 03:35:00 0.125 36.600 2025/04/16 03:30:00 0.113 35.400 2025/04/16 03:25:00 0.119 36.000 2025/04/16 03:20:00 0.109 35.000 2025/04/16 03:15:00 0.109 35.000 2025/04/16 03:10:00 0.108 34.900 2025/04/16 03:05:00 0.114 35.500 2025/04/16 03:00:00 0.115 35.600 2025/04/16 02:55:00 0.109 35.000 2025/04/16 02:50:00 0.110 35.100 2025/04/16 02:45:00 0.115 35.600 2025/04/16 02:40:00 0.107 34.800 2025/04/16 02:35:00 0.110 35.100 2025/04/16 02:30:00 0.116 35.700 2025/04/16 02:25:00 0.114 35.500 2025/04/16 02:20:00 0.106 34.700 2025/04/16 02:15:00 0.108 34.900 2025/04/16 02:10:00 0.108 34.900 2025/04/16 02:05:00 0.118 35.900 2025/04/16 02:00:00 0.105 34.600 2025/04/16 01:55:00 0.112 35.300 2025/04/16 01:50:00 0.105 34.600 2025/04/16 01:45:00 0.107 34.800 2025/04/16 01:40:00 0.115 35.600 2025/04/16 01:35:00 0.116 35.700 2025/04/16 01:30:00 0.104 34.500 2025/04/16 01:25:00 0.113 35.400 2025/04/16 01:20:00 0.113 35.400 2025/04/16 01:15:00 0.112 35.300 2025/04/16 01:10:00 0.110 35.100 2025/04/16 01:05:00 0.109 35.000 2025/04/16 01:00:00 0.109 35.000 2025/04/16 00:55:00 0.106 34.700 2025/04/16 00:50:00 0.116 35.700 2025/04/16 00:45:00 0.116 35.700 2025/04/16 00:40:00 0.114 35.500 2025/04/16 00:35:00 0.116 35.700 2025/04/16 00:30:00 0.118 35.900 2025/04/16 00:25:00 0.105 34.600 2025/04/16 00:20:00 0.108 34.900 2025/04/16 00:15:00 0.116 35.700 2025/04/16 00:10:00 0.109 35.000 2025/04/16 00:05:00 0.105 34.600 2025/04/16 00:00:00 0.106 34.700 2025/04/15 23:55:00 0.108 34.900 2025/04/15 23:50:00 0.107 34.800 2025/04/15 23:45:00 0.120 36.100 2025/04/15 23:40:00 0.119 36.000 2025/04/15 23:35:00 0.105 34.600 2025/04/15 23:30:00 0.109 35.000 2025/04/15 23:25:00 0.102 34.300 2025/04/15 23:20:00 0.101 34.200 2025/04/15 23:15:00 0.117 35.800 2025/04/15 23:10:00 0.101 34.200 2025/04/15 23:05:00 0.115 35.600 2025/04/15 23:00:00 0.110 35.100 2025/04/15 22:55:00 0.113 35.400 2025/04/15 22:50:00 0.112 35.300 2025/04/15 22:45:00 0.115 35.600 2025/04/15 22:40:00 0.105 34.600 2025/04/15 22:35:00 0.103 34.400 2025/04/15 22:30:00 0.103 34.400 2025/04/15 22:25:00 0.102 34.300 2025/04/15 22:20:00 0.102 34.300 2025/04/15 22:15:00 0.107 34.800 2025/04/15 22:10:00 0.107 34.800 2025/04/15 22:05:00 0.100 34.100 2025/04/15 22:00:00 0.107 34.800 2025/04/15 21:55:00 0.113 35.400 2025/04/15 21:50:00 0.114 35.500 2025/04/15 21:45:00 0.115 35.600 2025/04/15 21:40:00 0.109 35.000 2025/04/15 21:35:00 0.101 34.200 2025/04/15 21:30:00 0.107 34.800 2025/04/15 21:25:00 0.102 34.300 2025/04/15 21:20:00 0.107 34.800 2025/04/15 21:15:00 0.115 35.600 2025/04/15 21:10:00 0.109 35.000 2025/04/15 21:05:00 0.100 34.100 2025/04/15 21:00:00 0.107 34.800 2025/04/15 20:55:00 0.115 35.600 2025/04/15 20:50:00 0.115 35.600 2025/04/15 20:45:00 0.117 35.800 2025/04/15 20:40:00 0.107 34.800 2025/04/15 20:35:00 0.107 34.800 2025/04/15 20:30:00 0.115 35.600 2025/04/15 20:25:00 0.114 35.500 2025/04/15 20:20:00 0.117 35.800 2025/04/15 20:15:00 0.101 34.200 2025/04/15 20:10:00 0.106 34.700 2025/04/15 20:05:00 0.106 34.700 2025/04/15 20:00:00 0.108 34.900 2025/04/15 19:55:00 0.105 34.600 2025/04/15 19:50:00 0.110 35.100 2025/04/15 19:45:00 0.112 35.300 2025/04/15 19:40:00 0.115 35.600 2025/04/15 19:35:00 0.105 34.600 2025/04/15 19:30:00 0.105 34.600 2025/04/15 19:25:00 0.114 35.500 2025/04/15 19:20:00 0.110 35.100 2025/04/15 19:15:00 0.111 35.200 2025/04/15 19:10:00 0.115 35.600 2025/04/15 19:05:00 0.104 34.500 2025/04/15 19:00:00 0.110 35.100 2025/04/15 18:55:00 0.111 35.200 2025/04/15 18:50:00 0.108 34.900 2025/04/15 18:45:00 0.111 35.200 2025/04/15 18:40:00 0.103 34.400 2025/04/15 18:35:00 0.120 36.100 2025/04/15 18:30:00 0.104 34.500 2025/04/15 18:25:00 0.103 34.400 2025/04/15 18:20:00 0.119 36.000 2025/04/15 18:15:00 0.107 34.800 2025/04/15 18:10:00 0.120 36.100 2025/04/15 18:05:00 0.110 35.100 2025/04/15 18:00:00 0.116 35.700 2025/04/15 17:55:00 0.108 34.900 2025/04/15 17:50:00 0.123 36.400 2025/04/15 17:45:00 0.112 35.300 2025/04/15 17:40:00 0.113 35.400 2025/04/15 17:35:00 0.114 35.500 2025/04/15 17:30:00 0.118 35.900 2025/04/15 17:25:00 0.118 35.900 2025/04/15 17:20:00 0.109 35.000 2025/04/15 17:15:00 0.110 35.100 2025/04/15 17:10:00 0.119 36.000 2025/04/15 17:05:00 0.110 35.100 2025/04/15 17:00:00 0.114 35.500 2025/04/15 16:55:00 0.113 35.400 2025/04/15 16:50:00 0.112 35.300 2025/04/15 16:45:00 0.115 35.600 2025/04/15 16:40:00 0.118 35.900 2025/04/15 16:35:00 0.114 35.500 2025/04/15 16:30:00 0.121 36.200 2025/04/15 16:25:00 0.114 35.500 2025/04/15 16:20:00 0.123 36.400 2025/04/15 16:15:00 0.116 35.700 2025/04/15 16:10:00 0.123 36.400 2025/04/15 16:05:00 0.118 35.900 2025/04/15 16:00:00 0.120 36.100 2025/04/15 15:55:00 0.120 36.100 2025/04/15 15:50:00 0.120 36.100 2025/04/15 15:45:00 0.112 35.300 2025/04/15 15:40:00 0.114 35.500 2025/04/15 15:35:00 0.121 36.200 2025/04/15 15:30:00 0.129 37.000 2025/04/15 15:25:00 0.120 36.100 2025/04/15 15:20:00 0.116 35.700 2025/04/15 15:15:00 0.120 36.100 2025/04/15 15:10:00 0.121 36.200 2025/04/15 15:05:00 0.126 36.700 2025/04/15 15:00:00 0.129 37.000 2025/04/15 14:55:00 0.128 36.900 2025/04/15 14:50:00 0.115 35.600 2025/04/15 14:45:00 0.119 36.000 2025/04/15 14:40:00 0.130 37.100 2025/04/15 14:35:00 0.116 35.700 2025/04/15 14:30:00 0.116 35.700 2025/04/15 14:25:00 0.130 37.100 2025/04/15 14:20:00 0.123 36.400 2025/04/15 14:15:00 0.128 36.900 2025/04/15 14:10:00 0.122 36.300 2025/04/15 14:05:00 0.119 36.000 2025/04/15 14:00:00 0.127 36.800 2025/04/15 13:55:00 0.120 36.100 2025/04/15 13:50:00 0.120 36.100 2025/04/15 13:45:00 0.121 36.200 2025/04/15 13:40:00 0.121 36.200 2025/04/15 13:35:00 0.124 36.500 2025/04/15 13:30:00 0.124 36.500 2025/04/15 13:25:00 0.122 36.300 2025/04/15 13:20:00 0.131 37.200 2025/04/15 13:15:00 0.121 36.200 2025/04/15 13:10:00 0.120 36.100 2025/04/15 13:05:00 0.134 37.500 2025/04/15 13:00:00 0.125 36.600 2025/04/15 12:55:00 0.131 37.200 2025/04/15 12:50:00 0.125 36.600 2025/04/15 12:45:00 0.124 36.500 2025/04/15 12:40:00 0.127 36.800 2025/04/15 12:35:00 0.120 36.100 2025/04/15 12:30:00 0.121 36.200 2025/04/15 12:25:00 0.124 36.500 2025/04/15 12:20:00 0.130 37.100 2025/04/15 12:15:00 0.131 37.200 2025/04/15 12:10:00 0.123 36.400 2025/04/15 12:05:00 0.124 36.500 2025/04/15 12:00:00 0.123 36.400 2025/04/15 11:55:00 0.131 37.200 2025/04/15 11:50:00 0.125 36.600 2025/04/15 11:45:00 0.126 36.700 2025/04/15 11:40:00 0.132 37.300 2025/04/15 11:35:00 0.123 36.400 2025/04/15 11:30:00 0.121 36.200 2025/04/15 11:25:00 0.125 36.600 2025/04/15 11:20:00 0.135 37.600 2025/04/15 11:15:00 0.123 36.400 2025/04/15 11:10:00 0.124 36.500 2025/04/15 11:05:00 0.135 37.600 2025/04/15 11:00:00 0.119 36.000 2025/04/15 10:55:00 0.135 37.600 2025/04/15 10:50:00 0.124 36.500 2025/04/15 10:45:00 0.123 36.400 2025/04/15 10:40:00 0.122 36.300 2025/04/15 10:35:00 0.118 35.900 2025/04/15 10:30:00 0.125 36.600 2025/04/15 10:25:00 0.120 36.100 2025/04/15 10:20:00 0.134 37.500 2025/04/15 10:15:00 0.119 36.000 2025/04/15 10:10:00 0.117 35.800 2025/04/15 10:05:00 0.119 36.000 2025/04/15 10:00:00 0.124 36.500 2025/04/15 09:55:00 0.117 35.800 2025/04/15 09:50:00 0.118 35.900 2025/04/15 09:45:00 0.121 36.200 2025/04/15 09:40:00 0.114 35.500 2025/04/15 09:35:00 0.115 35.600 2025/04/15 09:30:00 0.121 36.200 2025/04/15 09:25:00 0.119 36.000 2025/04/15 09:20:00 0.108 34.900 2025/04/15 09:15:00 0.116 35.700 2025/04/15 09:10:00 0.116 35.700 2025/04/15 09:05:00 0.118 35.900 2025/04/15 09:00:00 0.115 35.600 2025/04/15 08:55:00 0.110 35.100 2025/04/15 08:50:00 0.109 35.000 2025/04/15 08:45:00 0.108 34.900 2025/04/15 08:40:00 0.108 34.900 2025/04/15 08:35:00 0.123 36.400 2025/04/15 08:30:00 0.117 35.800 2025/04/15 08:25:00 0.124 36.500 2025/04/15 08:20:00 0.110 35.100 2025/04/15 08:15:00 0.120 36.100 2025/04/15 08:10:00 0.110 35.100 2025/04/15 08:05:00 0.121 36.200 2025/04/15 08:00:00 0.117 35.800 2025/04/15 07:55:00 0.124 36.500 2025/04/15 07:50:00 0.112 35.300 2025/04/15 07:45:00 0.109 35.000 2025/04/15 07:40:00 0.113 35.400 2025/04/15 07:35:00 0.110 35.100 2025/04/15 07:30:00 0.112 35.300 2025/04/15 07:25:00 0.110 35.100 2025/04/15 07:20:00 0.116 35.700 2025/04/15 07:15:00 0.111 35.200 2025/04/15 07:10:00 0.113 35.400 2025/04/15 07:05:00 0.108 34.900 2025/04/15 07:00:00 0.126 36.700 2025/04/15 06:55:00 0.116 35.700 2025/04/15 06:50:00 0.125 36.600 2025/04/15 06:45:00 0.116 35.700 2025/04/15 06:40:00 0.109 35.000 2025/04/15 06:35:00 0.112 35.300 2025/04/15 06:30:00 0.115 35.600 2025/04/15 06:25:00 0.112 35.300 2025/04/15 06:20:00 0.112 35.300 2025/04/15 06:15:00 0.122 36.300 2025/04/15 06:10:00 0.118 35.900 2025/04/15 06:05:00 0.122 36.300 2025/04/15 06:00:00 0.118 35.900 2025/04/15 05:55:00 0.114 35.500 2025/04/15 05:50:00 0.116 35.700 2025/04/15 05:45:00 0.113 35.400 2025/04/15 05:40:00 0.114 35.500 2025/04/15 05:35:00 0.114 35.500 2025/04/15 05:30:00 0.116 35.700 2025/04/15 05:25:00 0.119 36.000 2025/04/15 05:20:00 0.109 35.000 2025/04/15 05:15:00 0.124 36.500 2025/04/15 05:10:00 0.116 35.700 2025/04/15 05:05:00 0.117 35.800 2025/04/15 05:00:00 0.120 36.100 2025/04/15 04:55:00 0.115 35.600 2025/04/15 04:50:00 0.126 36.700 2025/04/15 04:45:00 0.117 35.800 2025/04/15 04:40:00 0.117 35.800 2025/04/15 04:35:00 0.129 37.000 2025/04/15 04:30:00 0.118 35.900 2025/04/15 04:25:00 0.126 36.700 2025/04/15 04:20:00 0.120 36.100 2025/04/15 04:15:00 0.122 36.300 2025/04/15 04:10:00 0.127 36.800 2025/04/15 04:05:00 0.122 36.300 2025/04/15 04:00:00 0.120 36.100 2025/04/15 03:55:00 0.115 35.600 2025/04/15 03:50:00 0.117 35.800 2025/04/15 03:45:00 0.123 36.400 2025/04/15 03:40:00 0.127 36.800 2025/04/15 03:35:00 0.117 35.800 2025/04/15 03:30:00 0.116 35.700 2025/04/15 03:25:00 0.121 36.200 2025/04/15 03:20:00 0.126 36.700 2025/04/15 03:15:00 0.127 36.800 2025/04/15 03:10:00 0.123 36.400 2025/04/15 03:05:00 0.127 36.800 2025/04/15 03:00:00 0.118 35.900 2025/04/15 02:55:00 0.123 36.400 2025/04/15 02:50:00 0.123 36.400 2025/04/15 02:45:00 0.124 36.500 2025/04/15 02:40:00 0.122 36.300 2025/04/15 02:35:00 0.123 36.400 2025/04/15 02:30:00 0.125 36.600 2025/04/15 02:25:00 0.129 37.000 2025/04/15 02:20:00 0.123 36.400 2025/04/15 02:15:00 0.119 36.000 2025/04/15 02:10:00 0.128 36.900 2025/04/15 02:05:00 0.118 35.900 2025/04/15 02:00:00 0.128 36.900 2025/04/15 01:55:00 0.125 36.600 2025/04/15 01:50:00 0.122 36.300 2025/04/15 01:45:00 0.130 37.100 2025/04/15 01:40:00 0.125 36.600 2025/04/15 01:35:00 0.120 36.100 2025/04/15 01:30:00 0.118 35.900 2025/04/15 01:25:00 0.119 36.000 2025/04/15 01:20:00 0.120 36.100 2025/04/15 01:15:00 0.114 35.500 2025/04/15 01:10:00 0.124 36.500 2025/04/15 01:05:00 0.134 37.500 2025/04/15 01:00:00 0.119 36.000 2025/04/15 00:55:00 0.116 35.700 2025/04/15 00:50:00 0.132 37.300 2025/04/15 00:45:00 0.127 36.800 2025/04/15 00:40:00 0.125 36.600 2025/04/15 00:35:00 0.124 36.500 2025/04/15 00:30:00 0.122 36.300 2025/04/15 00:25:00 0.125 36.600 2025/04/15 00:20:00 0.118 35.900 2025/04/15 00:15:00 0.124 36.500 2025/04/15 00:10:00 0.131 37.200 2025/04/15 00:05:00 0.116 35.700 2025/04/15 00:00:00 0.119 36.000 2025/04/14 23:55:00 0.115 35.600 2025/04/14 23:50:00 0.122 36.300 2025/04/14 23:45:00 0.125 36.600 2025/04/14 23:40:00 0.111 35.200 2025/04/14 23:35:00 0.116 35.700 2025/04/14 23:30:00 0.122 36.300 2025/04/14 23:25:00 0.117 35.800 2025/04/14 23:20:00 0.114 35.500 2025/04/14 23:15:00 0.116 35.700 2025/04/14 23:10:00 0.118 35.900 2025/04/14 23:05:00 0.122 36.300 2025/04/14 23:00:00 0.127 36.800 2025/04/14 22:55:00 0.114 35.500 2025/04/14 22:50:00 0.114 35.500 2025/04/14 22:45:00 0.114 35.500 2025/04/14 22:40:00 0.129 37.000 2025/04/14 22:35:00 0.120 36.100 2025/04/14 22:30:00 0.116 35.700 2025/04/14 22:25:00 0.125 36.600 2025/04/14 22:20:00 0.126 36.700 2025/04/14 22:15:00 0.118 35.900 2025/04/14 22:10:00 0.117 35.800 2025/04/14 22:05:00 0.117 35.800 2025/04/14 22:00:00 0.121 36.200 2025/04/14 21:55:00 0.110 35.100 2025/04/14 21:50:00 0.116 35.700 2025/04/14 21:45:00 0.115 35.600 2025/04/14 21:40:00 0.126 36.700 2025/04/14 21:35:00 0.113 35.400 2025/04/14 21:30:00 0.120 36.100 2025/04/14 21:25:00 0.115 35.600 2025/04/14 21:20:00 0.116 35.700 2025/04/14 21:15:00 0.115 35.600 2025/04/14 21:10:00 0.119 36.000 2025/04/14 21:05:00 0.122 36.300 2025/04/14 21:00:00 0.118 35.900 2025/04/14 20:55:00 0.112 35.300 2025/04/14 20:50:00 0.118 35.900 2025/04/14 20:45:00 0.115 35.600 2025/04/14 20:40:00 0.120 36.100 2025/04/14 20:35:00 0.112 35.300 2025/04/14 20:30:00 0.124 36.500 2025/04/14 20:25:00 0.110 35.100 2025/04/14 20:20:00 0.116 35.700 2025/04/14 20:15:00 0.119 36.000 2025/04/14 20:10:00 0.121 36.200 2025/04/14 20:05:00 0.113 35.400 2025/04/14 20:00:00 0.125 36.600 2025/04/14 19:55:00 0.113 35.400 2025/04/14 19:50:00 0.110 35.100 2025/04/14 19:45:00 0.111 35.200 2025/04/14 19:40:00 0.112 35.300 2025/04/14 19:35:00 0.112 35.300 2025/04/14 19:30:00 0.117 35.800 2025/04/14 19:25:00 0.120 36.100 2025/04/14 19:20:00 0.116 35.700 2025/04/14 19:15:00 0.121 36.200 2025/04/14 19:10:00 0.113 35.400 2025/04/14 19:05:00 0.114 35.500 2025/04/14 19:00:00 0.120 36.100 2025/04/14 18:55:00 0.114 35.500 2025/04/14 18:50:00 0.124 36.500 2025/04/14 18:45:00 0.112 35.300 2025/04/14 18:40:00 0.114 35.500 2025/04/14 18:35:00 0.113 35.400 2025/04/14 18:30:00 0.121 36.200 2025/04/14 18:25:00 0.112 35.300 2025/04/14 18:20:00 0.123 36.400 2025/04/14 18:15:00 0.121 36.200 2025/04/14 18:10:00 0.113 35.400 2025/04/14 18:05:00 0.113 35.400 2025/04/14 18:00:00 0.117 35.800 2025/04/14 17:55:00 0.126 36.700 2025/04/14 17:50:00 0.117 35.800 2025/04/14 17:45:00 0.110 35.100 2025/04/14 17:40:00 0.110 35.100 2025/04/14 17:35:00 0.120 36.100 2025/04/14 17:30:00 0.125 36.600 2025/04/14 17:25:00 0.108 34.900 2025/04/14 17:20:00 0.112 35.300 2025/04/14 17:15:00 0.120 36.100 2025/04/14 17:10:00 0.110 35.100 2025/04/14 17:05:00 0.124 36.500 2025/04/14 17:00:00 0.116 35.700 2025/04/14 16:55:00 0.125 36.600 2025/04/14 16:50:00 0.124 36.500 2025/04/14 16:45:00 0.120 36.100 2025/04/14 16:40:00 0.123 36.400 2025/04/14 16:35:00 0.120 36.100 2025/04/14 16:30:00 0.118 35.900 2025/04/14 16:25:00 0.123 36.400 2025/04/14 16:20:00 0.118 35.900 2025/04/14 16:15:00 0.123 36.400 2025/04/14 16:10:00 0.112 35.300 2025/04/14 16:05:00 0.118 35.900 2025/04/14 16:00:00 0.116 35.700 2025/04/14 15:55:00 0.123 36.400 2025/04/14 15:50:00 0.110 35.100 2025/04/14 15:45:00 0.117 35.800 2025/04/14 15:40:00 0.123 36.400 2025/04/14 15:35:00 0.113 35.400 2025/04/14 15:30:00 0.121 36.200 2025/04/14 15:25:00 0.114 35.500 2025/04/14 15:20:00 0.115 35.600 2025/04/14 15:15:00 0.112 35.300 2025/04/14 15:10:00 0.116 35.700 2025/04/14 15:05:00 0.127 36.800 2025/04/14 15:00:00 0.121 36.200 2025/04/14 14:55:00 0.118 35.900 2025/04/14 14:50:00 0.118 35.900 2025/04/14 14:45:00 0.113 35.400 2025/04/14 14:40:00 0.116 35.700 2025/04/14 14:35:00 0.113 35.400 2025/04/14 14:30:00 0.117 35.800 2025/04/14 14:25:00 0.112 35.300 2025/04/14 14:20:00 0.120 36.100 2025/04/14 14:15:00 0.111 35.200 2025/04/14 14:10:00 0.112 35.300 2025/04/14 14:05:00 0.116 35.700 2025/04/14 14:00:00 0.117 35.800 2025/04/14 13:55:00 0.123 36.400 2025/04/14 13:50:00 0.113 35.400 2025/04/14 13:45:00 0.116 35.700 2025/04/14 13:40:00 0.113 35.400 2025/04/14 13:35:00 0.120 36.100 2025/04/14 13:30:00 0.111 35.200 2025/04/14 13:25:00 0.110 35.100 2025/04/14 13:20:00 0.118 35.900 2025/04/14 13:15:00 0.118 35.900 2025/04/14 13:10:00 0.115 35.600 2025/04/14 13:05:00 0.110 35.100 2025/04/14 13:00:00 0.112 35.300 2025/04/14 12:55:00 0.120 36.100 2025/04/14 12:50:00 0.110 35.100 2025/04/14 12:45:00 0.120 36.100 2025/04/14 12:40:00 0.111 35.200 2025/04/14 12:35:00 0.118 35.900 2025/04/14 12:30:00 0.111 35.200 2025/04/14 12:25:00 0.113 15.900 2025/04/14 12:20:00 0.121 15.900 2025/04/14 12:15:00 0.121 15.900 2025/04/14 12:10:00 0.117 15.900 2025/04/14 12:05:00 0.123 15.900 2025/04/14 12:00:00 0.121 15.900 2025/04/14 11:55:00 0.116 15.900 2025/04/14 11:50:00 0.114 15.800 2025/04/14 11:45:00 0.114 15.800 2025/04/14 11:40:00 0.117 15.800 2025/04/14 11:35:00 0.123 15.800 2025/04/14 11:30:00 0.123 15.800 2025/04/14 11:25:00 0.125 15.800 2025/04/14 11:20:00 0.124 15.800 2025/04/14 11:15:00 0.115 15.800 2025/04/14 11:10:00 0.131 15.800 2025/04/14 11:05:00 0.117 15.800 2025/04/14 11:00:00 0.113 15.800 2025/04/14 10:55:00 0.114 15.800 2025/04/14 10:50:00 0.113 15.800 2025/04/14 10:45:00 0.120 15.800 2025/04/14 10:40:00 0.120 15.800 2025/04/14 10:35:00 0.123 15.800 2025/04/14 10:30:00 0.114 15.800 2025/04/14 10:25:00 0.110 15.800 2025/04/14 10:20:00 0.108 15.800 2025/04/14 10:15:00 0.110 15.800 2025/04/14 10:10:00 0.110 15.800 2025/04/14 10:05:00 0.104 15.800 2025/04/14 10:00:00 0.106 15.800 2025/04/14 09:55:00 0.110 15.800 2025/04/14 09:50:00 0.109 15.800 2025/04/14 09:45:00 0.111 15.800 2025/04/14 09:40:00 0.103 15.800 2025/04/14 09:35:00 0.100 15.800 2025/04/14 09:30:00 0.100 15.800 2025/04/14 09:25:00 0.097 15.800 2025/04/14 09:20:00 0.092 15.800 2025/04/14 09:15:00 0.093 15.800 2025/04/14 09:10:00 0.105 15.800 2025/04/14 09:05:00 0.094 15.800 2025/04/14 09:00:00 0.090 15.800 2025/04/14 08:55:00 0.098 15.800 2025/04/14 08:50:00 0.097 15.800 2025/04/14 08:45:00 0.086 15.800 2025/04/14 08:40:00 0.086 15.800 2025/04/14 08:35:00 0.085 15.800 2025/04/14 08:30:00 0.090 15.800 2025/04/14 08:25:00 0.098 15.800 2025/04/14 08:20:00 0.086 15.800 2025/04/14 08:15:00 0.087 15.800 2025/04/14 08:10:00 0.086 15.800 2025/04/14 08:05:00 0.095 15.800 2025/04/14 08:00:00 0.090 15.800 2025/04/14 07:55:00 0.094 15.800 2025/04/14 07:50:00 0.100 15.800 2025/04/14 07:45:00 0.097 15.800 2025/04/14 07:40:00 0.103 15.800 2025/04/14 07:35:00 0.092 15.800 2025/04/14 07:30:00 0.092 15.800 2025/04/14 07:25:00 0.092 15.800 2025/04/14 07:20:00 0.101 15.800 2025/04/14 07:15:00 0.095 15.800 2025/04/14 07:10:00 0.094 15.800 2025/04/14 07:05:00 0.095 15.800 2025/04/14 07:00:00 0.101 15.800 2025/04/14 06:55:00 0.097 15.800 2025/04/14 06:50:00 0.095 15.800 2025/04/14 06:45:00 0.095 15.800 2025/04/14 06:40:00 0.099 15.800 2025/04/14 06:35:00 0.097 15.800 2025/04/14 06:30:00 0.100 15.800 2025/04/14 06:25:00 0.098 15.800 2025/04/14 06:20:00 0.097 15.800 2025/04/14 06:15:00 0.094 15.800 2025/04/14 06:10:00 0.097 15.800 2025/04/14 06:05:00 0.100 15.800 2025/04/14 06:00:00 0.108 15.800 2025/04/14 05:55:00 0.110 15.800 2025/04/14 05:50:00 0.104 15.800 2025/04/14 05:45:00 0.102 15.800 2025/04/14 05:40:00 0.111 15.800 2025/04/14 05:35:00 0.101 15.800 2025/04/14 05:30:00 0.107 15.800 2025/04/14 05:25:00 0.112 15.800 2025/04/14 05:20:00 0.103 15.800 2025/04/14 05:15:00 0.106 15.800 2025/04/14 05:10:00 0.103 15.800 2025/04/14 05:05:00 0.110 15.800 2025/04/14 05:00:00 0.115 15.800 2025/04/14 04:55:00 0.109 15.800 2025/04/14 04:50:00 0.113 15.800 2025/04/14 04:45:00 0.118 15.800 2025/04/14 04:40:00 0.113 15.800 2025/04/14 04:35:00 0.110 15.800 2025/04/14 04:30:00 0.110 15.800 2025/04/14 04:25:00 0.116 15.800 2025/04/14 04:20:00 0.109 15.800 2025/04/14 04:15:00 0.110 15.800 2025/04/14 04:10:00 0.112 15.800 2025/04/14 04:05:00 0.109 15.800 2025/04/14 04:00:00 0.124 15.800 2025/04/14 03:55:00 0.118 15.800 2025/04/14 03:50:00 0.121 15.800 2025/04/14 03:45:00 0.113 15.800 2025/04/14 03:40:00 0.126 15.800 2025/04/14 03:35:00 0.126 15.800 2025/04/14 03:30:00 0.115 15.800 2025/04/14 03:25:00 0.117 15.800 2025/04/14 03:20:00 0.129 15.800 2025/04/14 03:15:00 0.125 15.800 2025/04/14 03:10:00 0.122 15.800 2025/04/14 03:05:00 0.124 15.800 2025/04/14 03:00:00 0.118 15.800 2025/04/14 02:55:00 0.132 15.800 2025/04/14 02:50:00 0.128 15.800 2025/04/14 02:45:00 0.123 15.800 2025/04/14 02:40:00 0.127 15.800 2025/04/14 02:35:00 0.123 15.800 2025/04/14 02:30:00 0.128 15.800 2025/04/14 02:25:00 0.136 15.800 2025/04/14 02:20:00 0.135 15.800 2025/04/14 02:15:00 0.135 15.800 2025/04/14 02:10:00 0.137 15.800 2025/04/14 02:05:00 0.129 15.800 2025/04/14 02:00:00 0.134 15.800 2025/04/14 01:55:00 0.143 15.800 2025/04/14 01:50:00 0.131 15.800 2025/04/14 01:45:00 0.143 15.800 2025/04/14 01:40:00 0.134 15.800 2025/04/14 01:35:00 0.129 15.800 2025/04/14 01:30:00 0.134 15.800 2025/04/14 01:25:00 0.134 15.800 2025/04/14 01:20:00 0.141 15.800 2025/04/14 01:15:00 0.138 15.800 2025/04/14 01:10:00 0.133 15.800 2025/04/14 01:05:00 0.148 15.800 2025/04/14 01:00:00 0.150 15.800 2025/04/14 00:55:00 0.138 15.800 2025/04/14 00:50:00 0.133 15.800 2025/04/14 00:45:00 0.135 15.800 2025/04/14 00:40:00 0.133 15.800 2025/04/14 00:35:00 0.135 15.800 2025/04/14 00:30:00 0.138 15.800 2025/04/14 00:25:00 0.138 15.800 2025/04/14 00:20:00 0.135 15.800 2025/04/14 00:15:00 0.132 15.800 2025/04/14 00:10:00 0.142 15.800 2025/04/14 00:05:00 0.140 15.800 2025/04/14 00:00:00 0.140 15.800 2025/04/13 23:55:00 0.134 15.800 2025/04/13 23:50:00 0.134 15.700 2025/04/13 23:45:00 0.132 15.700 2025/04/13 23:40:00 0.135 15.700 2025/04/13 23:35:00 0.137 15.700 2025/04/13 23:30:00 0.135 15.700 2025/04/13 23:25:00 0.130 15.700 2025/04/13 23:20:00 0.129 15.700 2025/04/13 23:15:00 0.129 15.700 2025/04/13 23:10:00 0.130 15.700 2025/04/13 23:05:00 0.133 15.700 2025/04/13 23:00:00 0.133 15.700 2025/04/13 22:55:00 0.129 15.700 2025/04/13 22:50:00 0.121 15.700 2025/04/13 22:45:00 0.125 15.700 2025/04/13 22:40:00 0.127 15.700 2025/04/13 22:35:00 0.125 15.700 2025/04/13 22:30:00 0.124 15.700 2025/04/13 22:25:00 0.125 15.700 2025/04/13 22:20:00 0.130 15.700 2025/04/13 22:15:00 0.125 15.700 2025/04/13 22:10:00 0.122 15.700 2025/04/13 22:05:00 0.134 15.700 2025/04/13 22:00:00 0.127 15.700 2025/04/13 21:55:00 0.123 15.700 2025/04/13 21:50:00 0.129 15.700 2025/04/13 21:45:00 0.132 15.700 2025/04/13 21:40:00 0.122 15.700 2025/04/13 21:35:00 0.124 15.700 2025/04/13 21:30:00 0.126 15.700 2025/04/13 21:25:00 0.121 15.700 2025/04/13 21:20:00 0.122 15.700 2025/04/13 21:15:00 0.126 15.700 2025/04/13 21:10:00 0.120 15.700 2025/04/13 21:05:00 0.114 15.700 2025/04/13 21:00:00 0.127 15.700 2025/04/13 20:55:00 0.115 15.700 2025/04/13 20:50:00 0.114 15.700 2025/04/13 20:45:00 0.126 15.700 2025/04/13 20:40:00 0.117 15.700 2025/04/13 20:35:00 0.112 15.700 2025/04/13 20:30:00 0.122 15.700 2025/04/13 20:25:00 0.116 15.700 2025/04/13 20:20:00 0.115 15.700 2025/04/13 20:15:00 0.109 15.700 2025/04/13 20:10:00 0.119 15.700 2025/04/13 20:05:00 0.108 15.700 2025/04/13 20:00:00 0.113 15.700 2025/04/13 19:55:00 0.112 15.700 2025/04/13 19:50:00 0.118 15.700 2025/04/13 19:45:00 0.119 15.700 2025/04/13 19:40:00 0.112 15.700 2025/04/13 19:35:00 0.124 15.700 2025/04/13 19:30:00 0.116 15.700 2025/04/13 19:25:00 0.119 15.700 2025/04/13 19:20:00 0.125 15.700 2025/04/13 19:15:00 0.112 15.700 2025/04/13 19:10:00 0.122 15.700 2025/04/13 19:05:00 0.122 15.700 2025/04/13 19:00:00 0.117 15.700 2025/04/13 18:55:00 0.121 15.700 2025/04/13 18:50:00 0.115 15.700 2025/04/13 18:45:00 0.115 15.700 2025/04/13 18:40:00 0.124 15.700 2025/04/13 18:35:00 0.122 15.700 2025/04/13 18:30:00 0.112 15.700 2025/04/13 18:25:00 0.112 15.700 2025/04/13 18:20:00 0.110 15.700 2025/04/13 18:15:00 0.113 15.700 2025/04/13 18:10:00 0.108 15.700 2025/04/13 18:05:00 0.108 15.700 2025/04/13 18:00:00 0.113 15.700 2025/04/13 17:55:00 0.105 15.700 2025/04/13 17:50:00 0.102 15.700 2025/04/13 17:45:00 0.111 15.700 2025/04/13 17:40:00 0.116 15.700 2025/04/13 17:35:00 0.107 15.700 2025/04/13 17:30:00 0.103 15.700 2025/04/13 17:25:00 0.107 15.700 2025/04/13 17:20:00 0.105 15.700 2025/04/13 17:15:00 0.099 15.700 2025/04/13 17:10:00 0.114 15.700 2025/04/13 17:05:00 0.108 15.700 2025/04/13 17:00:00 0.105 15.700 2025/04/13 16:55:00 0.102 15.700 2025/04/13 16:50:00 0.113 15.700 2025/04/13 16:45:00 0.107 15.700 2025/04/13 16:40:00 0.102 15.700 2025/04/13 16:35:00 0.107 15.700 2025/04/13 16:30:00 0.117 15.700 2025/04/13 16:25:00 0.107 15.700 2025/04/13 16:20:00 0.114 15.700 2025/04/13 16:15:00 0.109 15.700 2025/04/13 16:10:00 0.111 15.700 2025/04/13 16:05:00 0.110 15.700 2025/04/13 16:00:00 0.118 15.700 2025/04/13 15:55:00 0.114 15.700 2025/04/13 15:50:00 0.116 15.700 2025/04/13 15:45:00 0.112 15.700 2025/04/13 15:40:00 0.121 15.700 2025/04/13 15:35:00 0.107 15.700 2025/04/13 15:30:00 0.112 15.700 2025/04/13 15:25:00 0.109 15.700 2025/04/13 15:20:00 0.107 15.700 2025/04/13 15:15:00 0.100 15.700 2025/04/13 15:10:00 0.112 15.700 2025/04/13 15:05:00 0.114 15.700 2025/04/13 15:00:00 0.104 15.700 2025/04/13 14:55:00 0.111 15.700 2025/04/13 14:50:00 0.122 15.700 2025/04/13 14:45:00 0.117 15.700 2025/04/13 14:40:00 0.114 15.700 2025/04/13 14:35:00 0.113 15.700 2025/04/13 14:30:00 0.110 15.700 2025/04/13 14:25:00 0.110 15.700 2025/04/13 14:20:00 0.114 15.700 2025/04/13 14:15:00 0.114 15.700 2025/04/13 14:10:00 0.115 15.700 2025/04/13 14:05:00 0.125 15.700 2025/04/13 14:00:00 0.121 15.700 2025/04/13 13:55:00 0.111 15.700 2025/04/13 13:50:00 0.123 15.700 2025/04/13 13:45:00 0.117 15.700 2025/04/13 13:40:00 0.122 15.700 2025/04/13 13:35:00 0.118 15.700 2025/04/13 13:30:00 0.112 15.700 2025/04/13 13:25:00 0.110 15.700 2025/04/13 13:20:00 0.107 15.700 2025/04/13 13:15:00 0.105 15.700 2025/04/13 13:10:00 0.111 15.700 2025/04/13 13:05:00 0.114 15.700 2025/04/13 13:00:00 0.107 15.700 2025/04/13 12:55:00 0.110 15.700 2025/04/13 12:50:00 0.099 15.700 2025/04/13 12:45:00 0.108 15.700 2025/04/13 12:40:00 0.097 15.700 2025/04/13 12:35:00 0.104 15.700 2025/04/13 12:30:00 0.103 15.700 2025/04/13 12:25:00 0.098 15.700 2025/04/13 12:20:00 0.100 15.700 2025/04/13 12:15:00 0.098 15.700 2025/04/13 12:10:00 0.089 15.700 2025/04/13 12:05:00 0.087 15.700 2025/04/13 12:00:00 0.093 15.700 2025/04/13 11:55:00 0.085 15.700 2025/04/13 11:50:00 0.081 15.600 2025/04/13 11:45:00 0.080 15.600 2025/04/13 11:40:00 0.080 15.600 2025/04/13 11:35:00 0.076 15.600 2025/04/13 11:30:00 0.073 15.600 2025/04/13 11:25:00 0.082 15.600 2025/04/13 11:20:00 0.076 15.600 2025/04/13 11:15:00 0.069 15.600 2025/04/13 11:10:00 0.069 15.600 2025/04/13 11:05:00 0.069 15.600 2025/04/13 11:00:00 0.067 15.600 2025/04/13 10:55:00 0.080 15.600 2025/04/13 10:50:00 0.070 15.600 2025/04/13 10:45:00 0.069 15.600 2025/04/13 10:40:00 0.070 15.600 2025/04/13 10:35:00 0.069 15.600 2025/04/13 10:30:00 0.066 15.600 2025/04/13 10:25:00 0.066 15.600 2025/04/13 10:20:00 0.070 15.600 2025/04/13 10:15:00 0.075 15.600 2025/04/13 10:10:00 0.062 15.600 2025/04/13 10:05:00 0.063 15.600 2025/04/13 10:00:00 0.075 15.600 2025/04/13 09:55:00 0.065 15.600 2025/04/13 09:50:00 0.076 15.600 2025/04/13 09:45:00 0.068 15.600 2025/04/13 09:40:00 0.076 15.600 2025/04/13 09:35:00 0.071 15.600 2025/04/13 09:30:00 0.074 15.600 2025/04/13 09:25:00 0.075 15.600 2025/04/13 09:20:00 0.069 15.600 2025/04/13 09:15:00 0.083 15.600 2025/04/13 09:10:00 0.072 15.600 2025/04/13 09:05:00 0.080 15.600 2025/04/13 09:00:00 0.078 15.600 2025/04/13 08:55:00 0.079 15.600 2025/04/13 08:50:00 0.076 15.600 2025/04/13 08:45:00 0.086 15.600 2025/04/13 08:40:00 0.087 15.600 2025/04/13 08:35:00 0.091 15.600 2025/04/13 08:30:00 0.088 15.600 2025/04/13 08:25:00 0.088 15.600 2025/04/13 08:20:00 0.093 15.600 2025/04/13 08:15:00 0.087 15.600 2025/04/13 08:10:00 0.091 15.600 2025/04/13 08:05:00 0.088 15.600 2025/04/13 08:00:00 0.089 15.600 2025/04/13 07:55:00 0.093 15.600 2025/04/13 07:50:00 0.087 15.600 2025/04/13 07:45:00 0.088 15.600 2025/04/13 07:40:00 0.085 15.600 2025/04/13 07:35:00 0.090 15.600 2025/04/13 07:30:00 0.090 15.600 2025/04/13 07:25:00 0.091 15.600 2025/04/13 07:20:00 0.093 15.600 2025/04/13 07:15:00 0.094 15.600 2025/04/13 07:10:00 0.094 15.600 2025/04/13 07:05:00 0.096 15.600 2025/04/13 07:00:00 0.096 15.600 2025/04/13 06:55:00 0.094 15.600 2025/04/13 06:50:00 0.093 15.600 2025/04/13 06:45:00 0.096 15.600 2025/04/13 06:40:00 0.100 15.600 2025/04/13 06:35:00 0.099 15.600 2025/04/13 06:30:00 0.107 15.600 2025/04/13 06:25:00 0.099 15.600 2025/04/13 06:20:00 0.117 15.600 2025/04/13 06:15:00 0.111 15.600 2025/04/13 06:10:00 0.111 15.600 2025/04/13 06:05:00 0.113 15.600 2025/04/13 06:00:00 0.116 15.600 2025/04/13 05:55:00 0.120 15.600 2025/04/13 05:50:00 0.119 15.600 2025/04/13 05:45:00 0.121 15.600 2025/04/13 05:40:00 0.121 15.600 2025/04/13 05:35:00 0.122 15.600 2025/04/13 05:30:00 0.127 15.600 2025/04/13 05:25:00 0.127 15.600 2025/04/13 05:20:00 0.127 15.600 2025/04/13 05:15:00 0.133 15.600 2025/04/13 05:10:00 0.133 15.600 2025/04/13 05:05:00 0.134 15.600 2025/04/13 05:00:00 0.133 15.600 2025/04/13 04:55:00 0.128 15.600 2025/04/13 04:50:00 0.132 15.600 2025/04/13 04:45:00 0.130 15.600 2025/04/13 04:40:00 0.125 15.600 2025/04/13 04:35:00 0.126 15.600 2025/04/13 04:30:00 0.125 15.600 2025/04/13 04:25:00 0.125 15.600 2025/04/13 04:20:00 0.126 15.600 2025/04/13 04:15:00 0.128 15.600 2025/04/13 04:10:00 0.131 15.600 2025/04/13 04:05:00 0.131 15.600 2025/04/13 04:00:00 0.130 15.600 2025/04/13 03:55:00 0.135 15.600 2025/04/13 03:50:00 0.139 15.600 2025/04/13 03:45:00 0.137 15.600 2025/04/13 03:40:00 0.139 15.600 2025/04/13 03:35:00 0.142 15.600 2025/04/13 03:30:00 0.143 15.600 2025/04/13 03:25:00 0.146 15.600 2025/04/13 03:20:00 0.147 15.600 2025/04/13 03:15:00 0.151 15.600 2025/04/13 03:10:00 0.148 15.600 2025/04/13 03:05:00 0.150 15.600 2025/04/13 03:00:00 0.151 15.600 2025/04/13 02:55:00 0.153 15.600 2025/04/13 02:50:00 0.158 15.600 2025/04/13 02:45:00 0.155 15.600 2025/04/13 02:40:00 0.153 15.600 2025/04/13 02:35:00 0.143 15.600 2025/04/13 02:30:00 0.145 15.600 2025/04/13 02:25:00 0.152 15.600 2025/04/13 02:20:00 0.144 15.600 2025/04/13 02:15:00 0.141 15.600 2025/04/13 02:10:00 0.143 15.600 2025/04/13 02:05:00 0.155 15.600 2025/04/13 02:00:00 0.145 15.600 2025/04/13 01:55:00 0.154 15.600 2025/04/13 01:50:00 0.154 15.600 2025/04/13 01:45:00 0.156 15.600 2025/04/13 01:40:00 0.149 15.600 2025/04/13 01:35:00 0.162 15.600 2025/04/13 01:30:00 0.151 15.600 2025/04/13 01:25:00 0.159 15.600 2025/04/13 01:20:00 0.155 15.600 2025/04/13 01:15:00 0.163 15.600 2025/04/13 01:10:00 0.151 15.600 2025/04/13 01:05:00 0.155 15.600 2025/04/13 01:00:00 0.158 15.600 2025/04/13 00:55:00 0.167 15.600 2025/04/13 00:50:00 0.159 15.600 2025/04/13 00:45:00 0.158 15.600 2025/04/13 00:40:00 0.158 15.600 2025/04/13 00:35:00 0.168 15.600 2025/04/13 00:30:00 0.166 15.600 2025/04/13 00:25:00 0.162 15.600 2025/04/13 00:20:00 0.155 15.600 2025/04/13 00:15:00 0.157 15.600 2025/04/13 00:10:00 0.158 15.600 2025/04/13 00:05:00 0.154 15.600 2025/04/13 00:00:00 0.161 15.600 2025/04/12 23:55:00 0.164 15.600 2025/04/12 23:50:00 0.165 15.600 2025/04/12 23:45:00 0.159 15.500 2025/04/12 23:40:00 0.163 15.500 2025/04/12 23:35:00 0.160 15.500 2025/04/12 23:30:00 0.167 15.500 2025/04/12 23:25:00 0.161 15.500 2025/04/12 23:20:00 0.155 15.500 2025/04/12 23:15:00 0.172 15.500 2025/04/12 23:10:00 0.155 15.500 2025/04/12 23:05:00 0.154 15.500 2025/04/12 23:00:00 0.165 15.500 2025/04/12 22:55:00 0.165 15.500 2025/04/12 22:50:00 0.157 15.500 2025/04/12 22:45:00 0.161 15.500 2025/04/12 22:40:00 0.163 15.500 2025/04/12 22:35:00 0.166 15.500 2025/04/12 22:30:00 0.166 15.500 2025/04/12 22:25:00 0.168 15.500 2025/04/12 22:20:00 0.162 15.500 2025/04/12 22:15:00 0.170 15.500 2025/04/12 22:10:00 0.164 15.500 2025/04/12 22:05:00 0.171 15.500 2025/04/12 22:00:00 0.170 15.500 2025/04/12 21:55:00 0.161 15.500 2025/04/12 21:50:00 0.162 15.500 2025/04/12 21:45:00 0.166 15.500 2025/04/12 21:40:00 0.160 15.500 2025/04/12 21:35:00 0.168 15.500 2025/04/12 21:30:00 0.164 15.500 2025/04/12 21:25:00 0.174 15.500 2025/04/12 21:20:00 0.162 15.500 2025/04/12 21:15:00 0.173 15.500 2025/04/12 21:10:00 0.163 15.500 2025/04/12 21:05:00 0.156 15.500 2025/04/12 21:00:00 0.165 15.500 2025/04/12 20:55:00 0.169 15.500 2025/04/12 20:50:00 0.171 15.500 2025/04/12 20:45:00 0.156 15.500 2025/04/12 20:40:00 0.170 15.500 2025/04/12 20:35:00 0.160 15.500 2025/04/12 20:30:00 0.151 15.500 2025/04/12 20:25:00 0.161 15.500 2025/04/12 20:20:00 0.152 15.500 2025/04/12 20:15:00 0.158 15.500 2025/04/12 20:10:00 0.154 15.500 2025/04/12 20:05:00 0.157 15.500 2025/04/12 20:00:00 0.142 15.500 2025/04/12 19:55:00 0.146 15.500 2025/04/12 19:50:00 0.147 15.500 2025/04/12 19:45:00 0.144 15.500 2025/04/12 19:40:00 0.146 15.500 2025/04/12 19:35:00 0.147 15.500 2025/04/12 19:30:00 0.151 15.500 2025/04/12 19:25:00 0.149 15.500 2025/04/12 19:20:00 0.147 15.500 2025/04/12 19:15:00 0.156 15.500 2025/04/12 19:10:00 0.157 15.500 2025/04/12 19:05:00 0.164 15.500 2025/04/12 19:00:00 0.156 15.500 2025/04/12 18:55:00 0.150 15.500 2025/04/12 18:50:00 0.163 15.500 2025/04/12 18:45:00 0.148 15.500 2025/04/12 18:40:00 0.146 15.500 2025/04/12 18:35:00 0.159 15.500 2025/04/12 18:30:00 0.151 15.500 2025/04/12 18:25:00 0.144 15.500 2025/04/12 18:20:00 0.145 15.500 2025/04/12 18:15:00 0.152 15.500 2025/04/12 18:10:00 0.136 15.500 2025/04/12 18:05:00 0.138 15.500 2025/04/12 18:00:00 0.134 15.500 2025/04/12 17:55:00 0.142 15.500 2025/04/12 17:50:00 0.136 15.500 2025/04/12 17:45:00 0.142 15.500 2025/04/12 17:40:00 0.148 15.500 2025/04/12 17:35:00 0.137 15.500 2025/04/12 17:30:00 0.140 15.500 2025/04/12 17:25:00 0.142 15.500 2025/04/12 17:20:00 0.137 15.500 2025/04/12 17:15:00 0.142 15.500 2025/04/12 17:10:00 0.129 15.500 2025/04/12 17:05:00 0.141 15.500 2025/04/12 17:00:00 0.125 15.500 2025/04/12 16:55:00 0.135 15.500 2025/04/12 16:50:00 0.120 15.500 2025/04/12 16:45:00 0.119 15.500 2025/04/12 16:40:00 0.114 15.500 2025/04/12 16:35:00 0.124 15.500 2025/04/12 16:30:00 0.121 15.500 2025/04/12 16:25:00 0.113 15.500 2025/04/12 16:20:00 0.121 15.500 2025/04/12 16:15:00 0.125 15.500 2025/04/12 16:10:00 0.118 15.500 2025/04/12 16:05:00 0.115 15.500 2025/04/12 16:00:00 0.108 15.500 2025/04/12 15:55:00 0.105 15.500 2025/04/12 15:50:00 0.110 15.500 2025/04/12 15:45:00 0.106 15.500 2025/04/12 15:40:00 0.107 15.500 2025/04/12 15:35:00 0.102 15.500 2025/04/12 15:30:00 0.115 15.500 2025/04/12 15:25:00 0.110 15.500 2025/04/12 15:20:00 0.108 15.500 2025/04/12 15:15:00 0.099 15.500 2025/04/12 15:10:00 0.103 15.500 2025/04/12 15:05:00 0.103 15.500 2025/04/12 15:00:00 0.105 15.500 2025/04/12 14:55:00 0.103 15.500 2025/04/12 14:50:00 0.103 15.500 2025/04/12 14:45:00 0.105 15.500 2025/04/12 14:40:00 0.099 15.500 2025/04/12 14:35:00 0.100 15.500 2025/04/12 14:30:00 0.102 15.500 2025/04/12 14:25:00 0.106 15.500 2025/04/12 14:20:00 0.103 15.500 2025/04/12 14:15:00 0.108 15.500 2025/04/12 14:10:00 0.104 15.500 2025/04/12 14:05:00 0.102 15.500 2025/04/12 14:00:00 0.110 15.500 2025/04/12 13:55:00 0.111 15.500 2025/04/12 13:50:00 0.106 15.500 2025/04/12 13:45:00 0.104 15.500 2025/04/12 13:40:00 0.110 15.500 2025/04/12 13:35:00 0.116 15.500 2025/04/12 13:30:00 0.105 15.500 2025/04/12 13:25:00 0.104 15.500 2025/04/12 13:20:00 0.106 15.500 2025/04/12 13:15:00 0.102 15.500 2025/04/12 13:10:00 0.104 15.500 2025/04/12 13:05:00 0.111 15.500 2025/04/12 13:00:00 0.105 15.500 2025/04/12 12:55:00 0.103 15.500 2025/04/12 12:50:00 0.107 15.500 2025/04/12 12:45:00 0.102 15.500 2025/04/12 12:40:00 0.101 15.500 2025/04/12 12:35:00 0.102 15.500 2025/04/12 12:30:00 0.113 15.500 2025/04/12 12:25:00 0.102 15.500 2025/04/12 12:20:00 0.106 15.500 2025/04/12 12:15:00 0.099 15.500 2025/04/12 12:10:00 0.104 15.500 2025/04/12 12:05:00 0.102 15.500 2025/04/12 12:00:00 0.106 15.500 2025/04/12 11:55:00 0.113 15.500 2025/04/12 11:50:00 0.106 15.500 2025/04/12 11:45:00 0.103 15.500 2025/04/12 11:40:00 0.110 15.500 2025/04/12 11:35:00 0.103 15.400 2025/04/12 11:30:00 0.100 15.400 2025/04/12 11:25:00 0.098 15.400 2025/04/12 11:20:00 0.101 15.400 2025/04/12 11:15:00 0.106 15.400 2025/04/12 11:10:00 0.110 15.400 2025/04/12 11:05:00 0.105 15.400 2025/04/12 11:00:00 0.100 15.400 2025/04/12 10:55:00 0.101 15.400 2025/04/12 10:50:00 0.101 15.400 2025/04/12 10:45:00 0.099 15.400 2025/04/12 10:40:00 0.102 15.400 2025/04/12 10:35:00 0.101 15.400 2025/04/12 10:30:00 0.103 15.400 2025/04/12 10:25:00 0.113 15.400 2025/04/12 10:20:00 0.106 15.400 2025/04/12 10:15:00 0.101 15.400 2025/04/12 10:10:00 0.107 15.400 2025/04/12 10:05:00 0.101 15.400 2025/04/12 10:00:00 0.104 15.400 2025/04/12 09:55:00 0.110 15.400 2025/04/12 09:50:00 0.117 15.400 2025/04/12 09:45:00 0.109 15.400 2025/04/12 09:40:00 0.107 15.400 2025/04/12 09:35:00 0.106 15.400 2025/04/12 09:30:00 0.106 15.400 2025/04/12 09:25:00 0.116 15.400 2025/04/12 09:20:00 0.111 15.400 2025/04/12 09:15:00 0.116 15.400 2025/04/12 09:10:00 0.117 15.400 2025/04/12 09:05:00 0.117 15.400 2025/04/12 09:00:00 0.123 15.400 2025/04/12 08:55:00 0.127 15.400 2025/04/12 08:50:00 0.117 15.400 2025/04/12 08:45:00 0.116 15.400 2025/04/12 08:40:00 0.116 15.400 2025/04/12 08:35:00 0.121 15.400 2025/04/12 08:30:00 0.123 15.400 2025/04/12 08:25:00 0.124 15.400 2025/04/12 08:20:00 0.118 15.400 2025/04/12 08:15:00 0.122 15.400 2025/04/12 08:10:00 0.118 15.400 2025/04/12 08:05:00 0.128 15.400 2025/04/12 08:00:00 0.118 15.400 2025/04/12 07:55:00 0.129 15.400 2025/04/12 07:50:00 0.120 15.400 2025/04/12 07:45:00 0.126 15.400 2025/04/12 07:40:00 0.129 15.400 2025/04/12 07:35:00 0.133 15.400 2025/04/12 07:30:00 0.122 15.400 2025/04/12 07:25:00 0.125 15.400 2025/04/12 07:20:00 0.118 15.400 2025/04/12 07:15:00 0.121 15.400 2025/04/12 07:10:00 0.121 15.400 2025/04/12 07:05:00 0.117 15.400 2025/04/12 07:00:00 0.124 15.400 2025/04/12 06:55:00 0.125 15.400 2025/04/12 06:50:00 0.121 15.400 2025/04/12 06:45:00 0.120 15.400 2025/04/12 06:40:00 0.116 15.400 2025/04/12 06:35:00 0.126 15.400 2025/04/12 06:30:00 0.127 15.400 2025/04/12 06:25:00 0.122 15.400 2025/04/12 06:20:00 0.126 15.400 2025/04/12 06:15:00 0.123 15.400 2025/04/12 06:10:00 0.130 15.400 2025/04/12 06:05:00 0.124 15.400 2025/04/12 06:00:00 0.121 15.400 2025/04/12 05:55:00 0.118 15.400 2025/04/12 05:50:00 0.124 15.400 2025/04/12 05:45:00 0.117 15.400 2025/04/12 05:40:00 0.120 15.400 2025/04/12 05:35:00 0.116 15.400 2025/04/12 05:30:00 0.124 15.400 2025/04/12 05:25:00 0.119 15.400 2025/04/12 05:20:00 0.126 15.400 2025/04/12 05:15:00 0.117 15.400 2025/04/12 05:10:00 0.123 15.400 2025/04/12 05:05:00 0.120 15.400 2025/04/12 05:00:00 0.115 15.400 2025/04/12 04:55:00 0.119 15.400 2025/04/12 04:50:00 0.118 15.400 2025/04/12 04:45:00 0.114 15.400 2025/04/12 04:40:00 0.115 15.400 2025/04/12 04:35:00 0.116 15.400 2025/04/12 04:30:00 0.117 15.400 2025/04/12 04:25:00 0.112 15.400 2025/04/12 04:20:00 0.121 15.400 2025/04/12 04:15:00 0.110 15.400 2025/04/12 04:10:00 0.119 15.400 2025/04/12 04:05:00 0.123 15.400 2025/04/12 04:00:00 0.111 15.400 2025/04/12 03:55:00 0.114 15.400 2025/04/12 03:50:00 0.111 15.400 2025/04/12 03:45:00 0.108 15.400 2025/04/12 03:40:00 0.120 15.400 2025/04/12 03:35:00 0.110 15.400 2025/04/12 03:30:00 0.113 15.400 2025/04/12 03:25:00 0.119 15.400 2025/04/12 03:20:00 0.117 15.400 2025/04/12 03:15:00 0.109 15.400 2025/04/12 03:10:00 0.113 15.400 2025/04/12 03:05:00 0.115 15.400 2025/04/12 03:00:00 0.121 15.400 2025/04/12 02:55:00 0.117 15.400 2025/04/12 02:50:00 0.115 15.400 2025/04/12 02:45:00 0.117 15.400 2025/04/12 02:40:00 0.116 15.400 2025/04/12 02:35:00 0.121 15.400 2025/04/12 02:30:00 0.112 15.400 2025/04/12 02:25:00 0.117 15.400 2025/04/12 02:20:00 0.121 15.400 2025/04/12 02:15:00 0.117 15.400 2025/04/12 02:10:00 0.121 15.400 2025/04/12 02:05:00 0.118 15.400 2025/04/12 02:00:00 0.124 15.400 2025/04/12 01:55:00 0.113 15.400 2025/04/12 01:50:00 0.115 15.400 2025/04/12 01:45:00 0.123 15.400 2025/04/12 01:40:00 0.128 15.400 2025/04/12 01:35:00 0.118 15.400 2025/04/12 01:30:00 0.109 15.400 2025/04/12 01:25:00 0.117 15.400 2025/04/12 01:20:00 0.119 15.400 2025/04/12 01:15:00 0.115 15.400 2025/04/12 01:10:00 0.115 15.400 2025/04/12 01:05:00 0.116 15.400 2025/04/12 01:00:00 0.118 15.400 2025/04/12 00:55:00 0.114 15.400 2025/04/12 00:50:00 0.116 15.400 2025/04/12 00:45:00 0.119 15.400 2025/04/12 00:40:00 0.123 15.400 2025/04/12 00:35:00 0.126 15.400 2025/04/12 00:30:00 0.115 15.400 2025/04/12 00:25:00 0.120 15.400 2025/04/12 00:20:00 0.121 15.400 2025/04/12 00:15:00 0.128 15.400 2025/04/12 00:10:00 0.127 15.400 2025/04/12 00:05:00 0.126 15.400 2025/04/12 00:00:00 0.126 15.400 2025/04/11 23:55:00 0.126 15.400 2025/04/11 23:50:00 0.126 15.400 2025/04/11 23:45:00 0.126 15.400 2025/04/11 23:40:00 0.131 15.400 2025/04/11 23:35:00 0.126 15.400 2025/04/11 23:30:00 0.130 15.400 2025/04/11 23:25:00 0.129 15.400 2025/04/11 23:20:00 0.141 15.300 2025/04/11 23:15:00 0.133 15.300 2025/04/11 23:10:00 0.141 15.300 2025/04/11 23:05:00 0.137 15.300 2025/04/11 23:00:00 0.145 15.300 2025/04/11 22:55:00 0.131 15.300 2025/04/11 22:50:00 0.134 15.300 2025/04/11 22:45:00 0.139 15.300 2025/04/11 22:40:00 0.134 15.300 2025/04/11 22:35:00 0.135 15.300 2025/04/11 22:30:00 0.136 15.300 2025/04/11 22:25:00 0.132 15.300 2025/04/11 22:20:00 0.135 15.300 2025/04/11 22:15:00 0.132 15.300 2025/04/11 22:10:00 0.136 15.300 2025/04/11 22:05:00 0.127 15.300 2025/04/11 22:00:00 0.126 15.300 2025/04/11 21:55:00 0.124 15.300 2025/04/11 21:50:00 0.120 15.300 2025/04/11 21:45:00 0.120 15.300 2025/04/11 21:40:00 0.118 15.300 2025/04/11 21:35:00 0.124 15.300 2025/04/11 21:30:00 0.114 15.300 2025/04/11 21:25:00 0.109 15.300 2025/04/11 21:20:00 0.122 15.300 2025/04/11 21:15:00 0.106 15.300 2025/04/11 21:10:00 0.107 15.300 2025/04/11 21:05:00 0.111 15.300 2025/04/11 21:00:00 0.111 15.300 2025/04/11 20:55:00 0.105 15.300 2025/04/11 20:50:00 0.115 15.300 2025/04/11 20:45:00 0.112 15.300 2025/04/11 20:40:00 0.110 15.300 2025/04/11 20:35:00 0.113 15.300 2025/04/11 20:30:00 0.117 15.300 2025/04/11 20:25:00 0.122 15.300 2025/04/11 20:20:00 0.111 15.300 2025/04/11 20:15:00 0.111 15.300 2025/04/11 20:10:00 0.117 15.300 2025/04/11 20:05:00 0.119 15.300 2025/04/11 20:00:00 0.112 15.300 2025/04/11 19:55:00 0.112 15.300 2025/04/11 19:50:00 0.112 15.300 2025/04/11 19:45:00 0.123 15.300 2025/04/11 19:40:00 0.111 15.300 2025/04/11 19:35:00 0.115 15.300 2025/04/11 19:30:00 0.116 15.300 2025/04/11 19:25:00 0.122 15.300 2025/04/11 19:20:00 0.124 15.300 2025/04/11 19:15:00 0.117 15.300 2025/04/11 19:10:00 0.120 15.300 2025/04/11 19:05:00 0.120 15.300 2025/04/11 19:00:00 0.113 15.300 2025/04/11 18:55:00 0.116 15.300 2025/04/11 18:50:00 0.114 15.300 2025/04/11 18:45:00 0.129 15.300 2025/04/11 18:40:00 0.119 15.300 2025/04/11 18:35:00 0.124 15.300 2025/04/11 18:30:00 0.116 15.300 2025/04/11 18:25:00 0.129 15.300 2025/04/11 18:20:00 0.121 15.300 2025/04/11 18:15:00 0.116 15.300 2025/04/11 18:10:00 0.117 15.300 2025/04/11 18:05:00 0.116 15.300 2025/04/11 18:00:00 0.119 15.300 2025/04/11 17:55:00 0.120 15.300 2025/04/11 17:50:00 0.117 15.300 2025/04/11 17:45:00 0.119 15.300 2025/04/11 17:40:00 0.117 15.300 2025/04/11 17:35:00 0.123 15.300 2025/04/11 17:30:00 0.123 15.300 2025/04/11 17:25:00 0.125 15.300 2025/04/11 17:20:00 0.117 15.300 2025/04/11 17:15:00 0.118 15.300 2025/04/11 17:10:00 0.117 15.300 2025/04/11 17:05:00 0.118 15.300 2025/04/11 17:00:00 0.111 15.300 2025/04/11 16:55:00 0.128 15.300 2025/04/11 16:50:00 0.112 15.300 2025/04/11 16:45:00 0.109 15.300 2025/04/11 16:40:00 0.128 15.300 2025/04/11 16:35:00 0.130 15.300 2025/04/11 16:30:00 0.116 15.300 2025/04/11 16:25:00 0.116 15.300 2025/04/11 16:20:00 0.131 15.300 2025/04/11 16:15:00 0.125 15.300 2025/04/11 16:10:00 0.123 15.300 2025/04/11 16:05:00 0.124 15.300 2025/04/11 16:00:00 0.137 15.300 2025/04/11 15:55:00 0.129 15.300 2025/04/11 15:50:00 0.127 15.300 2025/04/11 15:45:00 0.136 15.300 2025/04/11 15:40:00 0.123 15.300 2025/04/11 15:35:00 0.122 15.300 2025/04/11 15:30:00 0.134 15.300 2025/04/11 15:25:00 0.129 15.300 2025/04/11 15:20:00 0.124 15.300 2025/04/11 15:15:00 0.128 15.300 2025/04/11 15:10:00 0.118 15.300 2025/04/11 15:05:00 0.116 15.300 2025/04/11 15:00:00 0.122 15.300 2025/04/11 14:55:00 0.114 15.300 2025/04/11 14:50:00 0.123 15.300 2025/04/11 14:45:00 0.116 15.300 2025/04/11 14:40:00 0.112 15.300 2025/04/11 14:35:00 0.107 15.300 2025/04/11 14:30:00 0.113 15.300 2025/04/11 14:25:00 0.107 15.300 2025/04/11 14:20:00 0.109 15.300 2025/04/11 14:15:00 0.105 15.300 2025/04/11 14:10:00 0.104 15.300 2025/04/11 14:05:00 0.104 15.300 2025/04/11 14:00:00 0.114 15.300 2025/04/11 13:55:00 0.103 15.300 2025/04/11 13:50:00 0.102 15.300 2025/04/11 13:45:00 0.102 15.300 2025/04/11 13:40:00 0.103 15.300 2025/04/11 13:35:00 0.101 15.300 2025/04/11 13:30:00 0.094 15.300 2025/04/11 13:25:00 0.099 15.300 2025/04/11 13:20:00 0.100 15.300 2025/04/11 13:15:00 0.095 15.300 2025/04/11 13:10:00 0.098 15.300 2025/04/11 13:05:00 0.101 15.300 2025/04/11 13:00:00 0.097 15.300 2025/04/11 12:55:00 0.094 15.300 2025/04/11 12:50:00 0.094 15.300 2025/04/11 12:45:00 0.095 15.300 2025/04/11 12:40:00 0.108 15.300 2025/04/11 12:35:00 0.098 15.300 2025/04/11 12:30:00 0.098 15.300 2025/04/11 12:25:00 0.090 15.300 2025/04/11 12:20:00 0.088 15.300 2025/04/11 12:15:00 0.091 15.300 2025/04/11 12:10:00 0.101 15.300 2025/04/11 12:05:00 0.092 15.300 2025/04/11 12:00:00 0.092 15.300 2025/04/11 11:55:00 0.088 15.300 2025/04/11 11:50:00 0.089 15.300 2025/04/11 11:45:00 0.087 15.300 2025/04/11 11:40:00 0.085 15.300 2025/04/11 11:35:00 0.097 15.300 2025/04/11 11:30:00 0.085 15.300 2025/04/11 11:25:00 0.083 15.300 2025/04/11 11:20:00 0.096 15.300 2025/04/11 11:15:00 0.081 15.300 2025/04/11 11:10:00 0.082 15.300 2025/04/11 11:05:00 0.082 15.300 2025/04/11 11:00:00 0.080 15.200 2025/04/11 10:55:00 0.081 15.200 2025/04/11 10:50:00 0.085 15.200 2025/04/11 10:45:00 0.090 15.200 2025/04/11 10:40:00 0.079 15.200 2025/04/11 10:35:00 0.078 15.200 2025/04/11 10:30:00 0.075 15.200 2025/04/11 10:25:00 0.082 15.200 2025/04/11 10:20:00 0.080 15.200 2025/04/11 10:15:00 0.088 15.200 2025/04/11 10:10:00 0.088 15.200 2025/04/11 10:05:00 0.080 15.200 2025/04/11 10:00:00 0.073 15.200 2025/04/11 09:55:00 0.077 15.200 2025/04/11 09:50:00 0.080 15.200 2025/04/11 09:45:00 0.077 15.200 2025/04/11 09:40:00 0.078 15.200 2025/04/11 09:35:00 0.090 15.200 2025/04/11 09:30:00 0.073 15.200 2025/04/11 09:25:00 0.078 15.200 2025/04/11 09:20:00 0.072 15.200 2025/04/11 09:15:00 0.075 15.200 2025/04/11 09:10:00 0.070 15.200 2025/04/11 09:05:00 0.066 15.200 2025/04/11 09:00:00 0.071 15.200 2025/04/11 08:55:00 0.077 15.200 2025/04/11 08:50:00 0.087 15.200 2025/04/11 08:45:00 0.076 15.200 2025/04/11 08:40:00 0.075 15.200 2025/04/11 08:35:00 0.076 15.200 2025/04/11 08:30:00 0.077 15.200 2025/04/11 08:25:00 0.087 15.200 2025/04/11 08:20:00 0.087 15.200 2025/04/11 08:15:00 0.086 15.200 2025/04/11 08:10:00 0.079 15.200 2025/04/11 08:05:00 0.080 15.200 2025/04/11 08:00:00 0.080 15.200 2025/04/11 07:55:00 0.077 15.200 2025/04/11 07:50:00 0.080 15.200 2025/04/11 07:45:00 0.089 15.200 2025/04/11 07:40:00 0.087 15.200 2025/04/11 07:35:00 0.083 15.200 2025/04/11 07:30:00 0.091 15.200 2025/04/11 07:25:00 0.085 15.200 2025/04/11 07:20:00 0.097 15.200 2025/04/11 07:15:00 0.086 15.200 2025/04/11 07:10:00 0.085 15.200 2025/04/11 07:05:00 0.085 15.200 2025/04/11 07:00:00 0.099 15.200 2025/04/11 06:55:00 0.089 15.200 2025/04/11 06:50:00 0.090 15.200 2025/04/11 06:45:00 0.087 15.200 2025/04/11 06:40:00 0.086 15.200 2025/04/11 06:35:00 0.091 15.200 2025/04/11 06:30:00 0.094 15.200 2025/04/11 06:25:00 0.090 15.200 2025/04/11 06:20:00 0.092 15.200 2025/04/11 06:15:00 0.095 15.200 2025/04/11 06:10:00 0.107 15.200 2025/04/11 06:05:00 0.098 15.200 2025/04/11 06:00:00 0.098 15.200 2025/04/11 05:55:00 0.099 15.200 2025/04/11 05:50:00 0.094 15.200 2025/04/11 05:45:00 0.099 15.200 2025/04/11 05:40:00 0.095 15.200 2025/04/11 05:35:00 0.098 15.200 2025/04/11 05:30:00 0.102 15.200 2025/04/11 05:25:00 0.103 15.200 2025/04/11 05:20:00 0.097 15.200 2025/04/11 05:15:00 0.112 15.200 2025/04/11 05:10:00 0.103 15.200 2025/04/11 05:05:00 0.100 15.200 2025/04/11 05:00:00 0.107 15.200 2025/04/11 04:55:00 0.104 15.200 2025/04/11 04:50:00 0.101 15.200 2025/04/11 04:45:00 0.101 15.200 2025/04/11 04:40:00 0.105 15.200 2025/04/11 04:35:00 0.114 15.200 2025/04/11 04:30:00 0.110 15.200 2025/04/11 04:25:00 0.113 15.200 2025/04/11 04:20:00 0.105 15.200 2025/04/11 04:15:00 0.101 15.200 2025/04/11 04:10:00 0.108 15.200 2025/04/11 04:05:00 0.103 15.200 2025/04/11 04:00:00 0.101 15.200 2025/04/11 03:55:00 0.105 15.200 2025/04/11 03:50:00 0.101 15.200 2025/04/11 03:45:00 0.099 15.200 2025/04/11 03:40:00 0.111 15.200 2025/04/11 03:35:00 0.102 15.200 2025/04/11 03:30:00 0.110 15.200 2025/04/11 03:25:00 0.102 15.200 2025/04/11 03:20:00 0.101 15.200 2025/04/11 03:15:00 0.109 15.200 2025/04/11 03:10:00 0.110 15.200 2025/04/11 03:05:00 0.107 15.200 2025/04/11 03:00:00 0.102 15.200 2025/04/11 02:55:00 0.107 15.200 2025/04/11 02:50:00 0.105 15.200 2025/04/11 02:45:00 0.114 15.200 2025/04/11 02:40:00 0.099 15.200 2025/04/11 02:35:00 0.099 15.200 2025/04/11 02:30:00 0.102 15.200 2025/04/11 02:25:00 0.112 15.200 2025/04/11 02:20:00 0.114 15.200 2025/04/11 02:15:00 0.105 15.200 2025/04/11 02:10:00 0.100 15.200 2025/04/11 02:05:00 0.113 15.200 2025/04/11 02:00:00 0.108 15.200 2025/04/11 01:55:00 0.105 15.200 2025/04/11 01:50:00 0.114 15.200 2025/04/11 01:45:00 0.115 15.200 2025/04/11 01:40:00 0.107 15.200 2025/04/11 01:35:00 0.121 15.200 2025/04/11 01:30:00 0.114 15.200 2025/04/11 01:25:00 0.105 15.200 2025/04/11 01:20:00 0.109 15.200 2025/04/11 01:15:00 0.114 15.200 2025/04/11 01:10:00 0.105 15.200 2025/04/11 01:05:00 0.113 15.200 2025/04/11 01:00:00 0.108 15.200 2025/04/11 00:55:00 0.118 15.200 2025/04/11 00:50:00 0.117 15.200 2025/04/11 00:45:00 0.117 15.200 2025/04/11 00:40:00 0.115 15.200 2025/04/11 00:35:00 0.114 15.200 2025/04/11 00:30:00 0.097 15.200 2025/04/11 00:25:00 0.105 15.200 2025/04/11 00:20:00 0.100 15.200 2025/04/11 00:15:00 0.118 15.200 2025/04/11 00:10:00 0.108 15.200 2025/04/11 00:05:00 0.106 15.200 2025/04/11 00:00:00 0.108 15.200 2025/04/10 23:55:00 0.099 15.200 2025/04/10 23:50:00 0.108 15.200 2025/04/10 23:45:00 0.105 15.200 2025/04/10 23:40:00 0.100 15.200 2025/04/10 23:35:00 0.103 15.200 2025/04/10 23:30:00 0.101 15.200 2025/04/10 23:25:00 0.097 15.200 2025/04/10 23:20:00 0.109 15.200 2025/04/10 23:15:00 0.100 15.200 2025/04/10 23:10:00 0.100 15.200 2025/04/10 23:05:00 0.099 15.200 2025/04/10 23:00:00 0.114 15.200 2025/04/10 22:55:00 0.103 15.200 2025/04/10 22:50:00 0.111 15.200 2025/04/10 22:45:00 0.105 15.200 2025/04/10 22:40:00 0.097 15.200 2025/04/10 22:35:00 0.093 15.100 2025/04/10 22:30:00 0.098 15.100 2025/04/10 22:25:00 0.108 15.100 2025/04/10 22:20:00 0.092 15.100 2025/04/10 22:15:00 0.102 15.100 2025/04/10 22:10:00 0.092 15.100 2025/04/10 22:05:00 0.100 15.100 2025/04/10 22:00:00 0.101 15.100 2025/04/10 21:55:00 0.102 15.100 2025/04/10 21:50:00 0.099 15.100 2025/04/10 21:45:00 0.095 15.100 2025/04/10 21:40:00 0.101 15.100 2025/04/10 21:35:00 0.092 15.100 2025/04/10 21:30:00 0.102 15.100 2025/04/10 21:25:00 0.094 15.100 2025/04/10 21:20:00 0.099 15.100 2025/04/10 21:15:00 0.093 15.100 2025/04/10 21:10:00 0.099 15.100 2025/04/10 21:05:00 0.090 15.100 2025/04/10 21:00:00 0.090 15.100 2025/04/10 20:55:00 0.101 15.100 2025/04/10 20:50:00 0.089 15.100 2025/04/10 20:45:00 0.086 15.100 2025/04/10 20:40:00 0.084 15.100 2025/04/10 20:35:00 0.095 15.100 2025/04/10 20:30:00 0.091 15.100 2025/04/10 20:25:00 0.099 15.100 2025/04/10 20:20:00 0.097 15.100 2025/04/10 20:15:00 0.089 15.100 2025/04/10 20:10:00 0.099 15.100 2025/04/10 20:05:00 0.105 15.100 2025/04/10 20:00:00 0.101 15.100 2025/04/10 19:55:00 0.099 15.100 2025/04/10 19:50:00 0.093 15.100 2025/04/10 19:45:00 0.094 15.100 2025/04/10 19:40:00 0.096 15.100 2025/04/10 19:35:00 0.100 15.100 2025/04/10 19:30:00 0.103 15.100 2025/04/10 19:25:00 0.098 15.100 2025/04/10 19:20:00 0.103 15.100 2025/04/10 19:15:00 0.099 15.100 2025/04/10 19:10:00 0.092 15.100 2025/04/10 19:05:00 0.101 15.100 2025/04/10 19:00:00 0.091 15.100 2025/04/10 18:55:00 0.091 15.100 2025/04/10 18:50:00 0.094 15.100 2025/04/10 18:45:00 0.088 15.100 2025/04/10 18:40:00 0.087 15.100 2025/04/10 18:35:00 0.094 15.100 2025/04/10 18:30:00 0.096 15.100 2025/04/10 18:25:00 0.094 15.100 2025/04/10 18:20:00 0.109 15.100 2025/04/10 18:15:00 0.097 15.100 2025/04/10 18:10:00 0.112 15.100 2025/04/10 18:05:00 0.112 15.100 2025/04/10 18:00:00 0.103 15.100 2025/04/10 17:55:00 0.099 15.100 2025/04/10 17:50:00 0.102 15.100 2025/04/10 17:45:00 0.106 15.100 2025/04/10 17:40:00 0.101 15.100 2025/04/10 17:35:00 0.096 15.100 2025/04/10 17:30:00 0.095 15.100 2025/04/10 17:25:00 0.094 15.100 2025/04/10 17:20:00 0.102 15.100 2025/04/10 17:15:00 0.114 15.100 2025/04/10 17:10:00 0.105 15.100 2025/04/10 17:05:00 0.105 15.100 2025/04/10 17:00:00 0.103 15.100 2025/04/10 16:55:00 0.108 15.100 2025/04/10 16:50:00 0.096 15.100 2025/04/10 16:45:00 0.111 15.100 2025/04/10 16:40:00 0.097 15.100 2025/04/10 16:35:00 0.091 15.100 2025/04/10 16:30:00 0.090 15.100 2025/04/10 16:25:00 0.077 15.100 2025/04/10 16:20:00 0.056 15.100 2025/04/10 16:15:00 0.061 15.100 2025/04/10 16:10:00 0.062 15.100 2025/04/10 16:05:00 0.082 15.100 2025/04/10 16:00:00 0.092 15.100 2025/04/10 15:55:00 0.095 15.100 2025/04/10 15:50:00 0.098 15.100 2025/04/10 15:45:00 0.101 15.100 2025/04/10 15:40:00 0.108 15.100 2025/04/10 15:35:00 0.099 15.100 2025/04/10 15:30:00 0.112 15.100 2025/04/10 15:25:00 0.097 15.100 2025/04/10 15:20:00 0.110 15.100 2025/04/10 15:15:00 0.097 15.100 2025/04/10 15:10:00 0.114 15.100 2025/04/10 15:05:00 0.101 15.100 2025/04/10 15:00:00 0.105 15.100 2025/04/10 14:55:00 0.102 15.100 2025/04/10 14:50:00 0.103 15.100 2025/04/10 14:45:00 0.100 15.100 2025/04/10 14:40:00 0.102 15.100 2025/04/10 14:35:00 0.100 15.100 2025/04/10 14:30:00 0.116 15.100 2025/04/10 14:25:00 0.107 15.100 2025/04/10 14:20:00 0.098 15.100 2025/04/10 14:15:00 0.098 15.100 2025/04/10 14:10:00 0.101 15.100 2025/04/10 14:05:00 0.095 15.100 2025/04/10 14:00:00 0.092 15.100 2025/04/10 13:55:00 0.097 15.100 2025/04/10 13:50:00 0.090 15.100 2025/04/10 13:45:00 0.088 15.100 2025/04/10 13:40:00 0.086 15.100 2025/04/10 13:35:00 0.080 15.100 2025/04/10 13:30:00 0.077 15.100 2025/04/10 13:25:00 0.077 15.100 2025/04/10 13:20:00 0.075 15.100 2025/04/10 13:15:00 0.075 15.100 2025/04/10 13:10:00 0.075 15.100 2025/04/10 13:05:00 0.065 15.100 2025/04/10 13:00:00 0.076 15.100 2025/04/10 12:55:00 0.069 15.100 2025/04/10 12:50:00 0.057 15.100 2025/04/10 12:45:00 0.057 15.100 2025/04/10 12:40:00 0.054 15.100 2025/04/10 12:35:00 0.063 15.100 2025/04/10 12:30:00 0.048 15.100 2025/04/10 12:25:00 0.048 15.100 2025/04/10 12:20:00 0.046 15.100 2025/04/10 12:15:00 0.044 15.100 2025/04/10 12:10:00 0.044 15.100 2025/04/10 12:05:00 0.046 15.100 2025/04/10 12:00:00 0.039 15.100 2025/04/10 11:55:00 0.044 15.100 2025/04/10 11:50:00 0.040 15.100 2025/04/10 11:45:00 0.045 15.100 2025/04/10 11:40:00 0.039 15.100 2025/04/10 11:35:00 0.047 15.100 2025/04/10 11:30:00 0.038 15.100 2025/04/10 11:25:00 0.037 15.100 2025/04/10 11:20:00 0.038 15.100 2025/04/10 11:15:00 0.034 15.100 2025/04/10 11:10:00 0.035 15.100 2025/04/10 11:05:00 0.048 15.100 2025/04/10 11:00:00 0.038 15.100 2025/04/10 10:55:00 0.038 15.100 2025/04/10 10:50:00 0.041 15.100 2025/04/10 10:45:00 0.038 15.100 2025/04/10 10:40:00 0.043 15.100 2025/04/10 10:35:00 0.039 15.100 2025/04/10 10:30:00 0.041 15.100 2025/04/10 10:25:00 0.044 15.100 2025/04/10 10:20:00 0.046 15.100 2025/04/10 10:15:00 0.050 15.100 2025/04/10 10:10:00 0.052 15.100 2025/04/10 10:05:00 0.050 15.000 2025/04/10 10:00:00 0.049 15.000 2025/04/10 09:55:00 0.056 15.000 2025/04/10 09:50:00 0.057 15.000 2025/04/10 09:45:00 0.058 15.000 2025/04/10 09:40:00 0.058 15.000 2025/04/10 09:35:00 0.060 15.000 2025/04/10 09:30:00 0.062 15.000 2025/04/10 09:25:00 0.063 15.000 2025/04/10 09:20:00 0.060 15.000 2025/04/10 09:15:00 0.072 15.000 2025/04/10 09:10:00 0.062 15.000 2025/04/10 09:05:00 0.072 15.000 2025/04/10 09:00:00 0.065 15.000 2025/04/10 08:55:00 0.076 15.000 2025/04/10 08:50:00 0.077 15.000 2025/04/10 08:45:00 0.076 15.000 2025/04/10 08:40:00 0.077 15.000 2025/04/10 08:35:00 0.075 15.000 2025/04/10 08:30:00 0.077 15.000 2025/04/10 08:25:00 0.071 15.000 2025/04/10 08:20:00 0.073 15.000 2025/04/10 08:15:00 0.082 15.000 2025/04/10 08:10:00 0.076 15.000 2025/04/10 08:05:00 0.070 15.000 2025/04/10 08:00:00 0.063 15.000 2025/04/10 07:55:00 0.083 15.000 2025/04/10 07:50:00 0.073 15.000 2025/04/10 07:45:00 0.074 15.000 2025/04/10 07:40:00 0.072 15.000 2025/04/10 07:35:00 0.075 15.000 2025/04/10 07:30:00 0.078 15.000 2025/04/10 07:25:00 0.077 15.000 2025/04/10 07:20:00 0.077 15.000 2025/04/10 07:15:00 0.094 15.000 2025/04/10 07:10:00 0.093 15.000 2025/04/10 07:05:00 0.084 15.000 2025/04/10 07:00:00 0.092 15.000 2025/04/10 06:55:00 0.083 15.000 2025/04/10 06:50:00 0.097 15.000 2025/04/10 06:45:00 0.101 15.000 2025/04/10 06:40:00 0.098 15.000 2025/04/10 06:35:00 0.098 15.000 2025/04/10 06:30:00 0.098 15.000 2025/04/10 06:25:00 0.104 15.000 2025/04/10 06:20:00 0.106 15.000 2025/04/10 06:15:00 0.093 15.000 2025/04/10 06:10:00 0.108 15.000 2025/04/10 06:05:00 0.092 15.000 2025/04/10 06:00:00 0.096 15.000 2025/04/10 05:55:00 0.108 15.000 2025/04/10 05:50:00 0.110 15.000 2025/04/10 05:45:00 0.107 15.000 2025/04/10 05:40:00 0.109 15.000 2025/04/10 05:35:00 0.099 15.000 2025/04/10 05:30:00 0.097 15.000 2025/04/10 05:25:00 0.100 15.000 2025/04/10 05:20:00 0.101 15.000 2025/04/10 05:15:00 0.113 15.000 2025/04/10 05:10:00 0.109 15.000 2025/04/10 05:05:00 0.112 15.000 2025/04/10 05:00:00 0.102 15.000 2025/04/10 04:55:00 0.108 15.000 2025/04/10 04:50:00 0.120 15.000 2025/04/10 04:45:00 0.113 15.000 2025/04/10 04:40:00 0.122 15.000 2025/04/10 04:35:00 0.109 15.000 2025/04/10 04:30:00 0.123 15.000 2025/04/10 04:25:00 0.125 15.000 2025/04/10 04:20:00 0.127 15.000 2025/04/10 04:15:00 0.123 15.000 2025/04/10 04:10:00 0.129 15.000 2025/04/10 04:05:00 0.114 15.000 2025/04/10 04:00:00 0.120 15.000 2025/04/10 03:55:00 0.123 15.000 2025/04/10 03:50:00 0.122 15.000 2025/04/10 03:45:00 0.118 15.000 2025/04/10 03:40:00 0.123 15.000 2025/04/10 03:35:00 0.127 15.000 2025/04/10 03:30:00 0.119 15.000 2025/04/10 03:25:00 0.119 15.000 2025/04/10 03:20:00 0.118 15.000 2025/04/10 03:15:00 0.116 15.000 2025/04/10 03:10:00 0.119 15.000 2025/04/10 03:05:00 0.116 15.000 2025/04/10 03:00:00 0.128 15.000 2025/04/10 02:55:00 0.128 15.000 2025/04/10 02:50:00 0.132 15.000 2025/04/10 02:45:00 0.123 15.000 2025/04/10 02:40:00 0.132 15.000 2025/04/10 02:35:00 0.120 15.000 2025/04/10 02:30:00 0.126 15.000 2025/04/10 02:25:00 0.121 15.000 2025/04/10 02:20:00 0.121 15.000 2025/04/10 02:15:00 0.120 15.000 2025/04/10 02:10:00 0.121 15.000 2025/04/10 02:05:00 0.120 15.000 2025/04/10 02:00:00 0.120 15.000 2025/04/10 01:55:00 0.120 15.000 2025/04/10 01:50:00 0.133 15.000 2025/04/10 01:45:00 0.120 15.000 2025/04/10 01:40:00 0.122 15.000 2025/04/10 01:35:00 0.120 15.000 2025/04/10 01:30:00 0.124 15.000 2025/04/10 01:25:00 0.132 15.000 2025/04/10 01:20:00 0.123 15.000 2025/04/10 01:15:00 0.128 15.000 2025/04/10 01:10:00 0.120 15.000 2025/04/10 01:05:00 0.123 15.000 2025/04/10 01:00:00 0.126 15.000 2025/04/10 00:55:00 0.121 15.000 2025/04/10 00:50:00 0.123 15.000 2025/04/10 00:45:00 0.132 15.000 2025/04/10 00:40:00 0.124 15.000 2025/04/10 00:35:00 0.125 15.000 2025/04/10 00:30:00 0.126 15.000 2025/04/10 00:25:00 0.134 15.000 2025/04/10 00:20:00 0.139 15.000 2025/04/10 00:15:00 0.130 15.000 2025/04/10 00:10:00 0.129 15.000 2025/04/10 00:05:00 0.133 15.000 2025/04/10 00:00:00 0.125 15.000