Find out how owners, developers, and design teams of new commercial buildings have benefited from participating in the New Construction Program to create better, more energy-efficient spaces and buildings. Success stories
|
For more infoTo learn more about how we can help you design and build a high-performance building, contact us or call 1 866 522 4713. |
| Project | Description | Energy Conservation Measures Installed | Owner / Developer & Design Team |
| Vancouver Convention Centre, Vancouver | Convention Centre Size: 1.1 million sq ft and 40% built over water Built: March 2009 |
| Developer: Vancouver Convention Centre Expansion Project Ltd. Architects:
Energy Modeller: Stantec Consulting Ltd. Electrical Consulting Engineers: Schenke/Bawol Engineering Ltd. Lighting Designer: Horton Lees Brogden Lighting Design Mechanical Engineer: Stantec Consulting Ltd. |
| Project | Description | Energy Conservation Measures Installed | Owner / Developer & Design Team |
Robert Ho Research, Health Sciences Centre Vancouver General Hospital, Vancouver | Hospital Size: 60,000 sq ft Built: June 2011 |
| Owner: Vancouver Coastal Health Authority Architect: C.E.I. & Musson Cattell Mackey Partnership Energy Modeller: Cobalt Engineering Electrical and Lighting Designer: MMM Engineering Mechanical Engineer:Cobalt Engineering |
| Vernon Jubilee Hospital Polson Tower, Vernon | Hospital Size: 223,600 sq ft Built: May 2011 |
| Owner: Interior Health Authority and Infusion Health Architect: Stantec Architecture Ltd. Energy Modeler: Stantec Consulting Ltd. Electrical and Lighting Designer: Stantec Consulting Ltd. Mechanical Engineer: Stantec Consulting Ltd. |
| Project | Description | Energy Conservation Measures Installed | Owner / Developer & Design Team |
| Sparkling Hill Resort, Vernon | Hotel and Spa Resort Size: 240,000 sq ft Built: May 2010 |
| Owner: 460463 B.C. LTD Architect: Cannon Design Energy Modeller: Stantec Consulting Ltd. Electrical/Lighting Designer: Stantec Consulting Ltd. and Applied Engineering Solutions Ltd. Mechanical Engineer: Stantec Consulting Ltd. |
| Project | Description | Energy Conservation Measures Installed | Owner / Developer & Design Team |
Mews University of B.C., Vancouver | Mixed use Size: 84,000 sq ft Built: February 2011 |
| Owner: UBC Properties Trust Architect: Rositch Hemphill and Associates Architects Energy Modeller: EnerSys Analytics Inc. Electrical/Lighting Designer: Jarvis Engineering Consultants Ltd. Mechanical Engineer: MCW Consultants |
| Sto:lo Resource Centre, Chilliwack | Mixed use Size: 24,800 sq ft Built: October 2010 |
| Owner: Sto:lo Nation Canada Architect: Patrick R. Stewart Architect Electrical/Lighting Designer: Murphy Design Services Energy Modeller: Stantec Consulting Mechanical Engineer: Stantec Consulting |
| The Hudson, Victoria | Mixed use Size: 185,000 sq ft 152 residential suites and 38,000 sq ft commercial space Built: September 2010 |
| Owner: Townline Group of Companies Architect: Merrick Architecture – Borowski Sakumoto Fligg Limited Electrical Engineers & Exterior Lighting Designer: Nemetz (S/A) & Associates Ltd. Interior Lighting in coordination with the Interior Designer: Nemetz (S/A) & Associates Ltd. Energy Modeller: Shaun Martin Consuting Mechanical Engineer: The AME Consulting Group Ltd. |
| Grandview Woodlands, Vancouver | Mixed use Size: 60,000 sq ft Built: April 2010 |
| Owner: Wesgroup Properties Architect: IBI Group Energy Modeller: Cobalt Engineering Electrical/Lighting Designer: MMM Group Ltd. Mechanical Engineer: Cobalt Engineering |
| Sunrise Building, Vancouver | Mixed use Size: 64,000 sq ft Built: December 2009 |
| Owner: D. Bosa Land Corp Architect: Ron Allen Architect Inc. Energy Modeller: Cobalt Engineering Electrical/Lighting Designer: Cobalt Engineering Mechanical Engineer: Cobalt Engineering |
| Liberty Homes Ltd., Burnaby | Mixed use Size: 126,000 sq ft Built: July 2009 |
| Developer: Liberty Homes Ltd. Architect: Neale Staniszkis Doll Adams Architects Energy Modeller: Cobalt Engineering Electrical/Lighting Designer: DF & Associates Consulting Ltd. Mechanical Engineer: Cobalt Engineering |
Dockside Green | Mixed use residential Built: March 2009 Size: 6 separate buildings with over 335,000 sq ft Both phases tied for highest LEED Platinum score world-wide. |
| Developer: Vancity Architects: Perkins+Will Canada Energy Modeller:
Electrical/Lighting Designer: Stantec Consulting Ltd. Mechanical Engineer: Stantec Consulting Ltd. |
| Project | Description | Energy Conservation Measures Installed | Owner / Developer & Design Team |
| The Atrium, Victoria | Office 190,000 sq ft Built: September 2010 |
| Owner: Jawl Properties Ltd. Architect: D'Ambrosio architecture & urbanism Electrical/Lighting Designer: Applied Engineering Solutions Ltd. Energy Modeller: GENIVAR formerly Hirschfield Williams Timmins Ltd. Mechanical Engineer: GENIVAR formerly Hirschfield Williams Timmins Ltd. High Performance Building Consultant: SES Consulting |
| Discovery Green, Burnaby | Office, Dry Lab Size: 153,276 sq ft Built: July 2009 |
| Developer: Discovery Parks Trust Architect: B+H BuntingCoady *This project was completed by Bunting Coady Architects, whose operations were acquired by B+H in December 2010. Energy Modeller: Cobalt Engineering Electrical/Lighting Designer: Cobalt Engineering Mechanical Engineer: Cobalt Engineering |
| Project | Description | Energy Conservation Measures Installed | Owner / Developer & Design Team |
Learning and Innovation Centre Royal Roads University , Victoria | Post Secondary Size: 60,000 sq ft Built: March 2011 |
| Owner: Royal Roads University Architect: Jensen Chernoff Thompson Architects Electrical/Lighting Designer: Applied Engineering Solutions Ltd. Energy Modeller: The AME Consulting Group Ltd. Mechanical Engineer: The AME Consulting Group Ltd. |
New Cowichan Campus Vancouver Island University, Cowichan | Post Secondary Size: 50,000 sq ft Built: March 2011 |
| Owner: Vancouver Island University Architect: Garyali Architect Inc. Electrical/Lighting Designer: Applied Engineering Solutions Ltd. Energy Modeller: The AME Consulting Group Ltd. Mechanical Engineer: The AME Consulting Group Ltd |
SW1 Gateway Building BC Institute of Technology, Burnaby | Post Secondary Size: 100,000 sq ft Built: March 2011 |
| Owner: BC Institute of Technology Architect: DIALOG Electrical/Lighting Designer: Stantec Consulting Ltd. Energy Modeller: Stantec Consulting Ltd. Mechanical Engineer: Stantec Consulting Ltd. |
| Project | Description | Energy Conservation Measures Installed | Owner / Developer & Design Team |
| Richmond Olympic Oval, Richmond | Recreational building Size: 363,280 sq ft Built: September 2008 |
| Owner: City of Richmond Architect: Cannon Design Energy Modeller: Stantec Consulting Ltd. Electrical/Lighting Designer: Stantec Consulting Ltd. Mechanical Engineer: Stantec Consulting Ltd. |
| Project | Description | Energy Conservation Measures Installed | Owner / Developer & Design Team |
| Canada Line Stations, Vancouver, Richmond | Transportation stations 16 stations Built: August 2009 |
| Developer: InTransitBC Limited Partnership Design Lead: SNC-Lavalin Inc. Architects:
Lighting Designer: Total Lighting Solutions Electrical/Lighting designer:
|