Site C Reports

river and fields

When Site C was examined as a resource option more than 25 years ago and again from 1989 to 1991, significant engineering design work and environmental studies were conducted.

However, much of this information is now more than two decades old. Stage 2 work involves extensive engineering, environmental and technical work to further define the project, to update decades-old studies, and to conduct new studies and technical work.

pine leaf

Consultation Reports and Documents

A compilation of completed reports and documents on consultation for the current stage of the project: Stage 2, Project Definition and Consultation. Stage 2 commenced December 2007.

river and mountains

Project Summary Reports

This section houses major summary reports related to the Site C Project.

steep slope

Engineering and Technical Reports

A compilation of engineering and technical reports conducted for the Site C Project.

North Shore river

Environment and Socio-Economic Reports

A compilation of reports on environment and socio-economic studies conducted for the Site C Project on the Peace River and surrounding area.

old assembly

Archived Site C Reports

Reports and documents from the 1980s and the 1990s review of the Site C Project.

Last Modified: Oct 30, 2009