VI CFT Sea Breeze IR 1 - BC Hydro Responses 1 to 25 Make Text Larger Make Text Smaller Print This Page

To facilitate the downloading of files using either a broadband or dial-up Internet connection, we present the following documents in two different formats - larger file sizes for broadband and smaller file sizes for dial-up.

Document Date Filed
Broadband
SEABREEZE IR 1_001_00 to 1_025_00  [PDF, 241 Kb] December 21, 2004
Dial-up
SEABREEZE IR 1_001_00 What information provided to intervenors to determine if BCH aqcquiring energy at least cost  [PDF, 48 Kb] December 21, 2004
SEABREEZE IR 1_002_00 Contingency plan for Duke Point if both 500 kV lines fail on VI  [PDF, 51 Kb] December 23, 2004
SEABREEZE IR 1_003_00 Reasons for Duke Point preference over HVDC link when both create dependency for off island generation  [PDF, 45 Kb] December 21, 2004
SEABREEZE IR 1_004_00 SBP_RTS and BCH P3 considered for reduced cost to rate base  [PDF, 44 Kb] December 21, 2004
SEABREEZE IR 1_005_00 Public review by BCUC with unknown gas and electricity costs  [PDF, 44 Kb] December 21, 2004
SEABREEZE IR 1_006_00 REVISED Expected yearly gas consumption of Duke Point in the VICFT  [PDF, 46 Kb] January 16, 2005
SEABREEZE IR 1_007_00 Duke Point run as peaking plant or must run  [PDF, 45 Kb] December 21, 2004
SEABREEZE IR 1_008_00 If DP supplies peak consumption how is Pristine Power compensated for standby time  [PDF, 45 Kb] December 21, 2004
SEABREEZE IR 1_009_00 Costs associated with Kyoto requirements  [PDF, 45 Kb] December 21, 2004
SEABREEZE IR 1_010_00 Expected peak gas consumption of Duke Point  [PDF, 44 Kb] December 21, 2004
SEABREEZE IR 1_011_00 Price at which Duke Point will buy natural gas  [PDF, 45 Kb] December 21, 2004
SEABREEZE IR 1_012_00 Utilization of Island Cogeneration Plant operating at 240 MW  [PDF, 43 Kb] December 21, 2004
SEABREEZE IR 1_013_00 Price Island Cogeneration Plant pays for natural gas  [PDF, 42 Kb] December 21, 2004
SEABREEZE IR 1_014_00 Heat rate of Island Cogeneration Plant  [PDF, 42 Kb] December 21, 2004
SEABREEZE IR 1_015_00 BCH expected future price for natural gas 2007 through 2042  [PDF, 46 Kb] December 21, 2004
SEABREEZE IR 1_016_00 How future price of natural gas determined 2007 to 2042  [PDF, 47 Kb] December 21, 2004
SEABREEZE IR 1_017_00 Use of gas forecasts instead of gas forward prices as basis of expected future price  [PDF, 49 Kb] December 21, 2004
SEABREEZE IR 1_018_00 In forecasts for 2003 VIEC VIGP BCUC decision what was expected gas price for 2004  [PDF, 65 Kb] December 21, 2004
SEABREEZE IR 1_019_00 Quebec wind RFP electricity price differs from BCH projection  [PDF, 48 Kb] December 21, 2004
SEABREEZE IR 1_020_00 If Duke Point operational from Jan_04 what would its total standby and electricity cost per kW be  [PDF, 45 Kb] December 21, 2004
SEABREEZE IR 1_021_00 In BCH gas utilization models what is expected heat rate of new CCGT plants after 2007  [PDF, 48 Kb] December 21, 2004
SEABREEZE IR 1_022_00 Under BCH models what is the expected heat rate of new SCGT plants after 2007  [PDF, 46 Kb] December 21, 2004
SEABREEZE IR 1_023_00 In new generation built after 2007 what part will be CCGT and what part SCGT  [PDF, 46 Kb] December 21, 2004
SEABREEZE IR 1_024_00 Will increase in demand from Duke Point increase price of natural gas for all VI customers  [PDF, 45 Kb] December 21, 2004
SEABREEZE IR 1_025_00 How much does Duke Point reduce Expected Energy Not Served on VI in 2007  [PDF, 48 Kb] December 21, 2004

Last Modified: Jan 18, 2005

Tool Tip Text