VI CFT GRRA IR 1 - BC Hydro Responses 1 to 8
To facilitate the downloading of files using either a broadband or dial-up Internet connection, we present the following documents in two different formats - larger file sizes for broadband and smaller file sizes for dial-up.
| Document | Date Filed |
| Broadband |
| GRRA IR 1_001_00 to 1_008_00 [PDF, 364 Kb] | December 21, 2004 |
| Dial-up |
| GRRA IR 1_001_00 Cost of providing alt supplies to cover shut down of proposed power plant [PDF, 55 Kb] | December 21, 2004 |
| GRRA IR 1_002_00 Cost estimate 13 years in the future long range cost to taxpayers [PDF, 59 Kb] | December 21, 2004 |
| GRRA IR 1_003_00 Concurrent load shedding to use existing 2400MW capacity of Cheekeye to Dunsmuir power line [PDF, 44 Kb] | December 21, 2004 |
| GRRA IR 1_004_00 Surplus gas turbines originally for the DPP in the Burrard Thermal plant to generate required power deficit [PDF, 43 Kb] | December 21, 2004 |
| GRRA IR 1_005_00 Dual meters and lower cost on an interruptible supply in some homes on Gabriola [PDF, 53 Kb] | December 21, 2004 |
| GRRA IR 1_006_00 Natural gas piped supply [PDF, 44 Kb] | December 21, 2004 |
| GRRA IR 1_007_00 Social cost of implementing DPPP by ignoring significant public input requesting green alternatives [PDF, 44 Kb] | December 21, 2004 |
| GRRA IR 1_008_00 Times Colonist press release proposing a 1110MW capacity transmission line between Victoria and Port Angeles [PDF, 45 Kb] | December 21, 2004 |
Last Modified: Dec 22, 2004