VI CFT Bob McKechnie IR 1 - BC Hydro Responses 1 to 15
To facilitate the downloading of files using either a broadband or dial-up Internet connection, we present the following documents in two different formats - larger file sizes for broadband and smaller file sizes for dial-up.
| Document | Date Filed |
| Broadband |
| MCKECHNIE IR 1_001_00 to 1_015_00 [PDF, 720 Kb] | December 21, 2004 |
| Dial-up |
| MCKECHNIE IR 1_001_00 commitment to install new 230kv cable [PDF, 43 Kb] | December 21, 2004 |
| MCKECHNIE IR 1_002_00 potential peak demand shortfalls [PDF, 44 Kb] | December 21, 2004 |
| MCKECHNIE IR 1_003_00 is the amount of peak power less than 5 percent of what a 252 mw generating plant would produce [PDF, 52 Kb] | December 21, 2004 |
| MCKECHNIE IR 1_004_00 are n2 or worse failures taken into consideration [PDF, 48 Kb] | December 21, 2004 |
| MCKECHNIE IR 1_005_00 alternative possible solutions [PDF, 53 Kb] | December 23, 2004 |
| MCKECHNIE IR 1_006_00 if alternatives presented in 5_0 have no potential please explain [PDF, 44 Kb] | December 21, 2004 |
| MCKECHNIE IR 1_007_00 for alternatives presented in 5_0 that have potential provide estimates of capacity and energy [PDF, 49 Kb] | December 21, 2004 |
| MCKECHNIE IR 1_008_00 provide similar or equivalent triple bottom line figures for the dpp epa proposal [PDF, 45 Kb] | December 21, 2004 |
| MCKECHNIE IR 1_009_00 what will happen if cost of electricity at dpp exceeds export price [PDF, 48 Kb] | December 21, 2004 |
| MCKECHNIE IR 1_010_00 provide analysis showing ratepayer accrued value if vicp ccgt equipment was installed at burrard thermal [PDF, 43 Kb] | December 21, 2004 |
| MCKECHNIE IR 1_011_00 provide open market price for residual vigp assets being sold elsewhere [PDF, 45 Kb] | December 21, 2004 |
| MCKECHNIE IR 1_012_00 if epa not approved what is bch backup plan [PDF, 46 Kb] | December 21, 2004 |
| MCKECHNIE IR 1_013_00 demonstrate least cost solution [PDF, 62 Kb] | December 23, 2004 |
| MCKECHNIE IR 1_014_00 provide information about bch directives [PDF, 41 Kb] | December 21, 2004 |
| MCKECHNIE IR 1_015_00 rational for recommending gas fired generation [PDF, 46 Kb] | December 21, 2004 |
Last Modified: Jan 6, 2005