This project upgrade will meet modern safety and seismic requirements and replace the powerhouse equipment, which is in poor condition. It is expected to take six years to complete and includes:
Reinforcement of the right bankThe right bank supports the right end of the dam and is founded on a rock ridge 15 metres below the crest of the dam. It consists mainly of glacial silts and erodible sands. The upstream face of this bank is protected by a concrete gravity wall. This area has experienced seepage and piping issues since the project was commissioned in the 1930s. This seepage has been monitored since the 1930's and has, over time, weakened the bank. BC Hydro is proposing to reinforce the right bank by:
Seismic upgrade of the dam and water intakesSpillway piers and gatesSpillway gates are moveable water barriers that retain the reservoir while also being able to discharge water when required. The spillway gates must be able to operate reliably following an earthquake and safely pass water during a significant flood event. Once the Ruskin Project is complete, BC Hydro expects that the piers and spillway gates would be able to survive a significant earthquake and be able to operate reliably. Seismic stability of the water intake and conveyance structuresThe water intake structures (e.g. tunnels and penstocks that move the water from the reservoir to the powerhouse) for unit 1 and 2 are in relatively good shape and will require only minor repairs. Some additional work is required on the unit 3 water intakes to address some seepage issues. Powerhouse upgradesThe powerhouse building will be seismically upgraded to meet modern building code standards, and the heritage façade will be restored. Inside, BC Hydro will replace most of the existing powerhouse equipment, including the three turbines and generators. The generating units will be replaced sequentially, allowing the facility to remain in service during project construction. Relocation of the switchyardThe switchyard will be moved off the powerhouse roof. A new switchyard will be built on the left bank hill behind the powerhouse. |
Contact usIf you would like to learn more about the project, please contact us by: Toll free: 1 866 647 3334 |
Last Modified: Apr 11, 2012