Stave Falls Image Library

Stave Falls Spillway Gates Reliability Project

The new radial gate is hoisted over the dam, ready for installation.

Small [JPEG, 249 KB] | Large [JPEG, 432 KB]

Stave Falls Spillway Gates Reliability Project

A 200,000 kg crane hoists the first of four new spillway gates into position.

Small [JPEG, 143 KB] | Large [JPEG, 258 KB]

Stave Falls Spillway Gates Reliability Project

New radial gate is prepared for installation in the Blind Slough Dam at Stave Falls.

Small [JPEG, 209 KB] | Large [JPEG, 353 KB]

Stave Falls Blind Slough Dam present day

Small [JPEG, 396 KB] | Large [JPEG, 772 KB]

Factory Assurance Test of New Gates
(Ebco Industries)

Small [JPEG, 593 KB] | Large [JPEG, 1.0 MB]

Stave Falls Blind Slough Dam early 1900s

Small [JPEG, 262 KB] | Large [JPEG, 510 KB]

Richmond East MLA Linda Reid, Richmond-Steveston MLA John Yap and Richmond Centre MLA Rob Howard join Gary Herman of Ebco Industries in front of one of the new spillway gates built on site that are destined for Stave Falls Dam. Ebco Industries received a $1.3 million contract to build four new spillway gates for BC Hydro's Stave Falls upgrades.

Small [JPEG, 473 KB] | Large [JPEG, 903 KB]