Regulatory Documents

For F2005/06 revenue requirements application

The Regulatory Timetable, Application and selected Regulatory Documents are set out below. To access other Regulatory Documents use the links provided on the right-hand side of this page under IN THIS SECTION.

British Columbia Utilities Commission decision

BC Hydro's final argument

Hearing issues list

Regulatory timetable

Revenue requirements application

Application filed with the BCUC on December 15, 2003

To facilitate the downloading of files using either a broadband or dial-up Internet connection, we present the following documents in two different formats - larger file sizes for broadband and smaller file sizes for dial-up.

Broadband

Volume 1

Volume 2

Dial-up

Volume 1

Volume 2